Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211B986 | 13 August 1999 | Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval | Stroke time Squib Cold shutdown justification |
ML20211C263 | 13 August 1999 | Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval | Boric Acid Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Scram Discharge Volume Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld |
ML20210A303 | 30 June 1999 | Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan | Contraband |
ML20206M865 | 6 May 1999 | Rev 30,Vol I to Technical Requirements Manual | Fuel cladding |
ML20198D139 | 14 December 1998 | Rev 28 to Vol 1 of Technical Requirements Manual | |
ML20198B812 | 10 December 1998 | Rev 27 to Fermi 2 Technical Requirements Manual,Vol I | |
ML20154Q077 | 15 October 1998 | 6 to Fermi 2, Technical Requirements Manual, Vol I | Reactor Vessel Water Level |
ML20154M461 | 9 October 1998 | 5 to Vol 1 of Fermi 2 Technical Requirements Manual | Scram Discharge Volume |
ML20154H893 | 8 October 1998 | Rev 24 to Fermi 2 Technical Requirements Manual,Vol I | Safety Limit Minimum Critical Power Ratio Abnormal operational transient Fuel cladding |
ML20153F393 | 23 September 1998 | Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 | |
ML20237D631 | 18 August 1998 | Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 | |
ML20236P924 | 10 June 1998 | Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Process Control Program Earthquake |
ML20248H090 | 31 May 1998 | Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 | Shutdown Margin Reactor Vessel Water Level High Radiation Area Offsite Dose Calculation Manual Stroke time Incorporated by reference Scram Discharge Volume Process Control Program |
ML20247A651 | 8 December 1997 | Rev 11 to Odcm | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Power change |
ML20248J539 | 9 June 1997 | Rev 0 to MWC02, Fermi 2 Work Control Conduct Manual | Safe Shutdown High Radiation Area Temporary Modification Condition Adverse to Quality Foreign Material Exclusion Fire Watch Scaffolding Overexposure |
ML20217H667 | 22 December 1996 | Rev 0 to DE Fermi 2 Work Management Guidelines | Hardened vent Grace period |
ML20129J038 | 15 July 1996 | Rev 3,Change 11 to Inservice Testing Program (Plan) for Pumps & Valves for Fermi 2 Power Plant | Stroke time Hydrostatic Squib Power Operated Valves |
ML20100B883 | 24 January 1996 | Self-Assessment Plan SWS Operational Performance Insp (Swsopi) | Internal Flooding Biofouling |
ML20086L459 | 5 July 1995 | Change 9 to Rev 3 to IST Program (Plan) for Pumps & Valves for Fermi 2 Power Plant | Stroke time Squib Power Operated Valves Hardened vent |
ML20149H863 | 20 December 1994 | Rev 3,Change 8 to ISI-IST Program, IST Program (Plan) for Pumps & Valves for Fermi 2 Power Plant | |
ML20029E437 | 14 January 1994 | Recovery Plan. | |
ML20044E025 | 7 May 1993 | Rev 5 to Performance Evaluation Procedure 47.306.02, Votes Sys Operating Procedure. | Stroke time |
ML20098A293 | 31 December 1992 | 1992 Performance Mgt Program Work Plan | Condition Adverse to Quality Fire Protection Program |
ML20101H380 | 17 February 1992 | Rev 3,Change 1 to ISI-IST Program, IST Program Plan for Pumps & Valves for Fermi 2 Power Plant | |
ML20101H388 | 5 February 1992 | Rev 1,Change 1 to ISI-NDE Program, ISI-NDE Program Plan for Fermi 2 Power Plant | |
ML20098A291 | 31 December 1991 | Work Plan & Performance Appraisal for a & M-Grade Employees | |
ML20086G135 | 26 November 1991 | Draft ODCM 0.0 | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radiological Environmental Operating Report Power change |
ML20090A560 | 13 November 1991 | Rev 14 to Process Control Program | Anticipated operational occurrence Process Control Program |
ML20077C922 | 30 May 1991 | Rev 0 to TS Interpretation Manual, TS Interpretation 3.5.E.1 & 2-1 | |
ML20066C103 | 7 December 1990 | Change 0 of Rev 1 to Inservice Insp - NDE Program for Fermi 2 Power Plant | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Dissimilar Metal Weld |
ML20062H908 | 13 November 1990 | Rev 3 to Inservice Testing Program (Plan) for Pumps & Valves for Fermi 2 Power Plant | |
ML20065K289 | 30 October 1990 | Rev 5 to Regulatory Affairs Administrative Procedure RAP-EM1-04, Drills & Exercise | Health Physics Network |
ML20245H037 | 21 April 1989 | Revised Radiological Emergency Response Preparedness Procedures,Including Rev 5 to EP-402, Responsibilities of Recovery Organization & Rev 3 to RAP-EM1-04, Drills & Exercise | |
ML20244B061 | 18 January 1989 | Rev 2 to Odcm | Grab sample Offsite Dose Calculation Manual |
ML20238C192 | 31 August 1987 | Exercise Manual:Fermex 87 Aug 1987 | |
ML20238A354 | 18 August 1987 | Exercise Manual Fermex 87 | |
ML20204F285 | 9 March 1987 | Rev 23 to Pom 12.000.015 (Sr), Work Requests | Fire Barrier Temporary Modification Scaffolding |
ML20204F762 | 9 March 1987 | Rev 14 to Pom 12.000.012, Tagging & Protective Barrier Sys | |
ML20204F974 | 4 March 1987 | Rev 1 to 11.000.107, Requisitioning Process for Items & Svcs | Nondestructive Examination |
ML20204F660 | 4 February 1987 | Rev 0 to Pom 12.000.022, Performance Evaluation Program | |
ML20205T737 | 31 January 1987 | Rev 0 to Change 2 to Inservice Insp-Nondestructive Exam (ISI-NDE) Program (Plan) | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Scram Discharge Volume Liquid penetrant Dissimilar Metal Weld |
ML20204F551 | 12 January 1987 | Rev 5 to Pom 38.000.09, New Cable Terminations | Temporary Modification Scaffolding |
ML20204F599 | 6 January 1987 | Rev 4 to Pom 44.220.102, Jet Pump Instrument Lines Excess Flow Check Valves Functional Test | |
ML20204F729 | 2 January 1987 | Rev 3 to Pom 35.000.075, Mechanical Snubber Maint | Loctite |
ML20204F381 | 4 November 1986 | Rev 20 to Pom 12.000.007, Plant Operations Manual Procedures | Fire Protection Program |
ML20211C866 | 9 October 1986 | Rev 1 to Procedure 11.000.52, Deviation & Corrective Action Reporting | Condition Adverse to Quality |
ML20204F328 | 15 September 1986 | Rev 0 to MI-M402, Guidelines for Determining Component- Level Testing Requirements | Stroke time |
ML20204F490 | 4 September 1986 | Rev 6 to Pom 44.010.72, Reactor Protection Sys - Scram Discharge Vol High Water Level,Div Ii,Channel B1,Functional Test;C11-N601B | |
ML20204F402 | 31 July 1986 | Draft Rev 0 to, Procedures Generation Package | |
ML20204G019 | 26 July 1986 | Rev 5 to Pom 12.000.17, Preventive Maint Program. Related Info Encl | Scaffolding |