 Issue dateTitleTopic
ML20205C41725 March 1999Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings ReviewedSafe Shutdown
Fire Barrier
Emergency Lighting
Fire Protection Program
Backfit
ML20207K2055 March 1999Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed
ML20196D41724 November 1998Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in ProgressSafe Shutdown
Fire Barrier
Continuous fire watch
Fire Protection Program
Hourly Fire Watch
ML20151W3528 September 1998Special Rept 98-01:on 980819,maint Could Not Be Performed on FPS Due to Isolation Boundary Leakage.Caused by Inadequate Info Provided in Fire Impairment Plan.Isolated Portion of FPS Was Returned to SvcFire impairment
ML20148A9881 May 1997Special Rept 96-04-02:on 970429,groundwater Level at Well Mk GWA-2 Was in Alarm for 7 Days.Caused by Precipitation During Previous Week.Verified That No Other Groundwater Monitoring Instruments Were in AlarmHydrostatic
ML20137P0717 April 1997Special Rept 97-01:on 970226,Peak Accelerometer,1MIMT-5030, Removed Under WO 95092624 as Part of SG Replacement Project. Accelerometer Will Return to Svc Prior to Unit 1 Startup
ML20133L6059 January 1997Special Rept 96-04,Rev 1,groundwater Level at Well Mk GWA-2 Monitored by 2WZLS5060 Was in Alarm for 7 Days.Verified That No Other Groundwater Monitoring Instruments in AlarmHydrostatic
ML20134N02614 November 1996Special Rept:On 961006,groundwater Alarm Was Received & Entered in TS Action Item List for Tracking.Field Survey of Surrounding Areas Was Performed to Verify That No Water Was Percolating to Surface That Would Indicate Pipe LeakHydrostatic
ML20116K0339 August 1996Special Rept 96-03:on 960611,identified Broken Secondary Contact Blocks.Caused by Mishandling of Breakers or over- Torquing of Mounting Bolts.Breaker 2BYA Repaired,Tested & re-installed in Cabinet
ML20086G96012 July 1995Special Rept 95-002:on 950612,turbocharger Failed,As Detected by Excessive Noise & Vibration.Engine Subsequently Secured.Damaged Components Replaced & DG 2A Returned to Operable Status
ML20080G4423 February 1995Special Rept 95-01:on 950104,personnel on Unit 2 Operating in Solid Condition During Fill & Vent of Nc Sys
ML20078R76515 December 1994Special Rept 94-06:on 941012,fatigue Usage to SI Sys Piping by Manually Initiating Flow Through B Cold Leg from Fwst During Testing for Valve 1NI-71 Intentionally Increased. Startup of Facility Discontinued to Repair Valve
ML20078L65722 November 1994Special Rept SR-94-05:on 941024,Channel 3 of Vibration & Loose Parts Monitoring Sys Declared Inoperable Due to Noise.Channel 3 of V&Lpm Will Be Repaired Under WR 94043758 or Replaced by Nsm MG-12096 During Outage 1EOC10High Radiation Area
ML20073C24514 September 1994Special Rept 94-004:on 940821,valid Failure of DG 1A Occurred Due to Failure of Series Boost exciter-regulator (Voltage Regulator).Isolation Transformer T54 & Current Transformers CT1,CT2 & CT3 Will Be Inspected
ML20065K25015 April 1994Special Rept 94-03:on 940210,during Testing PORV Observed to Hang Open in Absence of air-assisted Closure.Caused by Incomplete Testing of Porvs.Compensatory Measures Reanalyzed & Reestablished Addressing Fire & Security Issues
ML20064K03115 March 1994Special Rept 94-01:on 940215,DG 2A Tripped W/Low Lube Oil Pressure Indication During Routine Surveillance Test.Caused by Pressure Too Low in Bldg Up in Sensing Lines.Test Satisfactorily Repeated
ML20058M42827 September 1993Special Rept 93-09:on 930920,notifies of Alarm Condition Showing Alert on Ground Water Level Outside 1A DG Room.Work Order 93063348 Initiated by Wc Personnel to Have Iae Personnel Check Operation & Calibr
ML20056F85623 August 1993Special Rept 93-06:on 930405,discovered Debris on Unit 1 Lower Core Plate.Four Other Unidentified Objects Noted During Video Insp of Lower Core Plate
