 Issue dateTitleTopic
PNO-IV-99-043, on 991016,earthquake of Magnitude 7 Occurred. Plant Operations Were Not Disrupted.Unusual Event Classifications Were Exited within 1 H at Both Facilities.No Damage Was Indicated & No Residual Plant Effects Observed18 October 1999PNO-IV-99-043:on 991016,earthquake of Magnitude 7 Occurred. Plant Operations Were Not Disrupted.Unusual Event Classifications Were Exited within 1 H at Both Facilities.No Damage Was Indicated & No Residual Plant Effects ObservedEarthquake
PNO-IV-99-018, on 990305,declared SONGS Units 2 & 3 Alert Because Potential Bomb Threat Occurred.Device Was 12-inch long,2-inch Diameter Copper Pipe,With Both Ends Capped. Licensee Notified State & Local Officials5 March 1999PNO-IV-99-018:on 990305,declared SONGS Units 2 & 3 Alert Because Potential Bomb Threat Occurred.Device Was 12-inch long,2-inch Diameter Copper Pipe,With Both Ends Capped. Licensee Notified State & Local Officials
PNO-IV-98-041, on 980918,control Room Operators Observed Alarm on One Channel of Main Condenser Steam Jet Air Ejector Radiation Monitoring Equipment,Which Indicated That Activity of Condenser Exhaust Had Increased by About Two Decades18 September 1998PNO-IV-98-041:on 980918,control Room Operators Observed Alarm on One Channel of Main Condenser Steam Jet Air Ejector Radiation Monitoring Equipment,Which Indicated That Activity of Condenser Exhaust Had Increased by About Two Decades
PNO-IV-97-038, on 970629,Unit 2 Entered Mode 3 & Mode 4 in Preparation for Draining to Midloop.Two Charging Lines to RCS Did Not Have Balanced Flow.Same Valve Was Found to Be Partially Stuck Closed in Units 2 & 3.Plant Shutdowned30 June 1997PNO-IV-97-038:on 970629,Unit 2 Entered Mode 3 & Mode 4 in Preparation for Draining to Midloop.Two Charging Lines to RCS Did Not Have Balanced Flow.Same Valve Was Found to Be Partially Stuck Closed in Units 2 & 3.Plant Shutdowned
PNO-V-93-020, on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts18 November 1993PNO-V-93-020:on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts
PNO-V-91-016, on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter9 August 1991PNO-V-91-016:on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter
PNO-V-91-014, on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg16 July 1991PNO-V-91-014:on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg
PNO-V-90-047B, updates 901120 Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys23 November 1990PNO-V-90-047B:updates 901120 Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys
PNO-V-90-047A, on 901120,updates Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys21 November 1990PNO-V-90-047A:on 901120,updates Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys
PNO-V-90-047, on 901120,actuation Signal Initiated by Plant Protection Sys While Testing PPS Channel20 November 1990PNO-V-90-047:on 901120,actuation Signal Initiated by Plant Protection Sys While Testing PPS Channel
PNO-V-90-036, on 900910,small Amount of Contamination Found on Injured Worker Clothing During Transport to Hosp. Contaminated Clothing Removed Enroute to Hosp & Injuries to Worker Considered Minor.No Press Release Planned10 September 1990PNO-V-90-036:on 900910,small Amount of Contamination Found on Injured Worker Clothing During Transport to Hosp. Contaminated Clothing Removed Enroute to Hosp & Injuries to Worker Considered Minor.No Press Release Planned
PNO-V-90-035, on 900804,fire Discovered in Noncontaminated Laundry Room in Units 2 & 3 Shared Radwaste Bldg.Caused by Overheated Clothing Dryer.No Radiological Release Resulted from Fire & No safety-related Equipment Affected6 August 1990PNO-V-90-035:on 900804,fire Discovered in Noncontaminated Laundry Room in Units 2 & 3 Shared Radwaste Bldg.Caused by Overheated Clothing Dryer.No Radiological Release Resulted from Fire & No safety-related Equipment Affected
