{{#Wiki_filter:s e 3 d FERMI 2 PROCEDURE - I & C SURVEILLANCE RPS - Scram Discharge Volume High Water Level, TITLE: Division II, Channel B1, Functional Test; C11-N601B FROCEDURE NUMBER: 44.010.72 REVISION: 6 SAFETY CLASSIFICATION: SR Name of preparer R. Fick Anna D. Wells /s/ Date 07/22/86 Administrative Format Reviewer Rawley P. Rogers /s/ Date 07/21/86 Technical Reviewer (s) Date Date W. E. Miller /s/ Date 08/26/86 Supervisor, OA R. J. Filipek /s/ Date 08/26/86 Resp Section Head or OSRO Member / Alternate Further Approval Required for SR or SP Procedures: R. S. Lenart /s/ Date 08/26/86 OSRO Chairman or Alternate R. S. Lenart /s/ Date 08/26/86 Plant Manager The following approved Procedure Change Requests are incorporated in this revision: M459 3 This revisionI% does l ldoes not constitute periodic review. Revision suunnary: (if used] THIS REVISION HAS A TITLE CHANGE Update references, and format: general revision. ARMS - INFORMATION SYSTEMS DTC TPPADM DSN 00m Wd (d. 74 Rev 6 Date 9.V.FC PIS PIS File 1703.02 Recipient k h 5 P I

POM 44.010.72 Revision 6 Page 2 TABLE OF CONTENTS Page 3 1.0 Purpose..................................... 3 2.0 Re f e r e n c e................................... 4 3.0 Required Equipment.......................... 4.0 Precautions and Limitations................. 4 q ) 5 5.0 Prerequisites............................... 5 6.0 Procedure................................... 6.1 Initial Conditions..................... 5 6.2 NTU Cll-N601B Functional Test.......... 6 l t, 9 7.0 Acceptance Criteria......................... ATTACHMENTS Functional Test Checklist (081186).................................... Attachment ! Independent Verification Sheet h (081186).................................... Attachment 2 l l}r:-{'g j.pp,. t,.e-t..a,.. l d,a j 100/R546/ 6.0 I 081886

POM 44.010.72 Revision 6 Page 3 1.0 PURPOSE The purpose of this functional test is to satisfy the once per 31 days testing requirements of Fermi 2 Technical Specifications Table 4.3.1.1-1.8b, by verifying that when the scram discharge volume level g is sensed to be high, a scram signal is sent to the Reactor Protection System (RPS) scram solenoid valves.

2.0 REFERENCES

2.1 Use References 2.1.1 Plant Operations Manual (POM) Procedure, 12.000.13, Radiation Work Permit 2.1.2 POM Procedure, 12.000.18, Surveillance Program 2.1.3 POM Procedure, 12.000.43, Verification of Correct Performance of Operating Activities 2.1.4 POM Procedure, 41.000.11, Calibration of Process Instrumentation 2.1.5 MI-IC-0410, CE Master Trip Unit Model GI 2.2 Source References 2.2.1 Fermi 2 Technical Specifications, Section 3/4.3.1, Reactor Protection System Instrumentation 2.2.2 POM Procedure, 41.000.03, Instrumentation Calibration Records 2.2.3 Equipment History Folder for Cll-N601B 2.2.4 Edison Drawings: 61721-2155-4 Rev. I Schematic Diagram Reactor Protection System - Relay Tabulation 61721-2155-7 Rev. K Schematic Diagram Reactor Protection System B - System Relays 61721-2155-9 Rev. H Schematic Diagram Reactor Protection System B - Scram i Trip Logic 61721-2155-10 Rev. I Schematic Diagram Reactor Protection System - Scram Solenoids

POM 44.010.72 Revision 6 Page 4 61721-2155-14 Rev. G Schematic Diagram Reactor Protection System - Annunciators Event Rec. Input 61721-2155-15 Rev. E Schematic Diagram Reactor Protection System - 4 Testability Modification 6I721-2155-19 Rev. J Schematic Diagram Reactor Protection System - Testability Modification 3.0 REQUIP.ED EQUIPMENT 3.1 " Readout Assembly" for the $10DU and 710DU Trip / Calibration (Cal) System. 3.2 Communications Equipment (Equip) as required for Step 5.5. (, NOTE: Record test Equip Number (f) and Cal due date, for 3.1, on Attachment 1. 4.0 PRECAUTIONS AND LIMITATIONS 4.1 This test may be performed while the plant is at power operations. Inputs are introduced to the RPS logic which will result in 1/2 SCRAM signals. If reliable communications are established and the test is performed carefully and in an orderly manner in accordance with this procedure, a SCRAM should not occur. 4.2 If any steps cannot be satisfactorily completed or if any instrument setpoints exceed Required Limits, iseediately notify the Nuclear Shift Supervisor (NSS) so that he can take any l(c necessary actions. 4.3 If a change of testing personnel takes place during the course of this test, the prerequisites should be reverified. 4.4 Appropriate safety precautions shall be taken when working on energized equipment. 4.5 Safety precautions unique to individual instruments, if any, will be described in the " REMARKS" secticn of the Equipment Specification Sheet. 4.6 Always read a step in its entirety before performing that step. 4.7 No other RPS testing should be performed while this test is being conducted which may affect the performance of this test.

