Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML11112A028 | 31 March 2011 | Response to Request for Additional Information Regarding Request for Approval of the Cyber Security Plan | Cyber Security |
ML110910147 | 31 March 2011 | Decommissioning Funding Report | |
ML110890832 | 30 March 2011 | Generic Fundamentals Examination Results | Generic Fundamentals Examination |
ML110900379 | 30 March 2011 | Nuclear Property Insurance | |
TAC:ME5532 | 30 March 2011 | ||
ML110900660 | 30 March 2011 | Decommissioning Funding Report as of December 31, 2010 | |
IR 05000361/2011201 | 25 March 2011 | IR 05000361-11-201 & 05000362-11-201, on 01/13/11, San Onofre Nuclear Generating Station - NRC Security | Significance Determination Process Affidavit |
ML110871482 | 25 March 2011 | Independent Spent Fuel Storage Installation, Summary Report of Commitment Changes Implemented During the Period from December 19, 2008, Through March 17, 2011 | Operability Determination |
ML12275A474 | 24 March 2011 | Exhibit 3 to ROI, Case No. 4-2011-024 - Transcript of Interview | |
ML12118A099 | 17 March 2011 | SO123-ODCM, Revision 5, Offsite Dose Calculation Manual. Enclosure 2 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML110800391 | 16 March 2011 | G20110188/LTR-11-0127/EDATS: SECY-2011-0149 - Ltr. Barbara Boxer & Dianne Feinstein Safety of Nuclear Power Plants - Earthquake Faults | Earthquake |
ML110760485 | 16 March 2011 | Third Ten-Year Inservice Interval Relief Request ISI-3-31, Flaw Evaluation of High-Energy Schedule 10s Emergency Core Cooling System Piping | Time of Discovery High Radiation Area Mission time Through-Wall Leak |
ML11243A057 | 15 March 2011 | Notification Nn 200834923 | Unanalyzed Condition Mission time |
Press Release-11-043, NRC Continues to Track Earthquake and Tsunami Issues | 11 March 2011 | Press Release-11-043: NRC Continues to Track Earthquake and Tsunami Issues | Earthquake |
TAC:ME5807 | 10 March 2011 | ||
ML110680484 | 10 March 2011 | Notice of Meeting with Southern California Edison to Discuss Planned Submittal of a Comprehensive License Amendment Request to Revise Technical Specification for San Onofre Nuclear Generating Station to Better Align with Most Resent Changes | |
ML110980794 | 9 March 2011 | Southern California Edison - Response to the California Energy Commission Assembly Bill 1632 Report | |
ML110670698 | 8 March 2011 | Plume Phase Exercise Outreach Training March 24, 2011 | |
ML11242A233 | 8 March 2011 | Operating Instruction, Revision 47 | Time to boil Met Tower |
ML12192A503 | 4 March 2011 | ROI, Case No. 4-2010-060 | |
IR 05000361/2011001 | 4 March 2011 | Annual Assessment Letter for San Onofre Nuclear Generating Station (NRC Integrated Reports 05000361-11-001 and 05000362-11-001) | |
ML110730515 | 2 March 2011 | Somervell Training Center - Stc Annual Operator Employment Notices | |
ML110600650 | 1 March 2011 | Email, Draft Generic Request for Additional Information, License Amendment Request to Revise License Condition and Approve Cyber Security Plan | Cyber Security |
ML110600661 | 1 March 2011 | Draft Generic Request for Additional Information, License Amendment Request to Revise License Condition and Approve Cyber Security Plan | Cyber Security |
ML110610764 | 28 February 2011 | Independent Spent Fuel Storage Installation - Changes to the Physical Security Plan | |
ML110980789 | 28 February 2011 | Southern California Edison - Evaluation of California Energy Commission AB 1632 Report Recommendations | Earthquake Maintenance Rule Program |
ML110560866 | 25 February 2011 | IR 05000361-11-402 & 05000362-11-402, on 02/10/11, San Onofre Nuclear Generating Station, Units 2 And 3 | |
ML110550645 | 22 February 2011 | Core Operating Limits Report, for Cycle 16 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML11242A232 | 19 February 2011 | Notification N N 201340427 | Safe Shutdown Mission time Battery sizing |
