MONTHYEARPY-CEI-NRR-2427, Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations1999-09-14014 September 1999 Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations PY-CEI-NRR-2406, Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl1999-09-0909 September 1999 Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl PY-CEI-NRR-2430, Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons1999-09-0909 September 1999 Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons PY-CEI-NRR-2420, Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4)1999-09-0909 September 1999 Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4) PY-CEI-NRR-2418, Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable1999-08-0404 August 1999 Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable PY-CEI-NRR-2398, Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp1999-06-17017 June 1999 Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp ML20206F5971999-05-0505 May 1999 Application for Amend to License NPF-58,authorizing CEI to Possess Dl 13.74% Undivided Ownership Interest in Pnpp PY-CEI-NRR-2362, Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl1999-03-17017 March 1999 Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl PY-CEI-NRR-2373, Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-11999-03-15015 March 1999 Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-1 PY-CEI-NRR-2359, Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld1999-01-18018 January 1999 Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld PY-CEI-NRR-2352, Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs1999-01-0606 January 1999 Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs PY-CEI-NRR-2325, Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld PY-CEI-NRR-2322, Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program1998-09-0909 September 1998 Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program PY-CEI-NRR-2319, Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 21998-09-0303 September 1998 Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 2 PY-CEI-NRR-2298, Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storag1998-09-0303 September 1998 Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storage Tank PY-CEI-NRR-2300, Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable1998-08-31031 August 1998 Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable PY-CEI-NRR-2299, Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld1998-07-22022 July 1998 Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld ML20151P1891998-07-13013 July 1998 Application for Amend to License NPF-58,revising Safety Setpoint Requirements for Srv.Proprietary Info & Affidavit Are Contained in Attachment 5.Proprietary Info Withheld PY-CEI-NRR-2295, Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required1998-06-30030 June 1998 Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required ML20236H6931998-06-30030 June 1998 Application for Amend to License NPF-58,transferring Operating Authority for Pnpp from Ceic & Centerior Svc Co to New Operating Company Named Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments,Included PY-CEI-NRR-2245, Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs1997-12-23023 December 1997 Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs PY-CEI-NRR-2230, Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers1997-10-22022 October 1997 Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers PY-CEI-NRR-2207, Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours1997-09-0808 September 1997 Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours PY-CEI-NRR-2206, Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.901997-08-28028 August 1997 Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 ML20217F5751997-07-28028 July 1997 Application for Amends to Licenses DPR-66,NPF-73 & NPF-58, Authorizing Holders to Possess Beaver Valley Power Station, Unit 1 & Authorizes Duquesne Light to Use & Operate Beaver Valley Unit 1 in Accordance W/Procedures PY-CEI-NRR-2164, Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys PY-CEI-NRR-2165, Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria PY-CEI-NRR-2155, Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks1997-04-0909 April 1997 Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks PY-CEI-NRR-2133, Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests1997-01-31031 January 1997 Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests ML20132C7601996-12-13013 December 1996 Application for Amend to License NPF-58,authorizing Transfers of Control PY-CEI-NRR-2104, Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.21996-10-24024 October 1996 Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.2 ML20117E7821996-08-27027 August 1996 Application for Amend to License NPF-58,revising MSL Leakage Requirements & Eliminating MSIV Leakage Control Sys. Attachment 7 Provides Proprietary Dose Calculations. Attachment 7 Withheld PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process1996-04-26026 April 1996 Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process PY-CEI-NRR-2030, Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses1996-02-27027 February 1996 Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses PY-CEI-NRR-2027, Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 61996-02-17017 February 1996 Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 PY-CEI-NRR-2007, Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing1996-01-16016 January 1996 Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing PY-CEI-NRR-2013, Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 9601271996-01-10010 January 1996 Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 ML20095L2181995-12-28028 December 1995 Suppl Application for License Transfer of 12.58% Ownership Interest in Addition to 17.42% Approved on 951220 PY-CEI-NRR-2004, Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc1995-11-22022 November 1995 Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc PY-CEI-NRR-1978, Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating1995-11-0202 November 1995 Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating PY-CEI-NRR-1995, Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations1995-11-0202 November 1995 Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations PY-CEI-NRR-1997, Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies1995-11-0101 November 1995 Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies PY-CEI-NRR-1969, Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L)1995-08-29029 August 1995 Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L) PY-CEI-NRR-1961, Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements1995-06-30030 June 1995 Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements PY-CEI-NRR-1954, Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request1995-06-0909 June 1995 Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request PY-CEI-NRR-1956, Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR1995-06-0101 June 1995 Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR PY-CEI-NRR-1944, Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification1995-05-0505 May 1995 Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification PY-CEI-NRR-1927, Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License1995-04-28028 April 1995 Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License PY-CEI-NRR-1655, Application for Amend to License NPF-58,adding New Programmatic Requirements Governing Radiological Effluents Into Administrative Controls Section of TS & Relocating Procedural Details of RETS to ODCM or Pcp,Per GL 89-011995-04-0303 April 1995 Application for Amend to License NPF-58,adding New Programmatic Requirements Governing Radiological Effluents Into Administrative Controls Section of TS & Relocating Procedural Details of RETS to ODCM or Pcp,Per GL 89-01 PY-CEI-NRR-1890, Application for Amend to License NPF-58 Re one-time Extension of Performance Intervals for Certain TS Surveillance Requirements1995-03-24024 March 1995 Application for Amend to License NPF-58 Re one-time Extension of Performance Intervals for Certain TS Surveillance Requirements 1999-09-09
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARPY-CEI-NRR-2427, Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations1999-09-14014 September 1999 Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations PY-CEI-NRR-2430, Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons1999-09-0909 September 1999 Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons PY-CEI-NRR-2406, Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl1999-09-0909 September 1999 Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl PY-CEI-NRR-2420, Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4)1999-09-0909 September 1999 Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4) PY-CEI-NRR-2418, Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable1999-08-0404 August 1999 Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable PY-CEI-NRR-2398, Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp1999-06-17017 June 1999 Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp ML20206F5971999-05-0505 May 1999 Application for Amend to License NPF-58,authorizing CEI to Possess Dl 13.74% Undivided Ownership Interest in Pnpp PY-CEI-NRR-2362, Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl1999-03-17017 March 1999 Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl PY-CEI-NRR-2373, Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-11999-03-15015 March 1999 Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-1 PY-CEI-NRR-2359, Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld1999-01-18018 January 1999 Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld PY-CEI-NRR-2352, Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs1999-01-0606 January 1999 Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs PY-CEI-NRR-2325, Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld PY-CEI-NRR-2322, Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program1998-09-0909 September 1998 Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program PY-CEI-NRR-2298, Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storag1998-09-0303 September 1998 Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storage Tank PY-CEI-NRR-2319, Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 21998-09-0303 September 1998 Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 2 PY-CEI-NRR-2300, Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable1998-08-31031 August 1998 Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable PY-CEI-NRR-2299, Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld1998-07-22022 July 1998 Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld ML20151P1891998-07-13013 July 1998 Application for Amend to License NPF-58,revising Safety Setpoint Requirements for Srv.Proprietary Info & Affidavit Are Contained in Attachment 5.Proprietary Info Withheld PY-CEI-NRR-2295, Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required1998-06-30030 June 1998 Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required ML20236H6931998-06-30030 June 1998 Application for Amend to License NPF-58,transferring Operating Authority for Pnpp from Ceic & Centerior Svc Co to New Operating Company Named Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments,Included PY-CEI-NRR-2245, Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs1997-12-23023 December 1997 Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs PY-CEI-NRR-2230, Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers1997-10-22022 October 1997 Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers PY-CEI-NRR-2207, Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours1997-09-0808 September 1997 Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours PY-CEI-NRR-2206, Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.901997-08-28028 August 1997 Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 ML20217F5751997-07-28028 July 1997 Application for Amends to Licenses DPR-66,NPF-73 & NPF-58, Authorizing Holders to Possess Beaver Valley Power Station, Unit 1 & Authorizes Duquesne Light to Use & Operate Beaver Valley Unit 1 in Accordance W/Procedures PY-CEI-NRR-2164, Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys PY-CEI-NRR-2165, Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria PY-CEI-NRR-2155, Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks1997-04-0909 April 1997 Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks PY-CEI-NRR-2133, Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests1997-01-31031 January 1997 Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests ML20132C7601996-12-13013 December 1996 Application for Amend to License NPF-58,authorizing Transfers of Control PY-CEI-NRR-2104, Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.21996-10-24024 October 1996 Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.2 ML20117E7821996-08-27027 August 1996 Application for Amend to License NPF-58,revising MSL Leakage Requirements & Eliminating MSIV Leakage Control Sys. Attachment 7 Provides Proprietary Dose Calculations. Attachment 7 Withheld PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process1996-04-26026 April 1996 Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process PY-CEI-NRR-2030, Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses1996-02-27027 February 1996 Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses PY-CEI-NRR-2027, Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 61996-02-17017 February 1996 Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 PY-CEI-NRR-2007, Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing1996-01-16016 January 1996 Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing PY-CEI-NRR-2013, Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 9601271996-01-10010 January 1996 Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 ML20095L2181995-12-28028 December 1995 Suppl Application for License Transfer of 12.58% Ownership Interest in Addition to 17.42% Approved on 951220 PY-CEI-NRR-2004, Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc1995-11-22022 November 1995 Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc PY-CEI-NRR-1978, Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating1995-11-0202 November 1995 Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating PY-CEI-NRR-1995, Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations1995-11-0202 November 1995 Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations PY-CEI-NRR-1997, Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies1995-11-0101 November 1995 Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies PY-CEI-NRR-1969, Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L)1995-08-29029 August 1995 Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L) PY-CEI-NRR-1961, Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements1995-06-30030 June 1995 Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements PY-CEI-NRR-1954, Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request1995-06-0909 June 1995 Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request PY-CEI-NRR-1956, Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR1995-06-0101 June 1995 Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR PY-CEI-NRR-1944, Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification1995-05-0505 May 1995 Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification PY-CEI-NRR-1927, Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License1995-04-28028 April 1995 Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License PY-CEI-NRR-1655, Application for Amend to License NPF-58,adding New Programmatic Requirements Governing Radiological Effluents Into Administrative Controls Section of TS & Relocating Procedural Details of RETS to ODCM or Pcp,Per GL 89-011995-04-0303 April 1995 Application for Amend to License NPF-58,adding New Programmatic Requirements Governing Radiological Effluents Into Administrative Controls Section of TS & Relocating Procedural Details of RETS to ODCM or Pcp,Per GL 89-01 PY-CEI-NRR-1890, Application for Amend to License NPF-58 Re one-time Extension of Performance Intervals for Certain TS Surveillance Requirements1995-03-24024 March 1995 Application for Amend to License NPF-58 Re one-time Extension of Performance Intervals for Certain TS Surveillance Requirements 1999-09-09
[Table view] |
Text
_ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _
Peny thclear Power Plant P x9 Perry,Ohc44081 Lew W. Nyere 440 280 5915 Mce Premdent Far 440u280-8029 July 13,1998 PY-CEl/NRR-2298L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License Amendment Request Pursuant to 10CFR50.90: Modification of the Safety Setpoint Requirements for the Safety Relief Valves Ladies and Gentlemen:
Nuclear Regulatory Commission review and approval of a license amendment for the Perry Nuclear Power Plant (PNPP) is requested pursuant to 10CFR50.90. The proposed license amendment request increases the present il% tolerance on the safety mode lift .
setpoint for the safety / relief valves (SRVs) to i3%. This change has been approved by the NRC staff on a generic basis as documented in NEDC-31753-P-A SER Attachment 1 provides the Summary, a Description of the Proposed Technical Specification Change, a Safety Analysis, and an Environmental Co,nsideration.
Attachment 2 provides the Significant Hazards Consideration. Attachment 3 provides the annotated Technical Specification page reflecting the proposed change. The annotated
- Bases pages in Attachment 4 are provided for infonnation only since the Bases are not a formal part of the Technical Specifications. Attachment 5 provides details of the plant specific analysis NEDC-32307P, " Safety Review for Perry Nuclear Power Plant Safety / Relief Valve Setpoint Tolerance Relaxation / Out-of-Service Analyses." This report is considered by General Electric (GE) to be proprietary information and an affidavit from GE to that effect is provided. Pursuant to 10CFR2.790 it is requested that the information contained in Attachment 5 be withheld from public disclosure.
1 9807160316 PDR -ADOCK 05000440,"
900713
.. )
PY-CEI/NRR-2298L July 13,1998 Page 2 of 2 ,
l If you have questions or require additional information, please contact Mr. Hemy L.
Hegrat, Manager - Regulatory Affairs, at (440) 280-5606.
l Very truly yours, i M
Attachments (Attachment 5 contains 10CFR2.790 ;
information. Upon removal of I cc: NRC Project Manager Attachment 5, the remainder of this J NRC ResidentInspector package may be disclosed.) '
NRC RegionIII State ofOhio l
1
)
l l
l 1
\
i e
. _ _ . _ . . _ _ . _ _ _ . . - - _ ___ _ _ _ _ _ _ . . _ _ _. m._ _
l .
1
~
I j
t l
1, Lew W. Myers, being duly sworn state that (1) I am Vice President - Nuclear, of the Centerior Service Comeany, (2) I am duly authorized to execute and file this certification on behalf of The Cleveland Electric Illuminating Company and Toledo Edison Company, and as the duly authorized agent for Duquesne Light Company, Ohio l
Edison Company, and Pennsylvania Power Company, and (3) the statements set forth herein are true and correct to the best of my knowledge, information and belief.
i
/ Y Lew W. Mfers[
Sworn to and subscribed before me, the /3 day of Olm- ,/997
/ !
r_ Au f
~
' .r-17'JAUk'E MOTT
' Notary PetWic, St.cto cf Ohio WCommission Empires Feb.20.2000 N thint.akeCounty) _w........
f
Attachment 1 PY-CEI/NRR-2298L Page 1 of 10
SUMMARY
The Boiling Water Reactor Owners Group, with the assistance of General Electric, submitted Licensing Topical Report (LTR) NEDC-31753P, "BWROG In-Service Pressure Relief Technical Specification Revision Licensing Topical Report," for Nuclear Regulatory Commission (NRC) review and approval (Reference 1). The LTR provided justification for the relaxation of safety / relief valve (SRV) safety mode (spring mode) lift setpoint tolerance from 1% to i3%. The NRC determined in its corresponding Safety Evaluation Report (NEDC-31753-P-A SER) that it was acceptable for licensees to submit Technical Specification amendment requests to revise lift setting tolerances to i3%
provided that the setpoints, for those SRVs tested, were restored to il% (Reference 2).
