4 DUKE POWER GOMPAhT P.O. BOX 33180 CitAHLOTTE, N.C. 28242 HAL H. TUCKER Tet_Erno.w vuom ersiesne (704) 373-4531 January 10, 1985

===*= - -

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

Dear Mr. Denton:

On January 8, 1985, Duke Power Company submitted the Inservice Inspection Plan for the Catawba Nuclear Station. This document described the ISI program including applicable codes and standards, inspection methods and components to be examined. As noted in the Table of Contents of the Plan, the detailed inspection plans for each unit are in preparation and would be issued at a later date. This is to advise that the detailed inspection plan for Unit I will be submitted for NRC Staff review by May 31, 1985 and six months after fuel load for Unit 2.

Very truly yours, 7

e Hal B. Tucker ROS: sib cc:

Mr. James P. O'Reilly, Regional Administrator Palmetto Alliance U. S. Nuclear Regulatory Commission 2135 Devine Street Region II Columbia, South Carolina 29205 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Robert Guild, Esq.

NRC Resident Inspector P. O. Box 12097 Catawba Nuclear Station Charleston, South Carolina 29412 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place I

Charlotte, North Carolina 28207 tQ i

0501150225 850110 PDR ADOCK 05000413 G