POM 44.010.72 Revision 6 Page 5 5.0 PREREQUISITES 5.1 A Radiation Work Permit (RWP) has been obtained in accordance with Reference 2.1.1, if required. 5.2 Ensure the requirement of 4.3.1 through 4.3.9 of Reference 2.1.4 are satisfied. L 5.3 Obtain permission from the NSS to perform this surveillance in accordance with Reference 2.1.2, and inform him that thic test will give a " half scram" to the RPS Logic and that no other RPS testing that may affect the performance of this test should be performed. 5.4 Notify the Control Room Nuclear Supervising Operator (NS0) that lL the performance of this test will affect the following alarms / indications and that any other alarms / indications that occur during this test must be considered as a true indication of plant conditions. Annunciator 3D94, DISCKARGE WATER VOLUME HIGH LEVEL CHANNEL TRIP Balance of Plant (BOP) Sequence Recorder Point 0476 L Nuclear Steam Supply System (NSSS) Sequence Recorder Point 061 Annunciator 3D74, TRIP ACTUATOR Bl/B2 TRIPPED BOP Sequence Recorder Point 0413 NSSS Sequence Recorder Point 021 Annunciator 3D56, TESTABILITY LOGIC CH. A/B RPS/PWR FAILURE j. BOP Sequence Recorder Point 2006 Group Scram Indicators DS15 through DS4B, on Panel H11-P611 Group Scram Indicatora 3C28 through 3C31, on Panel H11-P603 5.5 Establish direct communications between Control Room Panel H11-P603, Relay Room Panel H11-P611 and Testability Panel H21-P086. 6.0 PROCEDURE 6.1 Initial Conditions 6.1.1 Ensure DISCHARGE VOLUME HIGH WATER LEVEL-BYPASS Switch 3A37, on Panel H11-P603, is in the NORMAL Position.

P0H 44.010.72 Revision 6 Page 6 6.1.2 Verify the following: b 1. Group SCRAM indicating lights DSIA, DS2A, DS3A, DS4A on Panel M11-P609, are ON. 2. Group SCRAM indicating lights DSIB, DS25, DS38, DS4B on Panel M11-P611, are ON. b 3. Annunciator 3D94, DISCHARGE WATER VOLUME HICH LEVEL CHANNEL TRIP, is clear. 4 Annunciator 3D56 TESTABILITY LOGIC CH.A/B RPS/ PWR PAILURE, is clear. L 5. Annunciator 3D74. TRIP ACTUATOR B1/B2 TRIPPED, is clear. 6.2 MTU C11-N601B Functional Test 6.2.1 At testability panel H21-P086, install the Readout Assembly in the Z2 Cal Unit. 6.2.2 Verify that the Calibration Select and command Switch is turned 0FF. b 6.2.3 Verify that the Calibration Sele:t and Command Switch and the TRANSIENT CURRENT amplitude adjustment are disengaged (knobs of switches pulled out). 6.2.4 Turn the Cal Unit POWER switch ON. Allow the Readout 19 Assembly to warm up for approximately ten (10) minutes. 6.2.5 Rotate the STABLE CURRENT amplitude adjustment fully counterclockwise (CCW). 6.2.6 Rotate the TRANSIENT CURRENT amplitude adjustment fully CCW. G 6.2.7 Using the Calibration Select and Command Switch, select the card file location of Master Trip Unit (NTU) C11-5601B (both the outer and center knobs should be at the same number). 6.2.8 Push in the center knob of the Calibration Select and Command Switch. 6.2.9 verify the following: 1. The status Light Emitting Diode (LED) on the MTV b changed from CREEN to RED and the CAL LED on the Cal unit, is ON.