The NRC SER instructed licensees implementing the Technical Specification modifications to provide plant specific analyses confirming the acceptability for revising lift setting tolerances to i3%. These plant specific analyses and evaluations are summarized below and documented in NEDC-32307P " Safety Review for Perry Nuclear l Power Plant Safety / Relief Valve Setpoint Tolerance Relaxation /Out-of-Service Analyses," dated May 1994 (Reference 3 and Attachment 5).
It is estimated that this change will save the Perry Nuclear Power Plant (PNPP) approximately $8.6 million over the remaining life of the plant. In addition, the proposed
! change will reduce personnel radiation exposure resulting from valve refurbishment and will eliminate additional testing which has no impact on plant safety. We request NRC Staff review and approval of this proposed license amendment by December 31,1998 in order to support procedure changes necessary to implement this Amendment for the next l refueling outage (RFO7) scheduled to start April 10,1999.
l !
The proposed license amendment request is similar to amendments previously approved .
by the NRC Staff for the James A. Fitzpatrick Nuclear Power Plant in an SER dated I September 28,1994; for LaSalle County Station, Unit 1 in an SER dated January 3,1996, ;
and for Grand Gulf Nuclear Station in an SER dated June 12,1996.
l l Appropriate Updated Safety Analysis Report (USAR) changes will be completed to j describe the change made to increase the SRV safety mode setpoint tolerance to i3%. It should be noted that no changes are being proposed to the current opening setpoin'ts for ,
the SRVs in their relief mode (pneumatic mode) of operation.
l
v- .
i Attachment 1 PY-CEI/NRR-2298L I
Page 2 of10 l
1 DESCRIPTION OF THE PROPOSED TECHNICAL SPECIFICATION CHANGE '!
s
- 'Ihis proposed change increases the present il% tolerance on the safety mode lift setpoint for the SRVs to i3%. Specifically, Surveillance Requirement (SR) 3.4.4.1 is being modified to revise the lift setpoints to reflect:
4 l
} Setpoint )
D2iliE) i 1165 t 34.9 L 1180 i 35.4 j
, 1190 i 35.7 1 ne annotated page for the proposed change to SR 3.4.4.1 is provided in Attachment 3.
Additionally, associated Bases changes are included in Attachment 4 for information only, since Bases are not a formal part of the Technical Specifications (Bases changes are processed per the Technical Specification Bases Control Program, Specification 5.5.11).
i
!- SAFETY ANALYSIS 1
The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel l
. Code requires the reactor pressure vessel be protected from overpressure during upset l i conditions by self actuated safety valves.' As part of the nuclear pressure relief system, j '
- the size and number of SRVs are selected such that peak pressure in the nuclear system f will not exceed the ASME Code limits for the reactor coolant pressure boundary. The
- SRV setpoints are established to ensure the ASME Code limit on peak reactor pressure is L satisfied. The ASME Code specifications require the lowest safety valve be set at or
! below vessel design pressure (1250 psig) and the highest safety velve be set so the total accumulated pressure does not exceed 110% of the design pressure (1375 psig - also .
1
- , referred to as the " upset limit"). The overpressure transient evaluation in USAR Chapter 15 is based on these setpoints and includes additional uncertainties of i1% of the nominal setpoint to account for potential setpoint drifL his provides an additional
+
degree of conservatism.
I The LTR NEDC-31753P providedjustification for the relaxation of'SRV safety mode lift setpoint tolerance from i1% to i3% as denoted in SR 3.4.4.1. The NRC determined in its corresponding Safety Evaluation Report that each licensee choosing to implement the c SRV setpoint tolerances should provide a plant specific analysis that includes the ;
- following
i
- i a
Attachment 1 PY-CEI/NRR-2295L Page 3 of 10
- 1) Transient analysis, using NRC approved methods, of the abnormal operationrl occurrences as described in NEDC-31753P, should be performed utilizing a 3% ,
setpoint tolerance for the safety mode of the SRVs. i l
- 2) Analysis of the design basis overpressurization event using the 3% tolerance limit l for the SRV setpoint is required to confirm that the vessel pressure does not exceed the ASME pressure vessel code upset limit.
[
- 3) The plant specific analyses described in Items 1 and 2 should assure sat the number of SRVs included in the analyses corresponds to the number of valves required to be operable in the Technical Specifications.
i l
! 4) Re-evaluation of the performance of high pressure systeras (parp capacity, 1 l discharge pressure, etc.), motor-operated valves, and vessel instmmentation and I associated piping must be completed, considering the 5% tolerance limit.
- 5) Evaluation of the i3% tolerance on any plant specific altennte operating modes j (e.g., increased core flow, extended operating domtin, etc.) should be completed. )
l
- 6) Evaluation of the effect of the 3% tolerance limit on the contzinment response during loss cf coolant accidents and the hydrodynamic loads on the SRV l
discharge lines and containment should be cotripleted. j 1
l l The plant specific analyses and evaluation requested above have been completed and are ;
l provided in Attachment 5. Since this is considered a prorrdetary document, a sununary of !
results is provided below. In addition ta the analyses in Attachment 5 (portions of which i l
used PNPP Cycle 5 information), the following sununny also notes de applicable results of the current Cycle 7 analyses.
