Issue date | Title | Topic | |
---|---|---|---|
HL-1176, Forwards Updated Listing of Outstanding Licensing Requests for Plant,Tabulated Chronologically by Util Submittal Date | 12 September 1990 | Forwards Updated Listing of Outstanding Licensing Requests for Plant,Tabulated Chronologically by Util Submittal Date | |
HL-1278, Responds to NRC Re Violations Noted in Insp Repts 50-321/90-15 & 50-366/90-15.Corrective Actions: Mispositioned Valves 1E21-F025B & 1E21-F027B Placed in Correct Positions & Technicians Disciplined | 12 September 1990 | Responds to NRC Re Violations Noted in Insp Repts 50-321/90-15 & 50-366/90-15.Corrective Actions: Mispositioned Valves 1E21-F025B & 1E21-F027B Placed in Correct Positions & Technicians Disciplined | |
ELV-02056, Forwards Operator Exam Schedule for Facility,Per Generic Ltr 90-07 Request,Including Number of Candidates to Be Examined During NRC Site Visits,Requalification Schedules & Number of Candidates to Participate in Generic Fundamentals Exam | 6 September 1990 | Forwards Operator Exam Schedule for Facility,Per Generic Ltr 90-07 Request,Including Number of Candidates to Be Examined During NRC Site Visits,Requalification Schedules & Number of Candidates to Participate in Generic Fundamentals Exam | Generic Fundamentals Examination |
ELV-01599, Discusses Mods to HED-1114 Re Plant Dcrdr,Per . Amber Monitor Light Covers Installed for Spare Pumps to Make Status of Pumps Readily Apparent to Operator | 4 September 1990 | Discusses Mods to HED-1114 Re Plant Dcrdr,Per . Amber Monitor Light Covers Installed for Spare Pumps to Make Status of Pumps Readily Apparent to Operator | |
HL-1237, Requests Permission to Use Facility Reactor Bldg Crane to Move Large Shipping Casks,Per Tech Spec 3.10.F.1 & 4.10.F.1 | 4 September 1990 | Requests Permission to Use Facility Reactor Bldg Crane to Move Large Shipping Casks,Per Tech Spec 3.10.F.1 & 4.10.F.1 | Safe Shutdown Control of Heavy Loads |
ELV-01956, Forwards Listed Documents in Response to Request for Addl Info Re Settlement Monitoring Program,Per 900614 Request | 30 August 1990 | Forwards Listed Documents in Response to Request for Addl Info Re Settlement Monitoring Program,Per 900614 Request | Earthquake |
ELV-02059, Clarifies 900409 Response to 900323 Confirmation of Action Ltr.Util Made 31 Successful Start Attempts for Diesel Generator (DG) 1A & 29 Successful Start Attempts for DG 1B | 30 August 1990 | Clarifies 900409 Response to 900323 Confirmation of Action Ltr.Util Made 31 Successful Start Attempts for Diesel Generator (DG) 1A & 29 Successful Start Attempts for DG 1B | |
ELV-02050, Responds to Violations Noted in Insp Repts 50-424/90-08 & 50-425/90-08.Corrective Actions:Administrative Procedures Controlling Verification & Validation of Emergency Operating Procedures Will Be Evaluated & Revised as Required | 30 August 1990 | Responds to Violations Noted in Insp Repts 50-424/90-08 & 50-425/90-08.Corrective Actions:Administrative Procedures Controlling Verification & Validation of Emergency Operating Procedures Will Be Evaluated & Revised as Required | |
ML20028G844 | 27 August 1990 | Forwards Owners Data Rept for Inservice Insp Ei Hatch Nuclear Plant Unit 1 Feb-June 1990. | Weld Overlay |
ML20059C655 | 27 August 1990 | Informs of Intention to Transfer Right of Way for Road 451 to Appling County So Road Can Be Straightened & Paved. Transfer Will Have No Significant Impact on Use of Road & Site Emergency Plan | |
HL-1250, Forwards Post-Refueling Outage Startup Test Rept,Unit 1 Cycle 13, Per Tech Spec 6.9.1.1.Rept Presents Static & Dynamic Functional Core Tests Performed During Startup from Spring 1990 Maint/Refueling Outage | 27 August 1990 | Forwards Post-Refueling Outage Startup Test Rept,Unit 1 Cycle 13, Per Tech Spec 6.9.1.1.Rept Presents Static & Dynamic Functional Core Tests Performed During Startup from Spring 1990 Maint/Refueling Outage | |
HL-1245, Forwards Fitness for Duty Performance Data for First Six Month Reporting Period,Per 10CFR26.71d | 23 August 1990 | Forwards Fitness for Duty Performance Data for First Six Month Reporting Period,Per 10CFR26.71d | Fitness for Duty |
ELV-02028, Forwards Fitness for Duty Performance Data for First Six Month Period,Per 10CFR26.71(d) | 22 August 1990 | Forwards Fitness for Duty Performance Data for First Six Month Period,Per 10CFR26.71(d) | Fitness for Duty |