POM 44.010.72 Revision 6 Page 7 2. Annunciator 3D56, TESTABILITY LOGIC CH.A/B RPS/ PWR FAILURE, is alarmed. 6.2.10 Depress the RESET pushbutton on the Readout Assembly and verify that its TRIP LED is OFF. 6.2.11 NOTE: Performance of this Step will cause a 1/2 ( scram. Slowly rotate the STABLE CURRENT amplitude adjustment clockwise until the TRIP LED on the Readout Assembly comes ON. 6.2.12 Record, on Table 1 of Attachment 1, the As Fcend Trip Current as read off the TRIP CURRENT Display on the Readout Assembly. 6.2.13 verify the As Found reading, recorded on Table 1 of, is within Required Limits. 6.2.14 Compare the As Found reading, recorded on Table 1 of, to the As Found Tolerance. If the reading exceeds the As Found Tolerance, recalibrate the MTU setpoint in accordance with Reference 2.1.4 and 2.1.5. Following recalibration, record the As Left reading on Table 1, ensuring it is within the As Left Tolerance. I 6.2.15 Verify the following: L 1. The TRIP LED on the MTU, is ON. 2. Annunciator 3D94, DISCHARGE WATER VOLUME HIGH LEVEL CHANNEL TRIP, is alarmed. 3. Annunciator 3D74. TRIP ACTUATORS Bl/B2 TRIPPED, is alarmed. 4. GROUP SCRAM indicating lights, DSIB, DS28, DS3B and DS4B, are OFF. 6.2.16 Depress RESET pushbutton on the Readout Assembly and verify its TRIP LED is OFF. 6.2.17 Slowly rotate the STABLE CURRENT amplitude adjustment CCW until the TRIP LED on the Readout Assembly comes ON. 6.2.18 Record, on Attachment 1, the RESET current as read off the TRIP CURRENT display on the Readout Assembly.

POM 44.010.72 j 0 Revision 6 Page 8 6.2.19 Verify the following: 1. The TRIP LED on the NTU, is OFF. 2. Annunciator 3D94, is clear. 6.2.20 Rotate the STABLE CURRENT amplitude adjustment fully CCW. 6.2.21 Pull the center knob of the Calibration Select and Command Switch OUT. 6.2.22 Verify the CROSS FAIL TRIP LED is OFF. If necessary, depress the reset switch. 6.2.23 verify the following: d 1. Annunciator 3D56, is clear. 2. The TRIP LED on the MTU, is OFF. 3. The CAL LED on the Cal Unit, is OFF. 4. The STATUS LED, is CREEN. L 6.2.24 Turn the Calibration Select and Command Switch 0FF. 6.2.25 Turn the REACTOR SCRAM RESET switch on panel Hll-P603 to Group 1 and 4, then Group 2 and 3, then NORMAL. 6.2.26 Verify the following: 1. CROUP SCRAM indicating lights DSIA through DS4A, on panel H11-P609, are ON. 2. CROUP SCRAM indicating lights DSIB through DS4B, on panel Hil-P611, are ON. 3. Annunciator 3D74, is clear. 6.2.27 Turn the Cal Unit POWER switch 0FF. 6.2.28 Remove the Readout Assembly. 6.2.29 Verify the following from the sequence of events recorder printout: NOTE: If the sequence of events recorder is not operating, enter the reason in the remarks section and enter N/A for steps not performed, t 1. BOP point 2006, alarmed and returned to Normal. 4 I

.... _..,v s s a I o POM 44.010.72 Revision 6 Page 9 s. P 2. BOP point 0476, alarmed and returned to Normal;' f ../ /, 3. ESP point 0413, alarmed and returned to Normal. fi m 7 i b 4. NSSS point 061, alarmed ar:d returuei $c Marmal. 5. MSS point 021, alarmed and returned to Wormal. 7.0 ACCEPTANCE CRITERIA-1 7.1 The functional. test of C11-N6013 is assapta'b'le if all required ( ~ steps were completed satisfactorily. l / FND Or 7t'XT. i I,, l i', /; i 4 t ~_; i e .e e, k g e ) ./ s / / i. j. .{a 1 g q d a p O d R -'t 4 .A Q s t 4 j i , - - -., ~ 7-3-, .,,-4,_,,----,-3.-..w5 yr., y..------ 4 .m--, r-J.

