PNO-III-98-030, on 980517,armed Security Guard on Patrol in Owner Controlled Area Reported to Security Person Lying Near Road.Guard Subsequently Reported Being Shot.No Intruder Found.Guard Admitted Shooting Himself in Foot18 May 1998PNO-III-98-030:on 980517,armed Security Guard on Patrol in Owner Controlled Area Reported to Security Person Lying Near Road.Guard Subsequently Reported Being Shot.No Intruder Found.Guard Admitted Shooting Himself in Foot
PNO-III-98-006, on 980115,licensee Announced Permanent Shut Down of Station.Util Plans to Maintain Plant in Safstor Decommissioning Mode Until Approx 201415 January 1998PNO-III-98-006:on 980115,licensee Announced Permanent Shut Down of Station.Util Plans to Maintain Plant in Safstor Decommissioning Mode Until Approx 2014
PNO-III-97-071, on 970903,Comm Ed Announced Series of Mgt Changes & Restructuring of Nuclear Div Organization.New Site Vice Presidents at Braidwood & Quad Cities Former Plant Managers.State of Il Will Be Notified of Mgt Changes3 September 1997PNO-III-97-071:on 970903,Comm Ed Announced Series of Mgt Changes & Restructuring of Nuclear Div Organization.New Site Vice Presidents at Braidwood & Quad Cities Former Plant Managers.State of Il Will Be Notified of Mgt Changes
PNO-III-97-035, on 970417,licensee Informed Zion Station of Results of Operations Assessment of Licensed & non-licensed Operating Staff.Licensee Assessed 187 Employees,Both in Mgt & Bargaining Unit Positions.States of Il & Wi Informed18 April 1997PNO-III-97-035:on 970417,licensee Informed Zion Station of Results of Operations Assessment of Licensed & non-licensed Operating Staff.Licensee Assessed 187 Employees,Both in Mgt & Bargaining Unit Positions.States of Il & Wi Informed
PNO-III-97-034, on 970417,decision Not to Replace SGs Made. as Result of Decision,Comm Ed Stated Zion Station Would Be Shut Down Before Expiration of Operating Licenses in 2013. Util Most Probably Support Operation to 200518 April 1997PNO-III-97-034:on 970417,decision Not to Replace SGs Made. as Result of Decision,Comm Ed Stated Zion Station Would Be Shut Down Before Expiration of Operating Licenses in 2013. Util Most Probably Support Operation to 2005
PNO-III-97-024, on 970311,Unit 1 Sys Auxiliary Transformer Tripped as Result of Actuation of Sudden Pressure Relay, Indicating Possible Fault in Transformer.Nrc Providing round-the-clock Insp Coverage at Zion14 March 1997PNO-III-97-024:on 970311,Unit 1 Sys Auxiliary Transformer Tripped as Result of Actuation of Sudden Pressure Relay, Indicating Possible Fault in Transformer.Nrc Providing round-the-clock Insp Coverage at Zion
PNO-III-97-010B, on 970221,plant Containment Spray Pump Found to Be Inoperable During Routine Testing.On 970307,AIT Held Exit Meeting W/Licensee.Ait Concluded That Significant Deficiencies in Oversight of Control Room Found7 March 1997PNO-III-97-010B:on 970221,plant Containment Spray Pump Found to Be Inoperable During Routine Testing.On 970307,AIT Held Exit Meeting W/Licensee.Ait Concluded That Significant Deficiencies in Oversight of Control Room Found
PNO-III-97-010A, on 970221,AIT Dispatched to Zion Station to Review Improper Control Rod Movement Occurred,During Reactor Shutdown.Licensee Also Formed Event Investigation Team Led by J Brons,Comm Ed Vice-President Nuclear Support26 February 1997PNO-III-97-010A:on 970221,AIT Dispatched to Zion Station to Review Improper Control Rod Movement Occurred,During Reactor Shutdown.Licensee Also Formed Event Investigation Team Led by J Brons,Comm Ed Vice-President Nuclear Support
PNO-III-97-010, on 970219,diesel-driven CS Pump Found to Be Inoperable During Routine Surveillance Test.Reactor Operator Realized,Rods Were Moved Further than Expected.Actual Safety Significance of Error Minimal24 February 1997PNO-III-97-010:on 970219,diesel-driven CS Pump Found to Be Inoperable During Routine Surveillance Test.Reactor Operator Realized,Rods Were Moved Further than Expected.Actual Safety Significance of Error Minimal