ELV-02022, Forwards Revised LER Re Apparent Personnel Error Leading to Unsecured Safeguards Info.Ler Withheld | 22 August 1990 | Forwards Revised LER Re Apparent Personnel Error Leading to Unsecured Safeguards Info.Ler Withheld | |
ELV-02027, Forwards Rev 0 to Core Operating Limits Rept, for Cycle 3, Per Amends 32 & 12 to Licenses NPF-68 & NPF-79,respectively | 20 August 1990 | Forwards Rev 0 to Core Operating Limits Rept, for Cycle 3, Per Amends 32 & 12 to Licenses NPF-68 & NPF-79,respectively | |
ML20056B301 | 20 August 1990 | Forwards Revised Ei Hatch Nuclear Plant,Units 1 & 2 Inservice Insp Program Second 10-Yr Interval, for Review & Approval.Program Will Be Implemented While Awaiting SER | |
ELV-01973, Submits Rept Re Results of Leakage Exams Conducted During Spring 1990 Refueling Outage,Per TMI Item III.D.1.1.None of Identified Leakage Considered Excessive.Work Orders Issued in Effort to Reduce Leakage to Level as Low Practical | 14 August 1990 | Submits Rept Re Results of Leakage Exams Conducted During Spring 1990 Refueling Outage,Per TMI Item III.D.1.1.None of Identified Leakage Considered Excessive.Work Orders Issued in Effort to Reduce Leakage to Level as Low Practical | |
ELV-01918, Responds to NRC 900612 Request for Comments & Suggestions on Draft risk-based Insp Guide.Util Conducting Individual Plant Exam & Will Withhold Comment on risk-based Insp Guide Until Completion | 3 August 1990 | Responds to NRC 900612 Request for Comments & Suggestions on Draft risk-based Insp Guide.Util Conducting Individual Plant Exam & Will Withhold Comment on risk-based Insp Guide Until Completion | |
ELV-01943, Responds to Violation & Proposed Imposition of Civil Penalty in Insp Repts 50-424/90-11 & 50-425/90-11.Corrective Action: Complete Audit of Contents of Safeguards Info Container Performed & Unassigned Safeguards Info Dispositioned | 27 July 1990 | Responds to Violation & Proposed Imposition of Civil Penalty in Insp Repts 50-424/90-11 & 50-425/90-11.Corrective Action: Complete Audit of Contents of Safeguards Info Container Performed & Unassigned Safeguards Info Dispositioned | |
ELV-01949, Forwards Info Re Status of Pen Branch Fault Investigation. Investigations Conducted So Far Still Indicate That Pen Branch Fault Not Capable | 26 July 1990 | Forwards Info Re Status of Pen Branch Fault Investigation. Investigations Conducted So Far Still Indicate That Pen Branch Fault Not Capable | |
HL-1215, Informs of Implementation of Amend 169 to Facility Tech Specs | 26 July 1990 | Informs of Implementation of Amend 169 to Facility Tech Specs | |
HL-1035, Forwards Nuclear Decommissioning Funding Plan for Plant,Per 10CFR50.75(b) & 33(k).Reasonable Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Each Unit on Current Expiration Date Exists | 25 July 1990 | Forwards Nuclear Decommissioning Funding Plan for Plant,Per 10CFR50.75(b) & 33(k).Reasonable Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Each Unit on Current Expiration Date Exists | Decommissioning Funding Plan |
ELV-01500, Forwards Nuclear Decommissioning Funding Plan for Plant.Info Provides Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Facilities | 25 July 1990 | Forwards Nuclear Decommissioning Funding Plan for Plant.Info Provides Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Facilities | Decommissioning Funding Plan |
ML20055H644 | 23 July 1990 | Submits Summary of Snubber Types & Sample Plans for Functional Testing to Be Performed During Sept 1990 Outage | |
ML20044B031 | 13 July 1990 | Forwards Vogtle Electric Generating Plant Unit 1 Reactor Containment Bldg 1990 Integrated Leakage Rate Test Final Rept. | |
ML20044B154 | 12 July 1990 | Responds to NRC 900612 Ltr Re Violations Noted in Insp Repts 50-424/90-08 & 50-425/90-08.Corrective Actions:Eop Step Deviation Documents to Be Upgraded,Adding More Justification & Temporary Change Issued to Correct EOP Deficiencies | |
ELV-01867, Responds to Violations Noted in Insp Repts 50-424/90-10 & 50-425/90-10.Corrective Action:Level Indication Error Corrected After Discrepancy Discovered | 12 July 1990 | Responds to Violations Noted in Insp Repts 50-424/90-10 & 50-425/90-10.Corrective Action:Level Indication Error Corrected After Discrepancy Discovered | |
ML20055F165 | 9 July 1990 | Forwards Comments Re NUREG-1410 | |