I \\ k' i POM 44.010.72 ', Page 1 of 3 081186 FUNCTIONAL TEST CHECKLIST e p Step Number Initials Data '3.1 Readout Assembly Test Equip i re.' Cal Due Date ^' L 'o i ,f.'. , 5.1 RWP obtained RWP f f fr. /, j,. 5.2 Requirements satisfied f 5.3 NSS permission 5.4 NSO notified l" 5.5 Communications established y ,./ 6.1 Initial Conditions l ,,(, 6.1.1 Bypass switch 3A37 in NORMAL r 4 I 6.1.2 verify 1. DSIA through DS4A are ON 2. DSIB through DS4B are ON 3. 3D94 clear 4. 3D56 clear i c s 5 '3. 3D74 clear

f I )>g 4

6.2 MTU Cll-N601B Functional Test l 6.2.1 Readout Assembly installed 6.2.2 Cal Switch OFF l' / j 6.2.3 Swicches disengaged /' 4 6.2.4 POWER ON 6.2.5 Fully CCW 6.2.6 Fully CCW 6.2.7 Cll-N601B selected 6.2.8 Activated Cal Unit 6.' 2. 9 verify 1. STATUS LED is RED, CAL LED is ON k j; 2. 3D56 alarmed j 6.2.10 LED OFF l 6.2.11

  • LED ON l

6.2.12 Data recorded 1 \\ _4 u, $ Itinimum requirements for Tech Spec operability. g.

-] 1" POM 44.010.72 4' ". Page 2 of 3 '? 081186 s FUNCTIONAL TEST CHECKLIST Step Number Initials Data 4 TABLE 1 0 ' f~ Cll-N601C - DESIRED TRIP VALUE 15.98 ma ( l As Found i As Found i As Left i As Lefti Required 1 l Tolerance i Reading l Tolerance.'l Reading l Limits l ma + l ma + l na 1 ma + l ma 1 I 7 i 15.94 i* 16.02l l 15.95l 16.01i I N/A i 19.83*l

  • Based on instrumentation range limitations, and is considerably more conservative than Tech Spec Allowable Value.

$6.2.13 Within Required Limits $6.2.14 Within Tolerance 6.2.15 - Feri f y 1. LED ON 2. 3D94 alarmed 3. 3D74 alarmed S 4 DSIB through DS4B are OFF 6.2.16 TRIP LED OFF 6.2.17 TRIP LED ON ~ (ma) 6.2.18 Reset Current 6.2.19 verify 1. LED Off, S 2. 3D94 clear 6.2.20 Fully CCW 6.2.21 Deactivated Cal Unit 6.2.22 LED OFF 6.2.23 verify 1. 3D56 cleared 2. LED OFF s 3. LED OFF. 4 LED GREEN 6.2.24 Switch OFF 6.2.25 REACTOR 1/2 SCRAM SET 6.2.26 Verify 1. .DSIA through DS4A are ON 2. DSIB through DS4B are ON l 3. 3D74 is clear ~ l 6.2.27 POWER OFF 6.2.28 Assembly removed 6.2.29 verify 1. BOP point 2006, alarmed; Normal 2. BOP point 0476, alarmed; Normal 3. BOP point 0413, alarmed; Normal s 2 4 NSSS point 061, alarmed; Normal i 5. NSSS point 021, alarmed; Mormal <j $ Minimum requirements for Tech Spec operability. l l l l'

4 POM 44.010.72 Page 3 of 3 081186 FUNCTIONAL TEST CHECKLIST Step Number Initials Data $7.1 All required steps were completed satisfactorily NOTE: This checklist and Independent Verification Sheet constitute the necessary documentation to ensure satisfactory completion of this functional test, and should be maintained together. REMARKS: i Time Completed: Date Completed: Printed Names Initials Signatures (of test personnel) NOTE: Following the completion of this test, ensure the requirements of 4.4.9 through 4.4.18 of Reference 2.1.4 and step 3.3 of Reference 2.1.3, where applicable, are satisfied. Inform the NSS that this surveillance is complete. t I ( l l~ F $ Minimum requirements for Tech Spec operability. t ~.... .. - - -. - -. -. -. - _ - _. _ _..,... ~

POM 44.010.72

  • , Page 1 of.1 081186 INDEPENDENT VERIFICATION SHEET

/ Start Time /Date NOTE: Independent Verfication should be performed as soon as possible after the Surveillance Test is completed. Independent Verification shall be completed prior to final acceptance of any surveillance test results. Initial /Date 1. The Calibration Select and Command Switch located on the Z2 Section of Testability Panel H21-P086, is turned OFF. / REMARKS Individual Performing Independent \\arfication Printed Name Initials Signature END I --- -- - ----- --}}