Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
PNO-IV-99-043, on 991016,earthquake of Magnitude 7 Occurred. Plant Operations Were Not Disrupted.Unusual Event Classifications Were Exited within 1 H at Both Facilities.No Damage Was Indicated & No Residual Plant Effects Observed | 18 October 1999 | PNO-IV-99-043:on 991016,earthquake of Magnitude 7 Occurred. Plant Operations Were Not Disrupted.Unusual Event Classifications Were Exited within 1 H at Both Facilities.No Damage Was Indicated & No Residual Plant Effects Observed | Earthquake |
PNO-IV-99-018, on 990305,declared SONGS Units 2 & 3 Alert Because Potential Bomb Threat Occurred.Device Was 12-inch long,2-inch Diameter Copper Pipe,With Both Ends Capped. Licensee Notified State & Local Officials | 5 March 1999 | PNO-IV-99-018:on 990305,declared SONGS Units 2 & 3 Alert Because Potential Bomb Threat Occurred.Device Was 12-inch long,2-inch Diameter Copper Pipe,With Both Ends Capped. Licensee Notified State & Local Officials | |
PNO-IV-98-041, on 980918,control Room Operators Observed Alarm on One Channel of Main Condenser Steam Jet Air Ejector Radiation Monitoring Equipment,Which Indicated That Activity of Condenser Exhaust Had Increased by About Two Decades | 18 September 1998 | PNO-IV-98-041:on 980918,control Room Operators Observed Alarm on One Channel of Main Condenser Steam Jet Air Ejector Radiation Monitoring Equipment,Which Indicated That Activity of Condenser Exhaust Had Increased by About Two Decades | |
PNO-IV-97-038, on 970629,Unit 2 Entered Mode 3 & Mode 4 in Preparation for Draining to Midloop.Two Charging Lines to RCS Did Not Have Balanced Flow.Same Valve Was Found to Be Partially Stuck Closed in Units 2 & 3.Plant Shutdowned | 30 June 1997 | PNO-IV-97-038:on 970629,Unit 2 Entered Mode 3 & Mode 4 in Preparation for Draining to Midloop.Two Charging Lines to RCS Did Not Have Balanced Flow.Same Valve Was Found to Be Partially Stuck Closed in Units 2 & 3.Plant Shutdowned | |
PNO-V-93-020, on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts | 18 November 1993 | PNO-V-93-020:on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts | |
PNO-V-91-016, on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter | 9 August 1991 | PNO-V-91-016:on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter | |
PNO-V-91-014, on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg | 16 July 1991 | PNO-V-91-014:on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg | |
PNO-V-90-047B, updates 901120 Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys | 23 November 1990 | PNO-V-90-047B:updates 901120 Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys | |
PNO-V-90-047A, on 901120,updates Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys | 21 November 1990 | PNO-V-90-047A:on 901120,updates Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys | |
PNO-V-90-047, on 901120,actuation Signal Initiated by Plant Protection Sys While Testing PPS Channel | 20 November 1990 | PNO-V-90-047:on 901120,actuation Signal Initiated by Plant Protection Sys While Testing PPS Channel | |
PNO-V-90-036, on 900910,small Amount of Contamination Found on Injured Worker Clothing During Transport to Hosp. Contaminated Clothing Removed Enroute to Hosp & Injuries to Worker Considered Minor.No Press Release Planned | 10 September 1990 | PNO-V-90-036:on 900910,small Amount of Contamination Found on Injured Worker Clothing During Transport to Hosp. Contaminated Clothing Removed Enroute to Hosp & Injuries to Worker Considered Minor.No Press Release Planned | |
PNO-V-90-035, on 900804,fire Discovered in Noncontaminated Laundry Room in Units 2 & 3 Shared Radwaste Bldg.Caused by Overheated Clothing Dryer.No Radiological Release Resulted from Fire & No safety-related Equipment Affected | 6 August 1990 | PNO-V-90-035:on 900804,fire Discovered in Noncontaminated Laundry Room in Units 2 & 3 Shared Radwaste Bldg.Caused by Overheated Clothing Dryer.No Radiological Release Resulted from Fire & No safety-related Equipment Affected | |