ML20126B50515 December 1992Inplant Review Rept 92-20,special Rept Re Postulated Scenario That Could Introduce Air Into AFW Suction Piping. Caused by Functional Design Deficiency.Setpoints of Affected Pressure Switches IncreasedProbabilistic Risk Assessment
Earthquake
Overexposure
ML20106D7409 October 1992RO 92-19:on 920804,discovered That Drive Shaft on Pump 1MNVPU0046 Was Rotating in Opposite Direction than Specified on Pump Casing.Caused by Mgt Deficiency.Motor Leads of Subj Pump Reconfigured to Provide Correct Pump Shaft RotationTime of Discovery
Past operability
ML20127E0199 September 1992Special Rept:On 920421,unusual Event Declared Because Unit 1 Train B of Ssps Inoperable Due to Defective Circuit Card within Ssps.Failed Train B Ssps Circuit Board Replaced & Appropriate Procedures to Be EvaluatedOverexposure
ML20101T94413 July 1992Special Rept for Inplant Review 92-10:on 920610 No Mention Made on Work List of Vent Path Through SG 1B for Incoming SG Crews.Caused by Deficient Communication.Turnover Sheet Established to Document Existing Vent Path Status
ML20101P5583 July 1992In-Plant Review Rept 92-09:on 920619,setpoint Problems Noted W/Ts & Selected Licensee Commitment Values for Listed Field Data.Caused by Discrepancies W/Groundwater Level Monitoring Portion of Wz Sys.Ts Monitor Logged in Unit 2 LogbookOverexposure
ML20086Q11020 December 1991Voluntary Special Rept 91-23:on 911008,reactor Vessel Lower Internals Contacted Reactor Vessel During Removal.Caused by Inappropriate Operator Action & Mgt Deficiency.Recovery Plan Developed Re Insp of Lower Internals & Refueling CanalSubstantial potential for overexposure
Overexposure
ML20086H9434 December 1991Special Rept 91-24:on 911104-29,concerns Noted Re Possible Leakage of Containment Spray Sys Check Valves Into Annulus, Causing Offsite Radioactive Dose.Caused by Design Deficiency.Check Valve Installed Downstream of Piping
ML20091C0851 August 1991Special Rept PIR 1-M91-0113:on 910616,diesel Engine Cooling Water Leak Discovered on Diesel Generator 1A at Discharge Flange on Intercooler End Bell Cover.Caused by Poor Casting Quality.New Covers Will Be Installed
ML20081F7374 June 1991Rev 1 to Special Rept 91-11 Dtd 910411:on 910215,turbine Driven Auxiliary Feedwater Pumps Automatically Started. Caused by Deficient Communication & Lack of Attention to Detail.Pump Speed Reduced & Discharge Valves ClosedOverexposure
ML20062E79914 November 1990Special Rept:On 901011,turbine Driven Auxiliary Feedwater Pump Declared Inoperable W/O Having Made Security Notification.Caused by Inappropriate Action
ML20055G21612 July 1990Ro:On 900602,discovered That Channel 7 of Vibration & Loose Parts Monitor Sys Had Low Noise Level.Probably Caused by Bad or Damaged Sensor Cable.Definite Cause of Failure Undetermined.Sys Scheduled to Be Replaced
ML20246F7083 July 1989Special Rept:On 890601,diesel Generator 1A Shut Down Due to Lack of Oil Flow.Due to Test Being Performed,Normal Stop Would Not Shutdown Engine.New Oil Added & Pumps Primed. Turbocharger Mods Under Investigation
ML20247N88430 May 1989Special Rept:On 890418,vibration & Loose Parts Monitor Failed.Caused by Damaged Cables to Sensors on Each Affected Channel.Vibration & Loose Parts Monitor Will Be Repaired During Next Refueling Outage After New Replacement Received
ML20244C6736 April 1989Special Rept:On 890225,operations Personnel Discovered That Channel 8 of Vibration & Loose Parts Monitoring Sys Had Low Noise Level.Investigation Scheduled to Be Completed During Unit 1 Tube Leak Outage
ML20196E8245 December 1988Special Rept:On 881205,diesel Generator 1B Experienced Invalid Test Failure.Caused by Improper Adjustment of Voltage Regulator Due to Personnel Error.Operations Mgt Will Cover Incident W/Representative from Each Shift