L TRANSIENT ANALYSIS i l Limiting transient events for PNPP Cycle 5 were evaluated (Reference 3) to determine l whether the increase in SRV safety (spring) mode setpoint tolerance from 1 % to i3 % ;
would be acceptable. The Cycle 5 evalua". ion idmtified the Misoriented Bundle event as )
L the most limiting event for the operatinFfimit udnimum critical power rcrio (MCPR). i l The proposed change to the SRV tolerances dacs not affect the MCPR calculation for the l Misoriented Bundle event since there is no SRV actuation in the sequence of events. The evaluation of ACPR also included set eral pressurization transient events (i.e., events in !
which the SRVs actuate) such as the Genemtor Lord Rejection with no Bypass and the j Feedwater Controller Failure. These prenurization events were not affected since credit !
is taken for SRV operation in the r elief raode (pneumatically opened mode of SRV i
^
operation), thus, MCPR is not dependent on the SRV safety mode of opemtion. Also, the safety mode setpoint relaxation is not a factor since the SRVs open after the occmrence of l
Attachment 1
- PY-CEI/NRR-2298L Page 4 of10 -
MCPR during transients. Therefore, the change in the safety mode setpoint does not affect these transient results.
I A review of the current Cycle 7 results (USAR 15B.15) identified the Load Reject without Bypass event as the most limiting event for the operating limit MCPR. The proposed change to the SRV tolerances does not affect the MCPR calculation for the Load Reject without Bypass event since there is no impact on MCPR once the reactor scran has occurred. The limiting MCPR occurs prior to the opening of any SRV, and thus the limiting MCPR is not affected.
- 2. OVERPRESSURE PROTECTION ANALYSIS The ASME Code requires the peak vessel pressure to remain less than the upset limit of 1375 psig during the limiting overpressure event. For PNPP, this is a Main Steam Isolation Vnive (MSIV) closure followed by reactor scram on high neutron flux (i.e.,
failure of the direct scram associated with MSIV closure).
An analysi!: was performed for this event (Reference 3 - Cycle 5 inputs) assuming only 13 of the 19 SRVs installed at PNPP function. The analysis assumed a setpoint tolerance ofi3%, and a 102% power and 105% flow condition with centervative end-of-cycle nuclear dynamic parameters. This analysis ensures the operability requirements of LCO 3.4.4, " Safety / Relief Valves (S/RVs)" are appropriate. For Cycle 5, the peak main I
steamline pressure was 1264 psig and the peak vessel bottom pressure was 1294 prig. 3 I
A review of Cycle 7 results (USAR 15B.5.2.2), which also included the t.3% safecy mode setpoint tolerance, identified the peak main steamline pressure as 1258 psig and the peak vessel bottc m presstrie as 1229 psig. These pressures provide significant margins to the ASME Code upset 'dmit of 1375 psig. Therefore, PNPP satisfies the ASME limit with a i3% SRV s etpoint tolerance using only 13 SRVs. Since the overpressure protection analysis is t:ycle-specific, the peak vessel pressure is demonstrated every operating cycle l to remain b: low te ASME criteria for overpresmre protection.
1 am l
'/
l
+
, l l
l l
1
Attachment 1 PY-CEI/NRR-2298L Page 5 of10
- 3. NUMBER OF SRVs USED IN ANALYSIS l
The overpressure protection analysis, described in item 2 above, assumes only the l Technical Specification required 13 SRVs are functioning. This is consistent with the Bases for LCO 3.4.4," Safety / Relief Valves (S/RVs)." The Technical Specification i requirements are based on this overpressure protection analysis, not the transient analysis described in Item 1. The plant specific transient analyses, described in Item I above for i the abnormal operational occurrences, assume that 17 out of 19 SRVs are functioning (USAR 15B.0.1).
- 4. HIGH PRESSURE SYSTEMS The impact of the increased setpoint tolerance on the safety functions of the High Pressure Core Spray (HPCS) System, the Reactor Core Isolation Cooling (RCIC) System, and the Standby Liquid Control System (SLCS) was evaluated. The most significant impact is the increased reactor pressure specified for operation. Note that the proposed change does not affect the relief mode setpoints, which remain at:
Setpoint (DSid 1103i!5 (1 valve)
- 3. I'll3 il5 (9 valves) 1123 i 15 (9 valves)
High Pressure Core Spray System The HPCS System is designed to deliver water to the reactor vessel at 2 517 gpm, with the rentor vessel pressure 1177 psig (1165 + 11.6 psig) above the pressure at the source of su:: tion. The increase in SRV setpoint tolerance increases the maximum reactor 3 pressure for HPCS System injection to 1200 psig (1165 + 34.9 psig). A review of the pmnp perfonnance curves indicates that the HPCS System has sufficient margin to deliver flow in excess of 517 gpm at 1200 psig. The HPCS pump design has a discharge rating of 1575 psig. This pressure is well above the pressures which may result from SRV safety mode setpoint tolerance relaxation. Therefore, the increase in SRV setpoint tolerance has been determined to be acceptable for the HPCS Sys+ein.
