February 10, 2011
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION - CLOSURE OF ACTIONS REQUIRED BY CONFIRMATORY ORDER EA-07-232 [INSPECTION REPORT 05000361/2011008 AND 05000362/2011008]
Dear Mr. Dietrich:
The NRC has completed sufficient independent inspection activities to conclude that Southern California Edison's corrective actions for Confirmatory Order EA-07-232 (ADAMS Reference ML080110380) have satisfied the terms of the Confirmatory Order.
On January 11, 2008; the NRC issued the enclosed Confirmatory Order to Southern California Edison (SCE) as a result of a Successful alternative dispute resolution mediation session between SCE and the NRC. The Confirmatory Order contained specific commitments, made by SCE as part of the settlement agreement in response to violations concerning the falsification of firewatch certification sheets on numerous occasions from April 2001 to December 2006.
The NRC conducted Confirmatory Order follow-up inspections to assess the adequacy, progress, and.sustainability of the corrective actions. The results of these inspections are documented in Inspection Report 05000361/362/2008012 (ML083390399), Inspection Report 05000361/362/2009003 (ML092120548), Inspection Report 05000361/362/2010010 (ML102420696), and Inspection Report 05000361/362/2010005. Based on the results of the follow-up inspections, the NRC has determined that SCE has satisfied the terms of the Confirmatory Order.
Southern California Edison-2-EA 07-232 In accordance with 10. CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely, IRAI Elmo E. Collins Regional Administrator Docket Nos. 50-361, 50-362 License Nos. NPF-10, NPF-15 Enclosure:
Confirmatory Order EA 07-232 (ML080110380)
Cc w/ enclosure:
Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101 Gary L. Nolff Assistant Director-Resources City of Riverside 3900 Main Street Riverside, CA 92522 Mark L. Parsons Deputy City Attorney City of Riverside 3900 Main Street
.Riverside, CA 92522 Gary H. Yamamoto, P.E., Chief Division of Drinking Water and Environmental Management 1616 Capitol Avenue, MS 7400 P.O. Box 997377 Sacramento, CA 95899-7377
Southern California Edison-3-EA 07-232 Michael L. DeMarco San Onofre Liaison San Diego Gas & Electric Company 8315 Century Park Ct. CP21C San Diego, CA 92123-1548 Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414 The Mayor of the City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)
Sacramento, CA 95814 Douglas K. Porter, Esquire Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Doug Bauder Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Steve Hsu Department of Health Services Radiologic Health Branch MS 7610, P.O. Box 997414 Sacramento, CA 95899-7414 R. St. Onge Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Chief, Technological Hazards Branch FEMA Region IX 1111 Broadway, Suite 1200 Oakland, CA 94607-4052
Southern California Edison-4-EA 07-232 Institute of Nuclear Power-Operations (INPO)
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339
Southern California Edison-5-EA 07-232 Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Vacant)
Senior Resident Inspector (Greg.Warnick@nrc.gov)
Senior Resident Inspector (TEMP) (John.Reynoso@nrc.gov)
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)
Senior Project Engineer (TEMP), DRP/D (Gerond.George@nrc.gov)
SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)
Project Engineer, DRP/D (Peter.Jayroe@nrc.gov)
Resident Inspector (TEMP), DRP/D (Zachary.Hollcraft@nrc.gov)
Public Affairs Officer (Victor. Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Randy.Hall@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
SeniorEnforcement Specialist (Ray.Kellar@nrc.gov)
Enforcement Specialist (Christi. Maier@nrc.gov)
Director, Office of Enforcement (Cynthia.Carpenter@nrc.gov)
OEMail Resource RidsOeMailCenter Inspection Reports/MidCycle and EOC Letters to the following:.
ROPreports Only inspection reports to ihe following:
OEDO RIV Coordinator (James.Trapp@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
Regional State Liaison Officer (Bill. Maier@nrc.gov)
File located: R:\\ REACTORS\\SONGS\\S0201 1008-RP-GAG.DOCX SUNSI Rev Compl. 1] Yes E No ADAMS Z] Yes 0 No TReviewer Initials GAG Publicly Avail j]
Yes E No Sensitive El Yes Z] No Sens. Type Initials GAG SPE:DRP/
C:DRP/PBD DD:DRP D:DRP SES:ORA GAGeorge RELantz TPruett KKennedy RKellar IRA/
IRA/
IRA/
/RA/
/RA/
2/7/11 2/8/11 2/8/11 2/8/11 2/8/11 DRA:ORA RA: ORA AHowell EECollins
/RA/
/RA/
02/10/11 02/10/11 Ur-NUML Mr-kUKLJ UUtT I =lelepnone I:z=l:-m ail F= Fax