L-99-146, LAR 149 to License NPF-73,requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing22 September 1999LAR 149 to License NPF-73,requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing
L-99-145, LARs 263 & 138 for Licenses DPR-66 & NPF-73,revising TS Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-0220 September 1999LARs 263 & 138 for Licenses DPR-66 & NPF-73,revising TS Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-02
PY-CEI-NRR-2427, Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations14 September 1999Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP ViolationsSafe Shutdown
Recently irradiated fuel
Fire Protection Program
PY-CEI-NRR-2430, Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons9 September 1999Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 GallonsHigh Radiation Area
Recently irradiated fuel
PY-CEI-NRR-2406, Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl9 September 1999Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is EnclZebra Mussel
PY-CEI-NRR-2420, Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4)9 September 1999Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4)Temporary Modification
PY-CEI-NRR-2418, Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable4 August 1999Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable
L-99-116, Application for Amends to Licenses DPR-66 & NPF-73,revising TS Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-0515 July 1999Application for Amends to Licenses DPR-66 & NPF-73,revising TS Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-05
L-99-103, Supplemental Application for Amend to License NPF-73, Including Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages28 June 1999Supplemental Application for Amend to License NPF-73, Including Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages
PY-CEI-NRR-2398, Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp17 June 1999Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at PnppSafe Shutdown
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Scram Discharge Volume
Maintenance Rule Program
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Grace period
Power change
L-99-080, Application for Amend to License NPF-73,updating TS Heatup, Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 Efpys.Proprietary LTOP Sys Setpoint Review, Encl.Proprietary Info Withheld,Per 10CFR2.70917 June 1999Application for Amend to License NPF-73,updating TS Heatup, Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 Efpys.Proprietary LTOP Sys Setpoint Review, Encl.Proprietary Info Withheld,Per 10CFR2.709Exemption Request
L-99-092, Application for Amends to Licenses DPR-66 & NPF-73, Relocating Seismic Monitoring Instrumentation Requirements Contained in TS 3/4.3.3.3 to Licensing Requirements Manual Based on Guidance Provided in GL 95-1027 May 1999Application for Amends to Licenses DPR-66 & NPF-73, Relocating Seismic Monitoring Instrumentation Requirements Contained in TS 3/4.3.3.3 to Licensing Requirements Manual Based on Guidance Provided in GL 95-10
L-99-091, Application for Amends to Licenses NPF-66 & NPF-73,revising Frequency Notation for Manual Functions Specified in ESFAS TS to More Clearly Denote Appropriate Refueling Frequency for Testing27 May 1999Application for Amends to Licenses NPF-66 & NPF-73,revising Frequency Notation for Manual Functions Specified in ESFAS TS to More Clearly Denote Appropriate Refueling Frequency for Testing
ML20206F5975 May 1999Application for Amend to License NPF-58,authorizing CEI to Possess Dl 13.74% Undivided Ownership Interest in Pnpp
ML20206F7555 May 1999Application for Amends to Licenses DPR-66 & NPF-73, Consenting to Transfer of Dl Ownership Interests in BVPS, Units 1 & 2 to Penn Power & Dl Operating Authority of Subject Licenses to Firstenergy Nuclear Operating CoSafe Shutdown
Fire Protection Program
PY-CEI-NRR-2362, Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl17 March 1999Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl
L-99-043, LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements16 March 1999LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements
L-99-045, LARs 264 & 139 for Licenses DPR-66 & NPF-73,modifying TS Bases Section 3/4.7.13,by Adding Wording Which Discusses Design Bases of Sys in Greater Depth16 March 1999LARs 264 & 139 for Licenses DPR-66 & NPF-73,modifying TS Bases Section 3/4.7.13,by Adding Wording Which Discusses Design Bases of Sys in Greater Depth