1 I
8 i
J Attachment 1 PY-CEI/NRR '_298L Page 6 of 10
- Reactor Core Isolation Cooling System l
The design requirements for the RCIC System, including the RCIC turbine, is to deliver 700 gpm in the reactor pressure range of 150 to 1177 psig. The increase in SRV setpoint mode tolerance requires the RCIC System to deliver 700 gpm in the reactor pressure range of 150 to 1200 psig. A review of the pump performance curves indicates that the RCIC System has sufficient margin to deliver flow in excess of 725 gpm at 1200 psig.
The RCIC pump design has a discharge rating of 1575 psig. This pressure is well above the pressures which may result from SRV safety mode setpoint tolerance relaxation.
- Therefore, the increase in SRV setpoint tolerance has been determined to be acceptable
! for the RCIC System.
- I l A review of the RCIC turbine performance curves indicates that the turbine has the capacity to develop the horsepower and speed required by the pump for the increased pressure conditions. The turbine speed must be raised from 4550 rpm to 4600 rpm. This l is below the maximum permitted turbine shaft speed of approximately 5000 rpm. The l increased turbine rated speed reduces the overspeed trip margin from 125% to 122.3%. l However, this reduction in margin was found to be acceptable in accordance with the GE l Service Information Letter No. 377. The steam flow increase to drive the turbine to a !
l higher speed is less than 2%. This steam flow increase and a small increase in turbine exhaust pressure are not expected to have any adverse impact to the design life and j performance of the turbine system. The design pressure of the RCIC System steam !
supply lines and turbine was based on the reactor design pressure of 1250 psig. This pressure is above the pressures which may result from SRV safety mode setpoint tolerance relaxation. Therefore, the increase in SRV setpoint tolerance has been determined to be acceptable for the RCIC System.
Standby Liquid Control System The SLCS was evaluated in Refert nce 3 based on the SRV safety mode settings.
However, SLCS operation is not affected by the SRV setpoint tolerance increase. The pressure used for system performance is based on the SRV relief settings of the system, not the SRV safety settings. This proposed change does not affect the relief settings of the SRVs.
Other Components (MOVs, Associated Piping)
The minimum design pressure of the piping, valves and components which are part of the primary reactor coolant pressure boundary is 1250 psig. Since the design pressure is l higher than the lowest opening pressure of the SRV safety mode at 1200 psig, an increase in SRV setpoint tolerance has been determined to be acceptable.
i
Attachment 1 PY-CEI/NRR-2298L Page 7 of10
- 5. ALTERNATE OPERATING MODES The alternate operating modes, including Maximum Extended Operating Domain (MEOD), Increased Core Flow Region, and Single Loop Operation (SLO) were considered in determining the most restrictive analytical conditions (i.e., the most limiting operating mode) for performing the analyses associated with this proposed Technical Specification change (see Items 1 and 2, above).
- 6. LOSS OF COOLANT ACCIDENT (LOCA) PERFORMANCE LOCA The LOCA analysis was reviewed to detet iine the effect of an increase in SRV setpoint tolerance on ECCS perforwe. The ECCS is designed to maintain fuel integrity, during postulated LOCAs, below 10CFR50.46 limits. A change in SRV opening pressure can only affect the containment pressure response for LOCAs in which SRV actuations occur. No SRV actuation occurs for large pipe breaks inside the containment because the vessel depressurizes through the break. Therefore, an increase in SRV opening pressure will not affect the results of the design basis accident (DBA) LOCA evaluated in the USAR. For a double-ended guillotine break of one main steamline outside the containment, the reactor vessel is isolated upon closure of the MSIVs. The peak pressure of this accident is bounded by the overpressure protection event. In addition,10CFR50.46 calculations of peak clad temperatures for this event and for small-break LOCAs are insensitive to SRV actuation. For small break LOCAs, the SRVs are armed with low-low set logic (LLS) allowing the relief mode of 6 SRVs to relieve reactor pressure to below 1000 psig. Once the logic is initiated, the opening and closing setpoints of these SRVs are automatically reset to lower values by the LLS logic. This logic is not affected by the setpoint tolerance change since it acts on the relief mode of SRV actuation and not on the safety mode of operation. Consequently, since PNPP is a LLS plant, the peak pressure effect from the SRV setpoint relaxation on a small break LOCA event is negligible.