PNO-V-90-034, on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed30 July 1990PNO-V-90-034:on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed
PNO-V-88-014, on 880219,inadvertent Safety Injection Actuation Occurred While Testing of Actuation Logic Matrix Was in Progress & W/Unit at 100% Power.Unit Stabilized W/O Complication & Safety Injection Components Restored22 February 1988PNO-V-88-014:on 880219,inadvertent Safety Injection Actuation Occurred While Testing of Actuation Logic Matrix Was in Progress & W/Unit at 100% Power.Unit Stabilized W/O Complication & Safety Injection Components Restored
PNO-V-88-012, on 880211,moderate Earthquake,Measuring 4.7 on Richter Scale,Hit Whittier,Ca Area.No Seismic Alarms Activated at Plant.No Damage Identified at Site11 February 1988PNO-V-88-012:on 880211,moderate Earthquake,Measuring 4.7 on Richter Scale,Hit Whittier,Ca Area.No Seismic Alarms Activated at Plant.No Damage Identified at SiteEarthquake
PNO-V-88-002, on 880116,reactor Shutdown Commenced for More than 48 H Due to Alarms on Main Generator Hydrogen Detraining Unit.Caused by Hydrogen Leak Into Stator Cooling Water Sys in Main Generator.Visual & Sonic Insps Performed19 January 1988PNO-V-88-002:on 880116,reactor Shutdown Commenced for More than 48 H Due to Alarms on Main Generator Hydrogen Detraining Unit.Caused by Hydrogen Leak Into Stator Cooling Water Sys in Main Generator.Visual & Sonic Insps Performed
ML20234D18328 December 1987PNS-V-87-009A:on 871209,Region V Reported Licensee Investigating Rept of Card Playing in Security Alarm Station.Disiplinary Action:Three Supervisors Terminated & Nine Security Officers Suspended
ML20237A1319 December 1987PNS-V-87-009:on 871208,NRC Notified That Nine Security Officers & Two Supervisors Under Investigation for Alleged Card Playing While on Duty in Central Alarm Room.Licensee Believes Activity Caused No Degradation in Security Sys
PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted24 November 1987PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations NotedEarthquake
PNO-V-87-067, on 871007,licensee Reported That Recently Completed Single Failure Analyses Had Identified Potential Single Failures Which Had Not Previously Been Known.Lists Potential Single Failures Associated W/Esfs8 October 1987PNO-V-87-067:on 871007,licensee Reported That Recently Completed Single Failure Analyses Had Identified Potential Single Failures Which Had Not Previously Been Known.Lists Potential Single Failures Associated W/EsfsUnanalyzed Condition
PNO-V-87-065, on 871004,significant Aftershock Experienced from 871001 Earthquake.Aftershock Registered 5.5 on Richter Scale.Seismic Instruments Actuated at 0.014g at Unit 1.No Damage to Equipment Occurred5 October 1987PNO-V-87-065:on 871004,significant Aftershock Experienced from 871001 Earthquake.Aftershock Registered 5.5 on Richter Scale.Seismic Instruments Actuated at 0.014g at Unit 1.No Damage to Equipment OccurredEarthquake
PNO-V-87-063, on 871001,moderate Earthquake Experienced at Plant.Unusual Event Declared.No Damage Identified at Site. Util Headquarters Evacuated to Inspect for Structural Damage1 October 1987PNO-V-87-063:on 871001,moderate Earthquake Experienced at Plant.Unusual Event Declared.No Damage Identified at Site. Util Headquarters Evacuated to Inspect for Structural DamageEarthquake