PNO-III-97-003, on 970117,outage Extended to Address Technical & Plant Condition Issues.Actions to Be Completed During Outage Extension Include Submitted Info17 January 1997PNO-III-97-003:on 970117,outage Extended to Address Technical & Plant Condition Issues.Actions to Be Completed During Outage Extension Include Submitted Info
PNO-III-92-048, on 920917,licensee Shut Down Unit 1 Because 1A turbine-driven AF Pump Declared Inoperable & Operability of One of Two 1A SG Injection Lines Considered Questionable. Equipment Debris Found in AF System.Repairs Require 1 Week18 September 1992PNO-III-92-048:on 920917,licensee Shut Down Unit 1 Because 1A turbine-driven AF Pump Declared Inoperable & Operability of One of Two 1A SG Injection Lines Considered Questionable. Equipment Debris Found in AF System.Repairs Require 1 Week
PNO-III-90-061, on 900922,one of Two Main Transformers Exploded,Causing Reactor Trip from 40% Power After Turbine Trip Occurred.Cause Under Investigation.Replacement Transformer Will Be Installed in 3 Wks24 September 1990PNO-III-90-061:on 900922,one of Two Main Transformers Exploded,Causing Reactor Trip from 40% Power After Turbine Trip Occurred.Cause Under Investigation.Replacement Transformer Will Be Installed in 3 Wks
PNO-III-90-053, on 900724,55-year Old Employee of fire-watch Contractor Died of Apparent Heart Attack,While on Duty in Turbine Building24 July 1990PNO-III-90-053:on 900724,55-year Old Employee of fire-watch Contractor Died of Apparent Heart Attack,While on Duty in Turbine BuildingFatality
ML20212A2596 March 1990PNO-III-90-14A:on 900306,high Bearing Temperature Resulted in Common EDG for Two Units to Be Declared Inoperable on 900305
PNO-III-89-055, on 890817,security Guard Arrested for Robbery.Guard Site Access Badge Terminated on 890817 After Plant Police Notified Licensee of Planned Interview of Suspect Re Robberies18 August 1989PNO-III-89-055:on 890817,security Guard Arrested for Robbery.Guard Site Access Badge Terminated on 890817 After Plant Police Notified Licensee of Planned Interview of Suspect Re Robberies
PNO-III-89-040, on 890624,power Lost to All Control Room Annunciators for Reactor & safety-related Sys.Caused by Troubleshooting Ground on Electrical Bus for balance-of-plant Annunciators & Blow Fuses26 June 1989PNO-III-89-040:on 890624,power Lost to All Control Room Annunciators for Reactor & safety-related Sys.Caused by Troubleshooting Ground on Electrical Bus for balance-of-plant Annunciators & Blow Fuses
PNO-III-89-033A, on 890508 & 09,gaseous Release Occurred from Coolant Vol Control Sys Mixed Bed Demineralizer 1A Through Floor Drains to Auxiliary Bldg Vent Stack.Region III Monitoring Licensee Investigation11 May 1989PNO-III-89-033A:on 890508 & 09,gaseous Release Occurred from Coolant Vol Control Sys Mixed Bed Demineralizer 1A Through Floor Drains to Auxiliary Bldg Vent Stack.Region III Monitoring Licensee Investigation
PNO-III-89-033, on 890308,high Radiation Alarm Received When Vent & Drain Valves of Coolant Vol Control Sys 1A Mixed Bed Demineralizer Opened.Caused by Use of Erroneous Stack Flow Rate.New Calculations Determined Release Rate within Limits8 March 1989PNO-III-89-033:on 890308,high Radiation Alarm Received When Vent & Drain Valves of Coolant Vol Control Sys 1A Mixed Bed Demineralizer Opened.Caused by Use of Erroneous Stack Flow Rate.New Calculations Determined Release Rate within Limits
PNO-III-88-087, on 881025,licensee Determined That Neither of Two motor-driven Auxiliary Feedwater Pumps Would Automatically Start W/Loss of Offsite Power & lo-lo Steam Generator Level.Pumps Declared Inoperable26 October 1988PNO-III-88-087:on 881025,licensee Determined That Neither of Two motor-driven Auxiliary Feedwater Pumps Would Automatically Start W/Loss of Offsite Power & lo-lo Steam Generator Level.Pumps Declared Inoperable