Containment Response The most limiting LOCA event in terms of peak containment pressure, temperature and peak suppression pool temperature is a DBA LOCA. Relaxation of'the SRV setpoint tolerance has no effect on this limiting event because the vessel depressurizes without any SRV actuation.
i l
Attachment 1 PY-CEI/NRR-2298L Page 8 of10 LOCA-Related Hydrodynamic Loads The LOCA hydrodynamic loads, such as pool swell, condensation oscillation and chugging, are all dependent on peak containment responses during a DBA LOCA and therefore are not affected by the increase in the SRV safety mode setpoint tolerances. ,
SRV Discharged Loads Steam discharged firom the SRVs is routed through the SRV discharge lines and through the quencher into the suppression pool. Actuation of SRVs introduces high pressure steam which quickly pressurizes the discharge piping resultirig in forced expulsion of the water as well as air initially in the piping. The SRV loads resulting from SRV actuation includes thrust loads, air-clearing loadr, reaction loads, and air bubble loads impacting SRV piping, piping anchors, quenchers, and submerged structures (USAR Appendix 3B).
An increase of the SRV setpoint tolerance will result in a corresponding increase in discharge flow rate into the discharge piping. At 1%, the max.imum pressure setting can be as high as 1202 psig. At 3%, the maximum pressure setting can be as high as 1226 )
- psig. The max'unum increase is only 24 psig or about 2 %. The effect of SRV discharged loads from the SRV safety mode setting tolerance increase can be evaluated as follows:
- SRV Discharge Piping to the First Anchor - The original loads for this portion of piping were generically derived for all BWR/6 plants and were based on worst case input conditions. The resultant SRV load was developed using an SRV flow rate input higher than the maximum expected SRV flow rate (with 3% setpoint tolerance) for PNPP. As indicated in USAR Table 3.9.3 (k), the resultant stresses for this portion of SRV piping show large safety margins in excess of 40%.
- Quencher Loads - PNPP uses the standard GE X-quencher design. The generic -
loads defined for the original quencher loading design were very conservative and therefore were determined to be unaffected by the increase in SRV setpoint tolerance, e Submerged Structure and Pool Boundary Loads - The loads on the submerged structures are based on the peak air bubble pressures determined with the generic X-quencher methodology. The correlation which was used to determine the increase in the SRV generic peak bubble pressure due to the increase in the SRV discharge flow rate was determined to be very conservative.'Therefore there is no effect on the submerged structures load definition.
i I
Attachment 1 PY-CEI/NRR-2298L Page 9 of10 ATWS Mitigation Capability An Anticipated Transient Without Scram (ATWS)is a beyond design basis event. The potential impact of the SRV tolerance setpoint relaxation on ATWS performance is the compliance to vessel overpressure criteria of 1500 psig. The limiting event for this ATWS condition is the MSIV closure transient (assumes that a reactor scram does not occur on a reactor protection system signal). For this event, the initial reduction of power occurs from the ATWS high dome pressure recirculation pump trip, accompanied by the boron injection from the SLCS. This leads to an eventual reactor shutdown. During this transient, SRVs actuated accordingly. An analysis was performed with the reactor at 100% power and 100% recirculation flow. Assuming 2 SRVs failed to open on demand, the peak reactor vessel bottom pressure was calculated to be 1344 psig. This is significantly less than the acceptance limit, which is the ASME service level C (Emergency) value of 1500 psig. Therefore, the setpoint tolerance relaxation on the safety mode lift setpoint does not adversely impact the results of any ATWS event.
- 7. CONCLUSION The analyses and evaluations support the relaxation of the as-found SRV safety mode lift setpoint tolerance from the current il% w i3%. The analyses and evaluations summarized above have no significant safety impact on ECCS/LOCA performance, high pressure system performance, containment structural integrity, and ATWS analysis results. The analyses examined cycle dependent safety concerns, such as vessel overpressure margin and thermal limits, and demonstrated that the SRV safety mode tolerance combined with 2 SRVs out-of-service has no adverse impact upon plant safety for transient events. In addition, there is no adverse impact upon plant safety with 6 SRVs out-of-service for the vessel overpressure analysis. Future cycle-specific reload licensing evaluations verify continued applicability of the results from this analysis.
Attachment 1 PY-CEI/NRR-2298L Page 10 of10
- 8. REFERENCES
- 1. NEDC-31753P, "BWROG In-Service Pressure Relief Technical Specification Revision Licensing Topical Report," GE Nuclear Energy, dated February 1990.
- 2. NRC letter (NEDC-31753-P-A SER) from A.S. Thadani to C.L. Tully, Chairperson, BWR Owners' Group, " Acceptance for Referencing of Licensing Topical Report NEDC-31753P," dated March 8,1993.
- 3. NEDC-32307P, " Safety Review for Perry Nuclear Power Plant Safety / Relief Valve Setpoint Tolerance Relaxation / Out-of-Service Analyses," GE Nuclear Energy, dated May 1994.