PNO-V-87-059, on 870831,five People Involved in Operating Cooling Suction Valve 2HV-9378 Found Contaminated by I-131 Due to Unisolable Leak in Valve.Caused by Failure of Valve & Valve Packing.Nature of Failure Under Investigation1 September 1987PNO-V-87-059:on 870831,five People Involved in Operating Cooling Suction Valve 2HV-9378 Found Contaminated by I-131 Due to Unisolable Leak in Valve.Caused by Failure of Valve & Valve Packing.Nature of Failure Under Investigation
PNO-V-87-047A, on 870621,interruption in Power to Phase B of non-1E Uninterruptible Power Supply Caused Sharp Reduction in Feedwater Control Valve for Steam Generator 88,causing Reactor Trip.Update Confirms Operation of Safety Functions24 June 1987PNO-V-87-047A:on 870621,interruption in Power to Phase B of non-1E Uninterruptible Power Supply Caused Sharp Reduction in Feedwater Control Valve for Steam Generator 88,causing Reactor Trip.Update Confirms Operation of Safety Functions
PNO-V-87-047, on 870621,interruption in Power to Phase B of non-1E Uninterruptable Power Supply Caused Sharp Reduction in Feedwater Flow to Steam Generator 88 & Subsequent Reactor Trip.Caused by Loose Cable Plug Lug.Lugs Inspected22 June 1987PNO-V-87-047:on 870621,interruption in Power to Phase B of non-1E Uninterruptable Power Supply Caused Sharp Reduction in Feedwater Flow to Steam Generator 88 & Subsequent Reactor Trip.Caused by Loose Cable Plug Lug.Lugs Inspected
PNO-V-87-021, on 870310,reactor Tripped Due to Turbine Trip from Grounded Exciter.Caused by Maint Personnel Dropping Exciter Brush in Rigging.Licensee Plans Shutdown of Unit for 1 Wk to Perform Maint11 March 1987PNO-V-87-021:on 870310,reactor Tripped Due to Turbine Trip from Grounded Exciter.Caused by Maint Personnel Dropping Exciter Brush in Rigging.Licensee Plans Shutdown of Unit for 1 Wk to Perform Maint
PNO-V-87-017, on 870223,licensee Informed Region V That Press Release Made Re 870221 Discovery of Small Particle of Radioactive Matl in Employee Home.Caused by Exposure to Leaking Fuel Pins.Region Will Conduct Special Insp24 February 1987PNO-V-87-017:on 870223,licensee Informed Region V That Press Release Made Re 870221 Discovery of Small Particle of Radioactive Matl in Employee Home.Caused by Exposure to Leaking Fuel Pins.Region Will Conduct Special Insp
PNO-V-87-009, on 870202,plant Worker Repeatedly Caused Portal Radiation Monitor to Alarm on Exit from Work Activities in Containment Bldg.Radioactive Matl Found on Inside Sleeve of Shirt.Survey Procedures Improved to Control Exposure5 February 1987PNO-V-87-009:on 870202,plant Worker Repeatedly Caused Portal Radiation Monitor to Alarm on Exit from Work Activities in Containment Bldg.Radioactive Matl Found on Inside Sleeve of Shirt.Survey Procedures Improved to Control Exposure
PNO-V-86-092B, on 870112,licensee Submitted Rept Stating That Investigation of Potential Hand Exposure Incomplete. Occurrence of Exposure Not Established.Most Likely Exposure Source Would Involve Direct Contact W/Fuel Specks13 January 1987PNO-V-86-092B:on 870112,licensee Submitted Rept Stating That Investigation of Potential Hand Exposure Incomplete. Occurrence of Exposure Not Established.Most Likely Exposure Source Would Involve Direct Contact W/Fuel Specks
PNO-V-86-092A, on 861216,insp Confirmed Licensee Dedicating Resources & Mgt to Resolve Potential Extremity Exposure. Medical Consultant Conferred W/Licensee Re Biological Indicators.Source Could Be Direct Contact W/Fuel Specks17 December 1986PNO-V-86-092A:on 861216,insp Confirmed Licensee Dedicating Resources & Mgt to Resolve Potential Extremity Exposure. Medical Consultant Conferred W/Licensee Re Biological Indicators.Source Could Be Direct Contact W/Fuel Specks
PNO-V-86-092, on 861212,reported That Quarterly Exposure Limit for Worker Exceeded.Right Hand Received Dose of 511.99 Rem,Left Hand 160 Mrem & Whole Body 114 Mrem.Worker Involved in Oct 1986 Reactor Coolant Pump Seal Overhaul12 December 1986PNO-V-86-092:on 861212,reported That Quarterly Exposure Limit for Worker Exceeded.Right Hand Received Dose of 511.99 Rem,Left Hand 160 Mrem & Whole Body 114 Mrem.Worker Involved in Oct 1986 Reactor Coolant Pump Seal Overhaul