ML20196B52129 November 1988Special Rept:On 881030,Diesel Generator 1B Experienced Invalid Test Failure During Start Attempt 602.Applicable Procedures for Diesel Generator Testing Reviewed & Revised If Necessary
ML20195H49016 November 1988Special Rept:On 881017,diesel Generator 1A Started for Operability Test & Subsequently Tripped.Caused by Loose Wire on Jacket Pump Discharge Pressure Switch.Wire Reterminated & Pressure Switch Calibr
ML20205G34024 October 1988Special Rept:On 880916,Tech Spec 3.7.14.a Violated.Caused by Standby Shutdown Facility Being Inoperable for More than 7 Days Due to Transfer Canal Isolating & Draining Utilizing Weir Gate.Special Order 88-13 Issued
ML20151R09727 July 1988Special Rept:On 880627,diesel Generator 1A Failed to Start within 11 S.Caused by Missing Drain Valve on Starting Air Filter Housing on Right Bank Side of Diesel Engine.Work Request Written to Replace Filter Housing
ML20151F49122 July 1988Special Rept:On 880519,diesel Generator 1A Started for Operability Test & After Operating for 10 Minutes, Automatically Stopped & Declared Inoperable.Caused by Failure to Maintain Lubricating Level in Valve 1LD-7
ML20195J36022 June 1988Special Rept:On 880323,Train a Safety Injection & Main Steam Sys Isolation Signals Received from Unknown Fault Inside Train a Solid State Protection Sys Logic Cabinet.Cause of Fault Could Not Be Isolated.Cabinet Returned to Svc
ML20195J61620 June 1988Advises That Special Rept Re Diesel Generator 1A Incident on 880519 Will Be Submitted by 880708 Instead of 880620 Due to Unresolved Concerns
ML20195G21717 June 1988Special Rept:On 880518,diesel Generator 1B Experienced Valid Failure.Caused by Fuel & Vol of Trapped Air Shook Debris Loose from Engine Mounted Duplex Fuel Filter.Filter Cartridges Replaced.Preventative Maint Procedure Revised
ML20151C7694 April 1988Ro:Change of Commitment Submitted Re Diesel Generator Turbocharger Rotor Assembly Replacement.Turbocharger Inlet Casings Replaced on All Four Engines W/New Design.Dye Penetrant Testing Will Continue to Be Performed
ML20147F4313 March 1988Special Rept:On 880123,Channels 3,4 & 8 of Vibration & Loose Parts Monitor Had Unusual Noise Level.Cause Not Determined Due to Number of Possible Failures & Location of Components within Plants.Monitor Will Be Repaired During 1988 Outage
ML20237D13414 December 1987Special Rept:On 871108,safe Shutdown Facility RCS Wide Range Transmitter Out of Calibr.Instrument Could Not Be Calibrated.Requisition Initiated for Replacement TransmitterSafe Shutdown
ML20236Q16213 November 1987Special Rept:On 870816,malfunction of Main Turbine Generator Controls Caused Rapidly Decreasing Main Steam Line Pressure Triggering Safety Injection/Reactor Trip.Safety Injection & Unusual Event Terminated & Repairs Completed on 870821
ML20214S5428 June 1987Special Rept:On 870503,pressurizer PORV 2NC-34A Automatically Opened Due to Pressure Transient in Rcs.Cause Not Determined.Charging & Letdown Flow Adjusted & Procedures Re Allowable Setpoint Range RevisedOverexposure
ML20214G73013 May 1987Special Rept:On 870407 & 08,complete 18-month Insp Required for Standby Shutdown Diesel Generator Determined Not to Have Been Performed on Time.Caused by Personnel Error.Work Request Will Be Issued Prior to 18-month Due DatesGrace period
Overexposure
ML20213H0598 May 1987Ro:On 870409,personnel Discovered Monthly Channel Checks on Reactor Vessel Level Instrumentation Sys Wide Range Instrumentation Not Performed,Per Tech Specs.Ler Will Be Submitted by 870518
ML20214J15921 November 1986Ro:On 861029,valves in ECCS Declared Inoperable.Caused by Rotork Motor Switch Settings.Ler for Incident Will Be Delayed Until 861219 to Allow Testing & Evaluation of Units
ML20203J65528 July 1986Ro:On 860626 & 27,small Cylindrical Objects Observed on Upper Core Baffle & in Vicinity of Upender,Respectively.On 860629,objects Confirmed to Be Spent Fuel Pellets.Pellets Vacuumed from Core & Upender