Responds to NRC Re Violations Noted in Insp Rept 50-412/84-10.Corrective Actions:Survey Taken to Identify Motors Requiring Storage Under Level B Requirements. Actions Completed on 840824
ML20112E651
Person / Time
Site: Beaver Valley
Issue date: 01/04/1985
From: Woolever E
DUQUESNE LIGHT CO.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
2NRC-5-001, 2NRC-5-1, NUDOCS 8501150215
Download: ML20112E651 (3)


Text

T A d.

-M ouquesne uet

==

ai 2i 923-im uuci..r con.iruction owan No',"O'ns*2$s*"' '* *""'

$, i9$5 n ar United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION: Mr. Richard W. Starostecki Division of Project and Resident Programs

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 USNRC IE Inspection Report 50-412/84-10 Gentlemen:

In a letter to Mr. E. J. Woolever, dated December 5,1984, you trans-mitted a Notice of Violation as Appendix A.

This is Duquesne Light Company's response pursuant to the requirements of 10 CFR 2.201 and that Notice of Viola-tion.

Notice of Violation:

As a result of the inspection conducted on August 13-17, 1984, and in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C), the follow-ing violation was identified:

10 CFR 50, Appendix B, Criterion XIII states in part that " mea-sures shall be established to control the storage and handling of material and equipment in accordance with work and inspection instruction to prevent damage or deterioration."

FSAR Table 1.8-1 identified that the quality assurance require-ment for storage and handling complies with Regulatory Guide 1.38, 1977 which endorese ANSI 45.2.2, 1972.

Paragraph 6.2.2, Item 1 of ANSI 45.2.2 states in part, " covers removed for internal access at any time for any reason shall be immediately replaced and resealed af ter completion of the pur-pose for removal."

Contrary to the above, on August 15, 1984, while in Warehouse B storage Level B area, the inspector noted that one Limitorque valve motor which required Level B storage was not sealed,

exposing the internal to the environment.

This is a Severity Level V Violation (Supplement II).

8501150215 850104 PDR ADOCK 05000412 1

y 0

PM g

/ E.

vi

r United States Nuclear Regulatory Commission Mr. Richard W. Starostecki Pag'e 2 Pursuant to the provisions of 10 CFR 2.201, Beaver Valley Power Sta-tion is hereby required to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be will be achieved.

Where good cause is shown, consideration will be given to extending this response time.

Response

Corrective Action Taken A survey was conducted to identify motors in site warehouse areas which require storage under Level B requirements.

Eighty-four 184) motors were determined to belong in this category.

The storage / packing of sixty-four (64) of these motors had been modified to facilitate meggering. The stor-age of these motors has been restored to the "as-received" condition, in compliance with ANSI 45.2.2, 1972. These actions were completed on August 24, 1984.

Corrective Steps to Avoid Further Violations The monthly megger testing frequency specifled in DVPS-2 documents has been changed to reduce the frequency of opening the protective coverings for these motors. The monthly frequency was in excess of that required by applicable standards.

The megger tests are now required upon receipt of the equipment and again at time of system turnover.

The applicable sec-tions or attributes of 2 BVS-921 and 2 BVS-981 shall be revised to reflect this change.

This reduced meggering frequency will enhance protection of the equipment by minimizing removal of protective covers.

Job site training meetings were conducted to ensure that the field craf ts-men, foremen, and supervisors understand the storage level maintenance requi rements.

Date When Full Compliance Will Be Achieved All the above actions have been completed.

DLC believes that these actions ensure compliance with ANSI 45.2.2, 1972 as endorsed by Regulatory Guide 1.38,1973 which was specified in PSAR Chapter 17.

DUQUESNE LIGHT COMPANY By E. V. Woolever Vice President RW/sim NR NR R NSE SUBSCRIBED AND SWO N TO BEF0hE ttE 1111S B. K. Singh d DAY OF oth.< TAM", 1985.

NRC Document Control Desk g

[

M ANITA ELAINE REITER, NOTARY PUdk ROBINS 0fl TO'ANSHIP, ALLEGHENY COUNTY MY COMMISSION EXPIRES OCTOCER 20,1936

United States Nuclear Regulatory Commission Mr. Richard W. Starostecki Page 3 COMMONWEALTH OF PENNSYLVANIA )

)

SS:

COUNTY OF ALLEGHZNY

)

//I day of h/xtutu

///8, before me, a On this Notary Public in and for said C[mmonwealt$ and County, personally appeared E. J. Woolever, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge.

i f

Notary Public ANITA ELAINE REITER, NOTARY PUOLtc RODINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXPIRES OCTOBER 20,1986