PNO-III-88-067, on 880722,controlled Shutdown Initiated to Repair Steam Leak.Unit Down for More than 48 H for Steam Leak Repair & Portions of Piping Which Exhibited Wall Thickness of Less than Three Inches.State of Il Notified25 July 1988PNO-III-88-067:on 880722,controlled Shutdown Initiated to Repair Steam Leak.Unit Down for More than 48 H for Steam Leak Repair & Portions of Piping Which Exhibited Wall Thickness of Less than Three Inches.State of Il Notified
PNO-III-87-129, on 871002,facility Shut Down to Repair Packing Leaks on Both Pressurizer Spray Valves.Cause of Packing Leaks Not Stated.Valve Repairs Now Completed & Repair of Position Indicator on One Valve Underway5 October 1987PNO-III-87-129:on 871002,facility Shut Down to Repair Packing Leaks on Both Pressurizer Spray Valves.Cause of Packing Leaks Not Stated.Valve Repairs Now Completed & Repair of Position Indicator on One Valve UnderwayPacking leak
PNO-III-87-081, on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants11 June 1987PNO-III-87-081:on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other PlantsEarthquake
PNO-III-87-073, on 870521,personnel Discovered Water Leaking Through Doors on Diesel Fuel Oil Storage Tank Rooms Into Turbine Bldg.Caused by Removal of Wrong Check Valve Bonnet. Water Pumped to Waste Water Treatment Sys for Processing22 May 1987PNO-III-87-073:on 870521,personnel Discovered Water Leaking Through Doors on Diesel Fuel Oil Storage Tank Rooms Into Turbine Bldg.Caused by Removal of Wrong Check Valve Bonnet. Water Pumped to Waste Water Treatment Sys for Processing
PNO-III-87-061, on 870425,generator Shutdown to Reduce Frame Vibrations & Repair Hydrogen Leak Into Stator Water Cooling Sys.Inspectors Monitoring Licensee Activities.Reactor Will Be Kept Critical to Support Generator Balance Runs28 April 1987PNO-III-87-061:on 870425,generator Shutdown to Reduce Frame Vibrations & Repair Hydrogen Leak Into Stator Water Cooling Sys.Inspectors Monitoring Licensee Activities.Reactor Will Be Kept Critical to Support Generator Balance Runs
PNO-III-87-043, on 870327,fire Discovered in Turbine Bldg in Cardboard Box Containing Noncombustible Piping Insulation. Fire Extinguished by Fire Brigade.Fire Probably Caused by Discarded Cigarette27 March 1987PNO-III-87-043:on 870327,fire Discovered in Turbine Bldg in Cardboard Box Containing Noncombustible Piping Insulation. Fire Extinguished by Fire Brigade.Fire Probably Caused by Discarded Cigarette
PNO-III-87-018, on 870130,telegram Addressed to HR Denton Received Carrying Final Warning That Zion Nuclear Plant Shall Be Closed, Unless Info Made Available.Responsible Individual Located by FBI & Agreed to Psychiatric Treatment2 February 1987PNO-III-87-018:on 870130,telegram Addressed to HR Denton Received Carrying Final Warning That Zion Nuclear Plant Shall Be Closed, Unless Info Made Available.Responsible Individual Located by FBI & Agreed to Psychiatric Treatment
PNO-III-86-121, on 861110,preliminary Evaluation by Licensee & Region III Determined Diesel Generator 1B Failure Caused by Improperly Torqued Bolt in Articulated Connecting Rod. Licensee Plans to Examine Remaining Generators10 November 1986PNO-III-86-121:on 861110,preliminary Evaluation by Licensee & Region III Determined Diesel Generator 1B Failure Caused by Improperly Torqued Bolt in Articulated Connecting Rod. Licensee Plans to Examine Remaining Generators
PNO-III-86-110, documents State of Il Concerns Re Viability of Emergency Evacuation Routes for Plant Due to Recent Flooding in Area.Plants Not Affected as Unit 1 Shut Down for Refueling & Unit 2 Operating at 99% Power30 September 1986PNO-III-86-110:documents State of Il Concerns Re Viability of Emergency Evacuation Routes for Plant Due to Recent Flooding in Area.Plants Not Affected as Unit 1 Shut Down for Refueling & Unit 2 Operating at 99% Power