ML110540074 | 17 February 2011 | Annual 10 CFR Part 26 Fitness for Duty Program Data - 2010 | Fitness for Duty |
ML110540075 | 17 February 2011 | Annual Reporting Form for Drug and Alcohol Tests for the 2010 | |
ML110540076 | 17 February 2011 | CFR Part 26, Subpart I - Managing Fatigue, for the Period of 2010 | |
IR 05000361/2010005 | 10 February 2011 | IR 05000361-10-005, 05000362-10-005, on 09/24/2010 -12/31/2010, San Onofre, Units 2 & 3, Integrated Resident & Regional Report, Focused Baseline Inspection of Maint. & Ops., Id. & Res. of Prob, Events F/U | Hot Short Safe Shutdown Unanalyzed Condition Boric Acid High winds High Radiation Area Offsite Dose Calculation Manual Water Inventory Control Safe Shutdown Earthquake Weld Overlay Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Temporary Modification VT-2 Missed surveillance Significance Determination Process Job Performance Measure Foreign Material Exclusion Large early release frequency Excess Flow Check Valve Operability Determination Fire Protection Program Dissimilar Metal Weld DM weld Substantial potential for overexposure Coast down Operability Assessment Overexposure |
ML110420203 | 10 February 2011 | Closure of Actions Required by Confirmatory Order EA-07-232 (Inspection Report 05000361/2011008 and 05000362/2011008) | |
IR 05000361/2011008 | 10 February 2011 | Letter from Elmo Collins, NRC Region IV, to Peter Dietrich, Southern California Edison Company, Subject: San Onofre Nuclear Generating Station - Closure of Action Required by Confirmatory Order EA-07-232 (Inspection Report 05000361/2011008 | |
ML11243A056 | 3 February 2011 | Notification Nn 200706227, 17 Pages | Unanalyzed Condition Mission time |
ML110330112 | 1 February 2011 | Retraction of Licensee Event Report No. 2010-002-00 | Earthquake |
ML110280246 | 31 January 2011 | Withdrawal of License Amendment Request to Revise Technical Specification Limiting Conditions for Operation Applicable to Movement of Fuel Assemblies | |
ML110280244 | 31 January 2011 | Letter, Withdrawal of License Amendment Request to Revise Technical Specification Limiting Conditions for Operation Applicable to Movement of Fuel Assemblies | |
ML110310623 | 28 January 2011 | Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2010 | Annual Radioactive Effluent Release Report |
ML110280380 | 27 January 2011 | Withdrawal of Amendment Applications 258 and 244 Proposed Change Number (PCN) 593 Technical Specifications Applicable to Movement of Fuel Assemblies | |
ML110260300 | 21 January 2011 | Generic Fundamentals Section of the Written Operator Licensing Examination | Generic Fundamentals Examination |
ML12192A504 | 20 January 2011 | ROI, Case No. 4-2010-061 | |
ML110200130 | 19 January 2011 | Emergency Response Data System | |
ML12118A318 | 14 January 2011 | Letter to Peter Dietrich, Request for Information | Past operability |
ML110120630 | 12 January 2011 | License Amendment Request to Support Use of Areva Nuclear Fuel, Slides from 1/12/2011 Meeting | |
IR 05000361/2010501 | 10 January 2011 | IR 05000361-10-501 & 05000362-10-501, on 12/31/2010, San Onofre Nuclear Generating Station, Units 2 and 3, NRC Emergency Preparedness Annual Inspection Report (Cover Letter) | |
TAC:ME5329 | 7 January 2011 | ||
ML110100732 | 7 January 2011 | Third Ten-Year Inservice Inspection (151) Interval 10CFR50.55a Requests 151-3-32, 151-3-33, and 151-3-34 San Onofre Nuclear Generating Station, Units 2 and 3 | Probabilistic Risk Assessment Pressure and Temperature Limits Report |
IR 05000361/2010006 | 6 January 2011 | Inspection Report 05000361-10-006, 05000362-10-006 and Notice of Violation, Errata - San Onofre Nuclear Generating Station - NRC Problem Identification & Resolution |