PNO-V-90-034, on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed | 30 July 1990 | PNO-V-90-034:on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed | |
PNO-V-88-014, on 880219,inadvertent Safety Injection Actuation Occurred While Testing of Actuation Logic Matrix Was in Progress & W/Unit at 100% Power.Unit Stabilized W/O Complication & Safety Injection Components Restored | 22 February 1988 | PNO-V-88-014:on 880219,inadvertent Safety Injection Actuation Occurred While Testing of Actuation Logic Matrix Was in Progress & W/Unit at 100% Power.Unit Stabilized W/O Complication & Safety Injection Components Restored | |
PNO-V-88-012, on 880211,moderate Earthquake,Measuring 4.7 on Richter Scale,Hit Whittier,Ca Area.No Seismic Alarms Activated at Plant.No Damage Identified at Site | 11 February 1988 | PNO-V-88-012:on 880211,moderate Earthquake,Measuring 4.7 on Richter Scale,Hit Whittier,Ca Area.No Seismic Alarms Activated at Plant.No Damage Identified at Site | Earthquake |
PNO-V-88-002, on 880116,reactor Shutdown Commenced for More than 48 H Due to Alarms on Main Generator Hydrogen Detraining Unit.Caused by Hydrogen Leak Into Stator Cooling Water Sys in Main Generator.Visual & Sonic Insps Performed | 19 January 1988 | PNO-V-88-002:on 880116,reactor Shutdown Commenced for More than 48 H Due to Alarms on Main Generator Hydrogen Detraining Unit.Caused by Hydrogen Leak Into Stator Cooling Water Sys in Main Generator.Visual & Sonic Insps Performed | |
ML20234D183 | 28 December 1987 | PNS-V-87-009A:on 871209,Region V Reported Licensee Investigating Rept of Card Playing in Security Alarm Station.Disiplinary Action:Three Supervisors Terminated & Nine Security Officers Suspended | |
ML20237A131 | 9 December 1987 | PNS-V-87-009:on 871208,NRC Notified That Nine Security Officers & Two Supervisors Under Investigation for Alleged Card Playing While on Duty in Central Alarm Room.Licensee Believes Activity Caused No Degradation in Security Sys | |
PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted | 24 November 1987 | PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted | Earthquake |
PNO-V-87-067, on 871007,licensee Reported That Recently Completed Single Failure Analyses Had Identified Potential Single Failures Which Had Not Previously Been Known.Lists Potential Single Failures Associated W/Esfs | 8 October 1987 | PNO-V-87-067:on 871007,licensee Reported That Recently Completed Single Failure Analyses Had Identified Potential Single Failures Which Had Not Previously Been Known.Lists Potential Single Failures Associated W/Esfs | Unanalyzed Condition |
PNO-V-87-065, on 871004,significant Aftershock Experienced from 871001 Earthquake.Aftershock Registered 5.5 on Richter Scale.Seismic Instruments Actuated at 0.014g at Unit 1.No Damage to Equipment Occurred | 5 October 1987 | PNO-V-87-065:on 871004,significant Aftershock Experienced from 871001 Earthquake.Aftershock Registered 5.5 on Richter Scale.Seismic Instruments Actuated at 0.014g at Unit 1.No Damage to Equipment Occurred | Earthquake |
PNO-V-87-063, on 871001,moderate Earthquake Experienced at Plant.Unusual Event Declared.No Damage Identified at Site. Util Headquarters Evacuated to Inspect for Structural Damage | 1 October 1987 | PNO-V-87-063:on 871001,moderate Earthquake Experienced at Plant.Unusual Event Declared.No Damage Identified at Site. Util Headquarters Evacuated to Inspect for Structural Damage | Earthquake |