ML20044A885 | 6 July 1990 | Forwards Response to NRC Question on Steam Generator Level Instrumentation Setpoints,Per Revised Instrument Line Tap Locations.Tap Location Will Be Changed from Above Transition Cone to Below Transition Cone | |
ELV-01858, Advises That Full Compliance W/Violation Will Not Be Achieved Until Nov 1990,when Evaluation of VP-2693 Complete | 6 July 1990 | Advises That Full Compliance W/Violation Will Not Be Achieved Until Nov 1990,when Evaluation of VP-2693 Complete | |
HL-1158, Forwards Rev 0 to SIR-90-039, Flaw Evaluation & Weld Overlay Designs for Ei Hatch Unit 1 Spring 1990 Refueling Outage. Rept Details IGSCC Exam Results,Weld Overlay Design & Evaluation of Weld Shrinkage Stresses | 29 June 1990 | Forwards Rev 0 to SIR-90-039, Flaw Evaluation & Weld Overlay Designs for Ei Hatch Unit 1 Spring 1990 Refueling Outage. Rept Details IGSCC Exam Results,Weld Overlay Design & Evaluation of Weld Shrinkage Stresses | Weld Overlay |
ELV-01834, Forwards Response & Comments to Regulatory Effectiveness Review Rept.Encl Withheld (Ref 10CFR73.21) | 28 June 1990 | Forwards Response & Comments to Regulatory Effectiveness Review Rept.Encl Withheld (Ref 10CFR73.21) | |
ML20044A279 | 25 June 1990 | Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Table Indicating Status of Each Generic Safety Issue Encl | |
ML20043J017 | 22 June 1990 | Discusses Corrective Actions for Plant Site Area Emergency, Per 900514 Ltr.Jacket Water High Temp Switches Calibr for Diesel Generators,Using Revised Calibr Procedure | |
ML20043H306 | 15 June 1990 | Forwards Rev 3 to ISI-P-014, Inservice Insp Program, for Review & Approval,Per Tech Spec 4.0.5 Re Surveillance Requirements.Rev Includes Withdrawal of Relief Requests RR-45,47,48 & 54 | |
ML20043G207 | 12 June 1990 | Forwards Amend 18 to Physical Security & Contingency Plan. Amend Withheld (Ref 10CFR73.21) | |
ML20043E669 | 7 June 1990 | Forwards Rev 0 to Core Operating Limits Rept for Operating Cycle 13, Per Amend 168 to License DPR-57 | |
ML20043G102 | 6 June 1990 | Requests Temporary Waiver of Compliance from Requirements of Action Statement 27 of Tech Spec 3.3.2 for Period of 6 H When Two Operating Control Room Emergency Filtration Sys Trains Shut Down for Required Testing | |
ML20043E690 | 5 June 1990 | Forwards Rev 12 to Emergency Plan & Detailed Description & Justification of Changes.W/O Rev | |
ML20043G765 | 5 June 1990 | Forwards Rev 13 to Emergency Plan & Description & Justification of Changes | Minimum staff |
ML20043C862 | 31 May 1990 | Submits Certification That Operator Licensing Simulation Facility Located at Plant Meets NRC Requirements | Shutdown Margin Scram Discharge Volume Overtravel Fuel cladding |
ML20043B599 | 25 May 1990 | Forwards Scope & Objectives Re 1990 Annual Emergency Preparedness Exercise to Be Conducted on 900801 | |
ML20043B598 | 24 May 1990 | Responds to Violations Noted in Insp Rept 50-424/90-05 on 900217-0330.Corrective Actions:Locked Valve Procedure Revised to Eliminate Utilization of Hold Tag on Valves Required by Tech Specs to Be Secured in Position | |
ML20043B629 | 22 May 1990 | Forwards Rev 5 to ISI-P-008, Inservice Testing Program, Per Tech Specs 4.0.5 Re Surveillance Requirements & Generic Ltr 89-04 | |
ML20043B635 | 22 May 1990 | Forwards Rev 2 to ISI-P-016, Inservice Testing Program, Per Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs. | |
ML20042H060 | 14 May 1990 | Forwards Summary of Corrective Actions for 900320 Site Area Emergency Due to Loss of Offsite Power Concurrent W/Loss of Onsite Emergency Diesel Generator Capability.Truck Driver Disciplined for Lack of Attention | Time to boil |
ML20042G730 | 11 May 1990 | Forwards Revised Pages for May 1989,Jan & Mar 1990 Monthly Operating Repts for Vogtle Electric Generating Plant,Units 1 & 2.Revs Necessary Due to Errors Discovered in Ref Repts | |
ML20043A808 | 7 May 1990 | Forwards Response to NRC 900410 Ltr Re Violations Noted in Insp Repts 50-321/90-07 & 50-366/90-07.Encl Withheld (Ref 10CFR73.21) | |
ML20042F333 | 1 May 1990 | Provides Response to Generic Ltr 89-19, Safety Implication of Control Sys in LWR Nuclear Power Plants. Plant Procedures Address Possibility of Vessel Overfill Events & Training Alert Operators to Potential Overfills | |
ML20042E291 | 18 April 1990 | Forwards Amend 17 to Security Plan.Amend Withheld (Ref 10CFR2.790) |