PNO-V-86-091, on 861210 Turbine Tripped Due to Interruption of Power to non-1E Instrument Bus,Causing Reactor Trip. Event Under Investigation.Steam Bypass Control Sys Did Not Operate Because of Deenergized Instrument Bus11 December 1986PNO-V-86-091:on 861210 Turbine Tripped Due to Interruption of Power to non-1E Instrument Bus,Causing Reactor Trip. Event Under Investigation.Steam Bypass Control Sys Did Not Operate Because of Deenergized Instrument Bus
ML20215C7275 December 1986PNS-V-86-007A:investigation by Corporate Security Personnel of Unauthorized Manipulation of Plant Components Expanded to Approx 62 Individuals.No Indications of Addl Tampering Identified.Region V Inspector Met W/Fbi
ML20214U9573 December 1986PNS-V-86-007:on 861129,red & Green Indicating Light Lenses Found Reversed for Various Equipment & on 861202,determined That 10 Circuit Breakers Manipulated.Unauthorized Component Manipulation Under Investigation.Fbi Assistance Requested
PNO-V-86-080, on 861113,unit Shut Down to Correct Lube Oil Leak on Inboard Motor Bearing of West Main Feed Pump. Leakage Was Through Labyrinth Seal Associated W/Bearing. Bearing Seal Disassembled for Evaluation14 November 1986PNO-V-86-080:on 861113,unit Shut Down to Correct Lube Oil Leak on Inboard Motor Bearing of West Main Feed Pump. Leakage Was Through Labyrinth Seal Associated W/Bearing. Bearing Seal Disassembled for Evaluation
PNO-V-86-073, GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress23 October 1986PNO-V-86-073:GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress
PNO-V-86-066, on 860929,shutdown Commenced Due to Excessive Leakage from Reactor Coolant Pump Seal.Seals to Be Replaced & Addl Maint Performed30 September 1986PNO-V-86-066:on 860929,shutdown Commenced Due to Excessive Leakage from Reactor Coolant Pump Seal.Seals to Be Replaced & Addl Maint Performed
PNO-V-86-052, on 860805,reactor Trip Initiated by Turbine Load Rejection When Control Valves Closed,Causing Insurge of Water Into Pressurizer.Cause Under Investigation5 August 1986PNO-V-86-052:on 860805,reactor Trip Initiated by Turbine Load Rejection When Control Valves Closed,Causing Insurge of Water Into Pressurizer.Cause Under Investigation
PNO-V-86-049, on 860729 & 30,pressure Transmitter 459 Failed Low Resulting in Steam Flow/Feed Flow Mismatch Trip Circuits Becoming Inoperable.Caused by Failed Electric Card in Pressure Transmitter Amplifier.Amplifier Replaced30 July 1986PNO-V-86-049:on 860729 & 30,pressure Transmitter 459 Failed Low Resulting in Steam Flow/Feed Flow Mismatch Trip Circuits Becoming Inoperable.Caused by Failed Electric Card in Pressure Transmitter Amplifier.Amplifier Replaced
PNO-V-86-045, on 860717,reactor Trip Occurred from 3% Power. Caused by Momentary Drop in Voltage Through break-before- Make Switch.Momentary Drop Allowed Permissive P7 to Unblock & Trip Signal Went to Reactor Protection Sys17 July 1986PNO-V-86-045:on 860717,reactor Trip Occurred from 3% Power. Caused by Momentary Drop in Voltage Through break-before- Make Switch.Momentary Drop Allowed Permissive P7 to Unblock & Trip Signal Went to Reactor Protection Sys
PNO-V-86-043, on 860715,criticality Achieved Following Eighth Refueling Outage.Unit Shutdown for 236 Days Following 851121 Loss of Power & Water Hammer Event.Unit Scheduled to Go on-line After Completion of Low Power Physics Testing15 July 1986PNO-V-86-043:on 860715,criticality Achieved Following Eighth Refueling Outage.Unit Shutdown for 236 Days Following 851121 Loss of Power & Water Hammer Event.Unit Scheduled to Go on-line After Completion of Low Power Physics Testing