PNO-V-87-059, on 870831,five People Involved in Operating Cooling Suction Valve 2HV-9378 Found Contaminated by I-131 Due to Unisolable Leak in Valve.Caused by Failure of Valve & Valve Packing.Nature of Failure Under Investigation | 1 September 1987 | PNO-V-87-059:on 870831,five People Involved in Operating Cooling Suction Valve 2HV-9378 Found Contaminated by I-131 Due to Unisolable Leak in Valve.Caused by Failure of Valve & Valve Packing.Nature of Failure Under Investigation | |
PNO-V-87-047A, on 870621,interruption in Power to Phase B of non-1E Uninterruptible Power Supply Caused Sharp Reduction in Feedwater Control Valve for Steam Generator 88,causing Reactor Trip.Update Confirms Operation of Safety Functions | 24 June 1987 | PNO-V-87-047A:on 870621,interruption in Power to Phase B of non-1E Uninterruptible Power Supply Caused Sharp Reduction in Feedwater Control Valve for Steam Generator 88,causing Reactor Trip.Update Confirms Operation of Safety Functions | |
PNO-V-87-047, on 870621,interruption in Power to Phase B of non-1E Uninterruptable Power Supply Caused Sharp Reduction in Feedwater Flow to Steam Generator 88 & Subsequent Reactor Trip.Caused by Loose Cable Plug Lug.Lugs Inspected | 22 June 1987 | PNO-V-87-047:on 870621,interruption in Power to Phase B of non-1E Uninterruptable Power Supply Caused Sharp Reduction in Feedwater Flow to Steam Generator 88 & Subsequent Reactor Trip.Caused by Loose Cable Plug Lug.Lugs Inspected | |
PNO-V-87-021, on 870310,reactor Tripped Due to Turbine Trip from Grounded Exciter.Caused by Maint Personnel Dropping Exciter Brush in Rigging.Licensee Plans Shutdown of Unit for 1 Wk to Perform Maint | 11 March 1987 | PNO-V-87-021:on 870310,reactor Tripped Due to Turbine Trip from Grounded Exciter.Caused by Maint Personnel Dropping Exciter Brush in Rigging.Licensee Plans Shutdown of Unit for 1 Wk to Perform Maint | |
PNO-V-87-017, on 870223,licensee Informed Region V That Press Release Made Re 870221 Discovery of Small Particle of Radioactive Matl in Employee Home.Caused by Exposure to Leaking Fuel Pins.Region Will Conduct Special Insp | 24 February 1987 | PNO-V-87-017:on 870223,licensee Informed Region V That Press Release Made Re 870221 Discovery of Small Particle of Radioactive Matl in Employee Home.Caused by Exposure to Leaking Fuel Pins.Region Will Conduct Special Insp | |
PNO-V-87-009, on 870202,plant Worker Repeatedly Caused Portal Radiation Monitor to Alarm on Exit from Work Activities in Containment Bldg.Radioactive Matl Found on Inside Sleeve of Shirt.Survey Procedures Improved to Control Exposure | 5 February 1987 | PNO-V-87-009:on 870202,plant Worker Repeatedly Caused Portal Radiation Monitor to Alarm on Exit from Work Activities in Containment Bldg.Radioactive Matl Found on Inside Sleeve of Shirt.Survey Procedures Improved to Control Exposure | |
PNO-V-86-092B, on 870112,licensee Submitted Rept Stating That Investigation of Potential Hand Exposure Incomplete. Occurrence of Exposure Not Established.Most Likely Exposure Source Would Involve Direct Contact W/Fuel Specks | 13 January 1987 | PNO-V-86-092B:on 870112,licensee Submitted Rept Stating That Investigation of Potential Hand Exposure Incomplete. Occurrence of Exposure Not Established.Most Likely Exposure Source Would Involve Direct Contact W/Fuel Specks | |
PNO-V-86-092A, on 861216,insp Confirmed Licensee Dedicating Resources & Mgt to Resolve Potential Extremity Exposure. Medical Consultant Conferred W/Licensee Re Biological Indicators.Source Could Be Direct Contact W/Fuel Specks | 17 December 1986 | PNO-V-86-092A:on 861216,insp Confirmed Licensee Dedicating Resources & Mgt to Resolve Potential Extremity Exposure. Medical Consultant Conferred W/Licensee Re Biological Indicators.Source Could Be Direct Contact W/Fuel Specks | |