PNO-III-86-098, on 860911,small Unplanned Release of Radioactive Noble Gas Detected in Auxiliary Bldg & Control Room.Caused by Malfunctioning Level Indicator on Spent Resin Storage Tank.Gas Cleared by Ventilation Sys15 September 1986PNO-III-86-098:on 860911,small Unplanned Release of Radioactive Noble Gas Detected in Auxiliary Bldg & Control Room.Caused by Malfunctioning Level Indicator on Spent Resin Storage Tank.Gas Cleared by Ventilation Sys
PNO-III-86-064, on 860705,svc Water Pump 1B Failed.Apparently Due to Failure of Pump Shaft,Lower Bearing or Lower Impeller.Unit Placed in Hot Shutdown.Approx 7 Days Needed to Repair Pump7 July 1986PNO-III-86-064:on 860705,svc Water Pump 1B Failed.Apparently Due to Failure of Pump Shaft,Lower Bearing or Lower Impeller.Unit Placed in Hot Shutdown.Approx 7 Days Needed to Repair Pump
PNO-III-86-062, on 860627,while Operating at 68% Power, Lightening Strike Caused Unit to Automatically Trip.Shutdown Was Due to Failure of Some Primary Sys Instruments,Causing Reactor Protection Sys to Trip Unit.State of Il Notified30 June 1986PNO-III-86-062:on 860627,while Operating at 68% Power, Lightening Strike Caused Unit to Automatically Trip.Shutdown Was Due to Failure of Some Primary Sys Instruments,Causing Reactor Protection Sys to Trip Unit.State of Il Notified
PNO-III-86-046, on 860516,RCS Found Leaking Approximately 20 Gpm.Caused by Failed Packing in Pressurizer Spray Valve. Valve Packing & leak-related Damage to Drain Line Sight Glass & Rupture Disk Will Be Repaired16 May 1986PNO-III-86-046:on 860516,RCS Found Leaking Approximately 20 Gpm.Caused by Failed Packing in Pressurizer Spray Valve. Valve Packing & leak-related Damage to Drain Line Sight Glass & Rupture Disk Will Be Repaired
PNO-I-86-038, on 860515,current Contract W/Local Unions Will Expire & Strike of Operators,Maint Personnel & Clerical Staff May Occur.Unions Recommend Rejection of Util Proposal. Plant Shut Down Since 860412 Containment Isolation Occurred15 May 1986PNO-I-86-038:on 860515,current Contract W/Local Unions Will Expire & Strike of Operators,Maint Personnel & Clerical Staff May Occur.Unions Recommend Rejection of Util Proposal. Plant Shut Down Since 860412 Containment Isolation Occurred
PNO-III-86-041, on 860509,unit Shut Down to Repair Failed Main Steam Line Check Valve on Loop B.Normal Differential Pressure Exceeded by 37 Psig.Unit Expected to Be Shut Down for 48 H9 May 1986PNO-III-86-041:on 860509,unit Shut Down to Repair Failed Main Steam Line Check Valve on Loop B.Normal Differential Pressure Exceeded by 37 Psig.Unit Expected to Be Shut Down for 48 H
PNO-III-86-020, on 860303,Westinghouse DB-50 Reactor Trip Breaker Tripped at 190 Milliseconds During Testing. Subsequent Response Tests Satisfactory.Vendor Assisting in Troubleshooting10 March 1986PNO-III-86-020:on 860303,Westinghouse DB-50 Reactor Trip Breaker Tripped at 190 Milliseconds During Testing. Subsequent Response Tests Satisfactory.Vendor Assisting in Troubleshooting
PNO-III-86-013, on 860219,both Unit 2 Diesel Generators & Units 1 & 2 Shared Diesel Declared Inoperable.Cause Undetermined.Partially Closed Fuel Line Valve on Diesel Generator 2A Discovered.Generators Retested20 February 1986PNO-III-86-013:on 860219,both Unit 2 Diesel Generators & Units 1 & 2 Shared Diesel Declared Inoperable.Cause Undetermined.Partially Closed Fuel Line Valve on Diesel Generator 2A Discovered.Generators Retested
PNO-III-85-102, on 851214,during Outage,Both Trains of RHR Sys Lost When Water in Reactor Vessel Drained Below Level of Suction Line.Caused by Erroneous Control Room Indication of RCS Configuration Used for Outage16 December 1985PNO-III-85-102:on 851214,during Outage,Both Trains of RHR Sys Lost When Water in Reactor Vessel Drained Below Level of Suction Line.Caused by Erroneous Control Room Indication of RCS Configuration Used for OutageReactor Vessel Water Level
