SOUTHERN CA LIFO RNIA Douglas R. Bauder

...... EDISON Site Vice President & Station Manager San Onofre Nuclear Generating Station An EDISON INT ERNATlONAL Compa ny 10 CFR 72.44(d)(3)

January 28, 2011 Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket Nos. 50-206, 50-361, 50-362, 72-41 Annual Radioactive Effluent Release Reportfor Independent Spent Fuel Storage Installation - 2010 San Onofre Nuclear Generation Station Units 1, 2 and 3

Dear Sir or Madam:

In accordance with 10 CFR 72.44(d)(3) and Certificate of Compliance No. 72-1029, Amendments 0 and 1, Technical Specification Section 5.2.3(c) , Southern California Edison (SCE) is providing the Annual Radioactive Effluen t Release Report for the Independent Spent Fuel Storage Installation (ISFSI) at San Onofre Nuclear Generating Station (SONGS).

The period of the report is January 1, 2010 through December 31, 2010 .

The dry shielded canisters are double seal welded and designed to meet the criteria of Interim Staff Guidance-18 and thus prevent effluent releases . In addition , we have completed in-process inspections and tests during the fabrication and sealing of the canisters in compliance with the amendments to the Certificate of Compliance stated above. On that basis , SCE is reporting there were no releases of principal radionuclides in liquid or gaseous effluents from the SONGS ISFSI to the environment in 2010.

If you require additional information , please contact Mr. Ryan I. Treadway at (949) 368-9985.

cc: Elmo E. Collins, NRC Regional Administrator, Region IV J. C. Shepherd, NRC Project Manager, SONGS Unit 1 G. G. Warnick, NRC Senior Reside nt Inspector, SONGS Units 2 and 3 C. M. Staab , NRC Project Manager, SONGS ISFSI P.O. Box 128 San Clemente, CA 92672 (949) 368-9275 PAX 89275 Fax: (949) 368-9881 Doug .Bauder@sce.com