PNO-V-86-092, on 861212,reported That Quarterly Exposure Limit for Worker Exceeded.Right Hand Received Dose of 511.99 Rem,Left Hand 160 Mrem & Whole Body 114 Mrem.Worker Involved in Oct 1986 Reactor Coolant Pump Seal Overhaul | 12 December 1986 | PNO-V-86-092:on 861212,reported That Quarterly Exposure Limit for Worker Exceeded.Right Hand Received Dose of 511.99 Rem,Left Hand 160 Mrem & Whole Body 114 Mrem.Worker Involved in Oct 1986 Reactor Coolant Pump Seal Overhaul | |
PNO-V-86-091, on 861210 Turbine Tripped Due to Interruption of Power to non-1E Instrument Bus,Causing Reactor Trip. Event Under Investigation.Steam Bypass Control Sys Did Not Operate Because of Deenergized Instrument Bus | 11 December 1986 | PNO-V-86-091:on 861210 Turbine Tripped Due to Interruption of Power to non-1E Instrument Bus,Causing Reactor Trip. Event Under Investigation.Steam Bypass Control Sys Did Not Operate Because of Deenergized Instrument Bus | |
ML20215C727 | 5 December 1986 | PNS-V-86-007A:investigation by Corporate Security Personnel of Unauthorized Manipulation of Plant Components Expanded to Approx 62 Individuals.No Indications of Addl Tampering Identified.Region V Inspector Met W/Fbi | |
ML20214U957 | 3 December 1986 | PNS-V-86-007:on 861129,red & Green Indicating Light Lenses Found Reversed for Various Equipment & on 861202,determined That 10 Circuit Breakers Manipulated.Unauthorized Component Manipulation Under Investigation.Fbi Assistance Requested | |
PNO-V-86-080, on 861113,unit Shut Down to Correct Lube Oil Leak on Inboard Motor Bearing of West Main Feed Pump. Leakage Was Through Labyrinth Seal Associated W/Bearing. Bearing Seal Disassembled for Evaluation | 14 November 1986 | PNO-V-86-080:on 861113,unit Shut Down to Correct Lube Oil Leak on Inboard Motor Bearing of West Main Feed Pump. Leakage Was Through Labyrinth Seal Associated W/Bearing. Bearing Seal Disassembled for Evaluation | |
PNO-V-86-073, GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress | 23 October 1986 | PNO-V-86-073:GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress | |
PNO-V-86-066, on 860929,shutdown Commenced Due to Excessive Leakage from Reactor Coolant Pump Seal.Seals to Be Replaced & Addl Maint Performed | 30 September 1986 | PNO-V-86-066:on 860929,shutdown Commenced Due to Excessive Leakage from Reactor Coolant Pump Seal.Seals to Be Replaced & Addl Maint Performed | |
PNO-V-86-052, on 860805,reactor Trip Initiated by Turbine Load Rejection When Control Valves Closed,Causing Insurge of Water Into Pressurizer.Cause Under Investigation | 5 August 1986 | PNO-V-86-052:on 860805,reactor Trip Initiated by Turbine Load Rejection When Control Valves Closed,Causing Insurge of Water Into Pressurizer.Cause Under Investigation | |
PNO-V-86-049, on 860729 & 30,pressure Transmitter 459 Failed Low Resulting in Steam Flow/Feed Flow Mismatch Trip Circuits Becoming Inoperable.Caused by Failed Electric Card in Pressure Transmitter Amplifier.Amplifier Replaced | 30 July 1986 | PNO-V-86-049:on 860729 & 30,pressure Transmitter 459 Failed Low Resulting in Steam Flow/Feed Flow Mismatch Trip Circuits Becoming Inoperable.Caused by Failed Electric Card in Pressure Transmitter Amplifier.Amplifier Replaced | |
PNO-V-86-045, on 860717,reactor Trip Occurred from 3% Power. Caused by Momentary Drop in Voltage Through break-before- Make Switch.Momentary Drop Allowed Permissive P7 to Unblock & Trip Signal Went to Reactor Protection Sys | 17 July 1986 | PNO-V-86-045:on 860717,reactor Trip Occurred from 3% Power. Caused by Momentary Drop in Voltage Through break-before- Make Switch.Momentary Drop Allowed Permissive P7 to Unblock & Trip Signal Went to Reactor Protection Sys | |
PNO-V-86-043, on 860715,criticality Achieved Following Eighth Refueling Outage.Unit Shutdown for 236 Days Following 851121 Loss of Power & Water Hammer Event.Unit Scheduled to Go on-line After Completion of Low Power Physics Testing | 15 July 1986 | PNO-V-86-043:on 860715,criticality Achieved Following Eighth Refueling Outage.Unit Shutdown for 236 Days Following 851121 Loss of Power & Water Hammer Event.Unit Scheduled to Go on-line After Completion of Low Power Physics Testing | |