PNO-V-86-041, on 860713,earthquake Measuring 5.7 on Richter Scale & Aftershocks Occurred Actuating Seismic Alarms.Insp Procedures Implemented.No Abnormal Condition Noted.Effects Also Felt at Listed Nonpower Reactors14 July 1986PNO-V-86-041:on 860713,earthquake Measuring 5.7 on Richter Scale & Aftershocks Occurred Actuating Seismic Alarms.Insp Procedures Implemented.No Abnormal Condition Noted.Effects Also Felt at Listed Nonpower ReactorsEarthquake
PNO-V-86-039, on 860708,earthquake w/6.0 Reading on Richter Scale Actuated Seismic Alarms & Recording Instruments. Procedures for Visual Insp of Plant Equipment & Start Test of Diesel Generators Implemented8 July 1986PNO-V-86-039:on 860708,earthquake w/6.0 Reading on Richter Scale Actuated Seismic Alarms & Recording Instruments. Procedures for Visual Insp of Plant Equipment & Start Test of Diesel Generators ImplementedEarthquake
PNO-V-86-032, on 860612,facility Resumed Operation After Second Refueling Outage.Outage Included Replacement of Reactor Coolant Pump Seal Packages & Testing motor-operated Valves Per IE Bulletin 86-00316 June 1986PNO-V-86-032:on 860612,facility Resumed Operation After Second Refueling Outage.Outage Included Replacement of Reactor Coolant Pump Seal Packages & Testing motor-operated Valves Per IE Bulletin 86-003
PNO-V-86-022, on 860413,reactor Tripped After Achieving Criticality. Caused by Minor Control Rod Misalignments. Incorrect Estimated Critical Position Caused by Incorrect Xenon Tables in Operations Physics Data Summary Book24 April 1986PNO-V-86-022:on 860413,reactor Tripped After Achieving Criticality. Caused by Minor Control Rod Misalignments. Incorrect Estimated Critical Position Caused by Incorrect Xenon Tables in Operations Physics Data Summary BookShutdown Margin
ML20210K73922 April 1986PNS-V-86-002:on 860421,shots Fired by Unknown Assailant at Contractor Employee Making Routine Motorized Theft Abatement Tour of Controlled Area Known as Mesa.Six Bullets Hit Windshield.Authorities Notified
PNO-V-86-012, on 860327,loss of Both Shutdown Cooling Trains Experienced Due to Loss of Pump Suction & Cavitation.Caused by Reactor Vessel Water Vortexing Causing Air to Be Pulled Into Shutdown Cooling Lines28 March 1986PNO-V-86-012:on 860327,loss of Both Shutdown Cooling Trains Experienced Due to Loss of Pump Suction & Cavitation.Caused by Reactor Vessel Water Vortexing Causing Air to Be Pulled Into Shutdown Cooling LinesReactor Vessel Water Level
PNO-V-86-009, on 860227,unusual Event Declared When Small Leak from Pressurizer Instrument Top Weld Discovered. Borating Began to Achieve Necessary Shutdown Margin.Cooldown & Leak Repair Planned27 February 1986PNO-V-86-009:on 860227,unusual Event Declared When Small Leak from Pressurizer Instrument Top Weld Discovered. Borating Began to Achieve Necessary Shutdown Margin.Cooldown & Leak Repair PlannedShutdown Margin
Pressure Boundary Leakage
PNO-V-85-085, on 851210,reactor Tripped from 100% Power. Caused by Low Steam Generator Water Level Resulting from Main Feedwater Header Containment Isolation Valve Drifting Shut.All ESF Sys Functioned as Required.Reactor Restarted11 December 1985PNO-V-85-085:on 851210,reactor Tripped from 100% Power. Caused by Low Steam Generator Water Level Resulting from Main Feedwater Header Containment Isolation Valve Drifting Shut.All ESF Sys Functioned as Required.Reactor Restarted
ML20138B48710 December 1985PNO-IIT-85-002D:on 851121,unit Tripped.Incident Investigation Team Will Complete Remaining Interviews & Review Results of Licensee Investigaton.Prime Hypothesis Explaining Events Described in PNO-IIT-85-002B Encl