ENVIRONMENTAL CONSIDERATION The proposed Technical Specification change request was evaluated against the criteria of 10CFR51.22 for environmental considerations. The proposed change does not significantly increase individual or cumulative occupational radiation exposures, does not significantly change the types or significantly increase the amount of effluents that may be released off site and, as discussed in Attachment 2, does not involve a significant hazards consideration. Based on the foregoing, it has been concluded that the proposed Technical Specification change meets the criteria given in 10CFR51.22(c)(9) for categorical exclusion from the requirement for an Environmental Impact Statement.
COMMITMENTS WITHIN THIS LETTER The following table identifies those actions which are considered to be regulatory commitments. Any other actions discussed in this document represent current or planned actions and are described for the NRC's information. Please notify the Manaiger -
Regulatory Affairs at the Perry Nuclear Power Plant of any questions regarding this document or any associated regulatory commitments.
Commitments ,
Appropriate Updated Safety Analysis Report (USAR) changes will be completed to describe the change made to increase the SRV safety mode setpoint tolerance to 3%.
1
Attachment 2
- PY-CEI/NRR-2298L Page 1 of2 i
SIGNIFICANT HAZARDS CONSIDERATION L
The standards used to arrive at a determination that a request for amendment involves no significant hazards considerations are included in the Commission's Regulation, 10CFR50.92, which states that the operation of the facility in accordance with the proposed amendment would not: (1) involve a significant increase in the probability or i
consequences of an accident previously evaluated; or (2) create the possibility of a new or
- different kind of accident from any accident previously evaluated; or (3) involve a l significant reduction in a margin of safety.
1 The proposed amendment has been reviewed with respect to these three factors and it has i bsen determined that the proposed change does not involve a significant hazard because:
$ (1) The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
l T!a proposed change allows an increase in the as-found safety relief valve (SRV) safety mode setpoint tolerance, determined by test aAer the valves have been
, removed from service, from il% to i3%. The proposed change does not alter the Technical Specification requirements on the nominal SRV safety mode liA i-setpoints, the SRV relief mode setpoints, the required frequency for the SRV lift setpoint tests, or the number of SRVs required to be operable. This change does
- l. not involve physical changes to the SRVs, nor does it change the operating '
characteristics or safety function of the SRVs.
1 i Consistent with current requirements, this change continues to require that the
! SRVs be adjusted to within i1% of their nominal lift setpoints following testing.
i This change does not change the behavior and operation of any SRV and therefore
'. has no significant impact to reactor operation. It also has no significant impact on
' response to any perturbation of reactor operation including transients and accidents previously anFt 7 the Updated Safety Analysis Report. In addition, J this change does not change ? V actuation. Therefore, this change will not increase the probability of an accident previously evaluated.
1 Generic considerations related to the change in setpoint tolerance were addressed 1 in NEDC-31753P, "BWROG In-Service Pressure Relief Technical Specification i Revision Licensing Topical Report," and were reviewed and approved by the NRC. 'Ihe plant specific evaluations, required by the NRC's Safety Evaluation )
for NEDC-31753P and performed to support this proposed change, are contained i 1
in NEDC-32307P, " Safety Review for PNPP Safety / Relief Valve Setpohnt Tolerance Relaxation / Out-of-Service Analyses," dated May 1994. These l analyses and evaluations show that there is adequate margin to the design core I thermal limits and to the reactor vessel pressure limits using a 13% SRV setpoint 1
L Attachment 2
- PY-CEI/NRR-2298L Page 2 of2 tolerance. They also show that operation of the high pressure injection systems L
will not be adversely affected;' and the containment response from a loss of coolant accident will be acceptable.
Therefore, this change will not involve a significant increase in the probability or consequences of any accident previously evaluated.
(2) The proposed change would not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed change te allow an increase in the SRV safety mode setpoint tolerance from il% to i3% does not alter the nominal SRV lift setpoints or the number of SRVs required to be operable. This change does not involve physical changes to the SRVs, nor does it change the operating characteristics or the safety l function of the SRVs. The proposed change does not involve a physical alteration of the plant. No new or different equipment is being installed. The proposed j change does not impact core reactivity nor the manipulation of fuel bundles.
There is no alteration to the parameters within which the plant is normally operated. As a result no new failure modes are being introduced. There are no changes in the methods governing wrmal plant operation, nor are the methods utilized to respond to plant transients altered.
I l
Therefom, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
(3) The proposed change will not involve a significant reduction in the margin of l safety.
! 4 l
l The margin of safety is established through the design of the plant structures,
- systems, and components, the parameters within which the plant is operated, and the establishment of the setpoints for the actuation of equipment relied upan to
- respond to an event. The proposed change does not significantly impact the- )
l condition or performance of structures, systems, and components relied upon for accident mitigation. The proposed change does not significantly impact any j safety analysis assumptions or results.
Therefore, the proposed change does not involve a significant reduction in a ,
margin ofsafety.
Based on the above considerations, it is concluded that a significant hazard would not be introduced as a result of this proposed change. Also, since NRC approval of this change must be obtained prior to implementation, no unreviewed safety question can exist.