PNO-V-86-041, on 860713,earthquake Measuring 5.7 on Richter Scale & Aftershocks Occurred Actuating Seismic Alarms.Insp Procedures Implemented.No Abnormal Condition Noted.Effects Also Felt at Listed Nonpower Reactors | 14 July 1986 | PNO-V-86-041:on 860713,earthquake Measuring 5.7 on Richter Scale & Aftershocks Occurred Actuating Seismic Alarms.Insp Procedures Implemented.No Abnormal Condition Noted.Effects Also Felt at Listed Nonpower Reactors | Earthquake |
PNO-V-86-039, on 860708,earthquake w/6.0 Reading on Richter Scale Actuated Seismic Alarms & Recording Instruments. Procedures for Visual Insp of Plant Equipment & Start Test of Diesel Generators Implemented | 8 July 1986 | PNO-V-86-039:on 860708,earthquake w/6.0 Reading on Richter Scale Actuated Seismic Alarms & Recording Instruments. Procedures for Visual Insp of Plant Equipment & Start Test of Diesel Generators Implemented | Earthquake |
PNO-V-86-032, on 860612,facility Resumed Operation After Second Refueling Outage.Outage Included Replacement of Reactor Coolant Pump Seal Packages & Testing motor-operated Valves Per IE Bulletin 86-003 | 16 June 1986 | PNO-V-86-032:on 860612,facility Resumed Operation After Second Refueling Outage.Outage Included Replacement of Reactor Coolant Pump Seal Packages & Testing motor-operated Valves Per IE Bulletin 86-003 | |
PNO-V-86-022, on 860413,reactor Tripped After Achieving Criticality. Caused by Minor Control Rod Misalignments. Incorrect Estimated Critical Position Caused by Incorrect Xenon Tables in Operations Physics Data Summary Book | 24 April 1986 | PNO-V-86-022:on 860413,reactor Tripped After Achieving Criticality. Caused by Minor Control Rod Misalignments. Incorrect Estimated Critical Position Caused by Incorrect Xenon Tables in Operations Physics Data Summary Book | Shutdown Margin |
ML20210K739 | 22 April 1986 | PNS-V-86-002:on 860421,shots Fired by Unknown Assailant at Contractor Employee Making Routine Motorized Theft Abatement Tour of Controlled Area Known as Mesa.Six Bullets Hit Windshield.Authorities Notified | |
PNO-V-86-012, on 860327,loss of Both Shutdown Cooling Trains Experienced Due to Loss of Pump Suction & Cavitation.Caused by Reactor Vessel Water Vortexing Causing Air to Be Pulled Into Shutdown Cooling Lines | 28 March 1986 | PNO-V-86-012:on 860327,loss of Both Shutdown Cooling Trains Experienced Due to Loss of Pump Suction & Cavitation.Caused by Reactor Vessel Water Vortexing Causing Air to Be Pulled Into Shutdown Cooling Lines | Reactor Vessel Water Level |
PNO-V-86-009, on 860227,unusual Event Declared When Small Leak from Pressurizer Instrument Top Weld Discovered. Borating Began to Achieve Necessary Shutdown Margin.Cooldown & Leak Repair Planned | 27 February 1986 | PNO-V-86-009:on 860227,unusual Event Declared When Small Leak from Pressurizer Instrument Top Weld Discovered. Borating Began to Achieve Necessary Shutdown Margin.Cooldown & Leak Repair Planned | Shutdown Margin Pressure Boundary Leakage |
PNO-V-85-085, on 851210,reactor Tripped from 100% Power. Caused by Low Steam Generator Water Level Resulting from Main Feedwater Header Containment Isolation Valve Drifting Shut.All ESF Sys Functioned as Required.Reactor Restarted | 11 December 1985 | PNO-V-85-085:on 851210,reactor Tripped from 100% Power. Caused by Low Steam Generator Water Level Resulting from Main Feedwater Header Containment Isolation Valve Drifting Shut.All ESF Sys Functioned as Required.Reactor Restarted | |
ML20138B487 | 10 December 1985 | PNO-IIT-85-002D:on 851121,unit Tripped.Incident Investigation Team Will Complete Remaining Interviews & Review Results of Licensee Investigaton.Prime Hypothesis Explaining Events Described in PNO-IIT-85-002B Encl |