PY-CEI-NRR-2373, Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-115 March 1999Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-1
L-99-005, Application for Amends to Licenses DPR-66 & NPF-73,changing Qualifications for Operations Mgt & Incorporating Generic Titles in TS to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed3 March 1999Application for Amends to Licenses DPR-66 & NPF-73,changing Qualifications for Operations Mgt & Incorporating Generic Titles in TS to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed
PY-CEI-NRR-2359, Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld18 January 1999Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls WithheldProbabilistic Risk Assessment
Large early release frequency
Rod Drop Event
Affidavit
ML20199G53418 January 1999LARs 220 & 88 to Licenses DPR-66 & NPF-73,revising Limiting Safety Sys Settings 2.2.1 & Associated Table 2.2-1,including Revising Nonconservative Trip Setpoints & Allowable Values
PY-CEI-NRR-2352, Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs6 January 1999Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys CvsStroke time
Hydrostatic
Operator Manual Action
Earthquake
Power-Operated Valves
Backfit
L-98-238, LARs 262 & 135 to Licenses DPR-66 & DPR-73,modifying Applicable TS & Bases by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor24 December 1998LARs 262 & 135 to Licenses DPR-66 & DPR-73,modifying Applicable TS & Bases by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor
L-98-241, LARs 258 & 129 to Licenses DPR-66 & DPR-73,modifying TS 3/4.8.1, AC Sources for Units & Associated Bases to Clarify EDG Fuel Oil Storage Requirements by Addition of Term Usable24 December 1998LARs 258 & 129 to Licenses DPR-66 & DPR-73,modifying TS 3/4.8.1, AC Sources for Units & Associated Bases to Clarify EDG Fuel Oil Storage Requirements by Addition of Term Usable
L-98-213, LAR 261 for License DPR-66,modifying License Condition 2.C(9) to Allow one-time Extension of SG Insp Interval to Coincide with Thirteenth Refueling Outage or End of 500 Effective Full Power Days,Whichever Is Sooner11 November 1998LAR 261 for License DPR-66,modifying License Condition 2.C(9) to Allow one-time Extension of SG Insp Interval to Coincide with Thirteenth Refueling Outage or End of 500 Effective Full Power Days,Whichever Is Sooner
PY-CEI-NRR-2325, Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld27 October 1998Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info WithheldShutdown Margin
Safety Limit Minimum Critical Power Ratio
Fuel cladding
ULNRC-03910, Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld27 October 1998Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info WithheldNondestructive Examination
L-98-203, Application for Amend to License NPF-73,incorporating Temporary License Condition That Would Extend TS Surveillance Interval,Specified in Surveillance Requirement 4.8.1.1.1.b to First Entry Into Mode 4 After Cycle 7 RFO16 October 1998Application for Amend to License NPF-73,incorporating Temporary License Condition That Would Extend TS Surveillance Interval,Specified in Surveillance Requirement 4.8.1.1.1.b to First Entry Into Mode 4 After Cycle 7 RFO
L-98-201, Application for Amends to Licenses DPR-66 & NPF-73,adding Discussion That Explains Why Use of Time Constants, Expressed as Equality Such as T = X Seconds Are Acceptable15 October 1998Application for Amends to Licenses DPR-66 & NPF-73,adding Discussion That Explains Why Use of Time Constants, Expressed as Equality Such as T = X Seconds Are Acceptable
L-98-202, Proposed LARs 246 & 116 to Licenses DPR-66 & NPF-73,deleting Two License Requirements,Modifying LCO Applicability, Modifying Three Definitions,Changing Action Statement Number & Deleting Meteorological Monitoring Spec15 October 1998Proposed LARs 246 & 116 to Licenses DPR-66 & NPF-73,deleting Two License Requirements,Modifying LCO Applicability, Modifying Three Definitions,Changing Action Statement Number & Deleting Meteorological Monitoring Spec
L-98-185, Application for Amend to License NPF-73,eliminating Potential for non-conservative Interpretation of TS 3.1.2.8 Values for RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls24 September 1998Application for Amend to License NPF-73,eliminating Potential for non-conservative Interpretation of TS 3.1.2.8 Values for RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative ControlsBoric Acid