PNO-III-85-087, on 851007,concrete Finisher Killed After Falling 45 Ft While Working on Interim Radwaste Storage Facility.No Contamination Involved8 October 1985PNO-III-85-087:on 851007,concrete Finisher Killed After Falling 45 Ft While Working on Interim Radwaste Storage Facility.No Contamination InvolvedFatality
PNO-III-83-065, on 830727,licensee Determined That All 3 EDGs Associated W/Unit 2 Were Technically Inoperable Since Required Surveillance Testing Had Not Been Conducted within Proper Time Frame.State of Il Notified28 July 1983PNO-III-83-065:on 830727,licensee Determined That All 3 EDGs Associated W/Unit 2 Were Technically Inoperable Since Required Surveillance Testing Had Not Been Conducted within Proper Time Frame.State of Il Notified
PNO-III-82-062, on 820629,three-nonlicensed Stationmen at Quad-Cities Station Identified by Alleger as Users of Marijuana.On Same Day,During Search of Incoming Truck, Security Personnel Discovered Marijuana Cigarette30 June 1982PNO-III-82-062:on 820629,three-nonlicensed Stationmen at Quad-Cities Station Identified by Alleger as Users of Marijuana.On Same Day,During Search of Incoming Truck, Security Personnel Discovered Marijuana Cigarette
PNO-III-80-166, on 800903,unit Tripped from 93% Power Due to Low Steam Generator Level,Caused by Feedwater Pump Trip. Water Hammer Occurred While Steam Generator Level Was Below Feed Ring Causing Safety Injection Actuation3 September 1980PNO-III-80-166:on 800903,unit Tripped from 93% Power Due to Low Steam Generator Level,Caused by Feedwater Pump Trip. Water Hammer Occurred While Steam Generator Level Was Below Feed Ring Causing Safety Injection Actuation
PNO-III-80-063A, 800402,ltr from Mayor of Waukegan,Il, Demanded Actions as Result of 800331 Unplanned Gaseous Release.Region 3 Is Continuing Investigation & Evaluation3 April 1980PNO-III-80-063A:800402,ltr from Mayor of Waukegan,Il, Demanded Actions as Result of 800331 Unplanned Gaseous Release.Region 3 Is Continuing Investigation & Evaluation
PNO-III-80-063, on 800331,unplanned Gaseous Radiation Release Occurred Because of Operator Error in Operating Valves. Preliminary Analysis Indicates Release Rates Did Not Exceed Tech Spec Limits1 April 1980PNO-III-80-063:on 800331,unplanned Gaseous Radiation Release Occurred Because of Operator Error in Operating Valves. Preliminary Analysis Indicates Release Rates Did Not Exceed Tech Spec Limits
ML20126B54525 January 1980PNS-III-80-002:800125,switchboard Operator Received Call Suggesting Facility Should Be Blown Up.Caller Allegedly Has Parts for Bomb.Resident Inspector Received Call Same Day.Increased Security Employed.No Disruption of Operation
ML20249A6726 October 1978PNS-78-049:on 781007,demonstration Will Take Place at Site. Licensee Will Have Its Full Complement of Guards on Duty Augmented by Zion Police Dept During Demonstration
ML20216K15318 July 1978PNO-78-135:on 780713,employee Alleged That Manual Operation of Sys Causing Unnecessary Radiation to Emplyees
ML20249A7393 April 1978PNS-78-015:on 780331,US Marshall Served Subpoena to Testify Before Grand Jury to Regional Director,Safeguards Branch Chief & Chief of Security & Investigations Section
ML20126D19012 August 1977PNO-77-143:Pacific Pump Co Supplied Facilities W/Production Lot of 40 Pumps Mfg Using Shafts Made of Inferior Matl. Cause Unstated.All Utils W/Pumps Were Notified.Nrc Headquarters Notified on 770812
ML20151Y20519 July 1977PNO-77-131:on 770712,bypassing of Safety Signals Occurred. Pressurizer Pressure & SG Levels Remained Essentially Constant During Event.No Damage to Any Equipment Noted After Levels Restored to Normal
ML20151X63111 July 1977PNO-77-124:on 770710,Commonwealth Edison Reported That Unit 2 Reactor Scram Occurred Due to 2C SG Low Level Condition. Condition Caused by Loss of Feedwater Pump While Performing Maint on Feedwater Pump Lube Oil Filter Sys