PY-CEI-NRR-2322, Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program9 September 1998Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test ProgramHydrostatic
Operator Manual Action
Earthquake
Power-Operated Valves
Backfit
PY-CEI-NRR-2298, Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storag3 September 1998Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storage TankSafe Shutdown
PY-CEI-NRR-2319, Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 23 September 1998Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 2Anticipated operational occurrence
Enforcement Discretion
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
Offsite Circuit
PY-CEI-NRR-2300, Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable31 August 1998Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be OperableHigh Radiation Area
Safe Shutdown Earthquake
Emergency Lighting
PY-CEI-NRR-2299, Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld22 July 1998Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info WithheldCold shutdown justification
ML20151P18913 July 1998Application for Amend to License NPF-58,revising Safety Setpoint Requirements for Srv.Proprietary Info & Affidavit Are Contained in Attachment 5.Proprietary Info WithheldFeedwater Controller Failure
L-98-144, Application for Amends to Licenses DPR-66 & NPF-73,revising UFSAR to Address Potential Flooding of Intake Structure Pump Cubicles Shared by Both Units13 July 1998Application for Amends to Licenses DPR-66 & NPF-73,revising UFSAR to Address Potential Flooding of Intake Structure Pump Cubicles Shared by Both Units
L-98-146, Application for Amends to Licenses DPR-66 & NPF-73,modifying TS 3.7.1.1, SVs & Associated Bases to Incorporate Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory Ltr 94-01,dtd 9401209 July 1998Application for Amends to Licenses DPR-66 & NPF-73,modifying TS 3.7.1.1, SVs & Associated Bases to Incorporate Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory Ltr 94-01,dtd 940120
L-98-143, Supplemental Application to Amend Licenses DPR-66 & NPF-73, Modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors & Was Submitted 9712199 July 1998Supplemental Application to Amend Licenses DPR-66 & NPF-73, Modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors & Was Submitted 971219
PY-CEI-NRR-2295, Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required30 June 1998Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as RequiredBoric Acid
Shutdown Margin
ML20236H69330 June 1998Application for Amend to License NPF-58,transferring Operating Authority for Pnpp from Ceic & Centerior Svc Co to New Operating Company Named Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments,IncludedSafe Shutdown
L-98-127, LARs 256 & 126 to Licenses DPR-66 & NPF-73,modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements19 June 1998LARs 256 & 126 to Licenses DPR-66 & NPF-73,modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements
L-98-046, Application for Amends to Licenses DPR-66 & NPF-73,revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section17 March 1998Application for Amends to Licenses DPR-66 & NPF-73,revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section
L-98-028, Application for Amends to Licenses DPR-66 & NPF-73,exempting Neutron Flux Detectors from Channel Calibr Requirements16 March 1998Application for Amends to Licenses DPR-66 & NPF-73,exempting Neutron Flux Detectors from Channel Calibr Requirements
L-98-048, Application for Amends to Licenses DPR-66 & NPF-73,adding New LCO 3.0.6 to Section 3/4.0, Applicability16 March 1998Application for Amends to Licenses DPR-66 & NPF-73,adding New LCO 3.0.6 to Section 3/4.0, Applicability
L-98-016, Proposed LAR 120 to License NPF-73,allowing Increased Calculated Doses as Described in UFSAR & Request NRC Approval of Small Break Loss of Coolant Analysis Radiological Consequences Evaluation29 January 1998Proposed LAR 120 to License NPF-73,allowing Increased Calculated Doses as Described in UFSAR & Request NRC Approval of Small Break Loss of Coolant Analysis Radiological Consequences Evaluation
PY-CEI-NRR-2245, Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs23 December 1997Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for EdgsSafe Shutdown
Maintenance Rule Program
L-97-073, Application for Amend,Consisting of Proposed Change Requests 218 & 85,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors19 December 1997Application for Amend,Consisting of Proposed Change Requests 218 & 85,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors