Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21271A2003 August 2021License Amendment Request (LAR) 21-01, Chapter 3 14 Backfill Attachment Final CAC 2
ML21271A1742 March 2017License Amendment Request (LAR) 21-01, Chapter 2 20 Storm Water Discharge Authorization Permit Renewal NER910677 Package for FCS cac2
ML16182A3614 August 2016Staff Review of Spend Fuel Pool Evaluation Associated with Reevaluation Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1Safe Shutdown Earthquake
Fukushima Dai-Ichi
LIC-16-0031, Ft. Calhoun, Unit 1 - Annual Report for 2015 Loss-of-Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.4628 April 2016Ft. Calhoun, Unit 1 - Annual Report for 2015 Loss-of-Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46
LIC-16-0013, Ft. Calhoun, Unit 1 and ISFSI - Transmittal of 10CFR72.48 Evaluation Summary Report for January 1, 2015 Through December 31, 201510 February 2016Ft. Calhoun, Unit 1 and ISFSI - Transmittal of 10CFR72.48 Evaluation Summary Report for January 1, 2015 Through December 31, 2015
LIC-15-0005, (Fcs), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2013 Through December 31, 201415 January 2015(Fcs), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2013 Through December 31, 2014
ML14226A55114 August 2014Revision of Standard Practice Procedures Plan for Fort Calhoun Station, Unit 1
ML14157A07924 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Fukushima Dai-Ichi Nuclear Power Plant AccidentSafe Shutdown
Unanalyzed Condition
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
ML14105A37322 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
LIC-14-0047, Omaha Public Power District - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushi31 March 2014Omaha Public Power District - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the FukushimaSafe Shutdown
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML13172A34319 June 2013Integrated Performance Improvement Plan, Revision 5, Page 138 Through EndFire Barrier
Met Tower
Temporary Modification
Significance Determination Process
B.5.b Mitigating Strategies
Power change
LIC-13-0086, Integrated Performance Improvement Plan, Revision 5, Cover Through Page 7319 June 2013Integrated Performance Improvement Plan, Revision 5, Cover Through Page 73Fire Barrier
Probabilistic Risk Assessment
ML13172A34219 June 2013Integrated Performance Improvement Plan, Revision 5, Page 74 Through Page 137Met Tower
Temporary Modification
ML12340A25427 November 2012OPPD 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. Part 2 of 3Safe Shutdown
Unanalyzed Condition
Boric Acid
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Code Reconciliation
Earthquake
Scaffolding
ML12340A25527 November 2012OPPD 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. Part 2 of 3Boric Acid
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Scaffolding
LIC-12-0098, Integrated Performance Improvement Plan, Rev. 39 July 2012Integrated Performance Improvement Plan, Rev. 3Ultimate heat sink
Fire Barrier
Fire impairment
Met Tower
Temporary Modification
Significance Determination Process
B.5.b Mitigating Strategies
ML11276A12028 September 2011Enclosure 1 to LIC-11-0099, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)Safe Shutdown
Boric Acid
Shutdown Margin
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Fire impairment
Operator Manual Action
NFPA 805
Multiple Spurious Operation
Emergency Lighting
Large early release frequency
Time Critical Operator Action
Hemyc
B.5.b Mitigating Strategies
Exemption Request
Earthquake
Fuel cladding
Fire Protection Program
Fire Watch
Scaffolding
LIC-11-0099, Table B-2 Nuclear Safety Capability Assessment Methodology Review28 September 2011Table B-2 Nuclear Safety Capability Assessment Methodology ReviewHot Short
Safe Shutdown
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Operator Manual Action
Emergency Lighting
B.5.b
Thermoset
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Scaffolding
LIC-11-0090, Post-Flooding Recovery Action Plan10 August 2011Post-Flooding Recovery Action PlanBoric Acid
Packing leak
Fire Barrier
Coatings
Fire impairment
Met Tower
Temporary Modification
B.5.b Mitigating Strategies
Scaffolding
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
LIC-08-0120, Steam Generator Eddy Current Test Report - 2008 Refueling Outage9 December 2008Steam Generator Eddy Current Test Report - 2008 Refueling OutageNondestructive Examination
LIC-08-0107, Notice of Completion of Corrective Actions Taken in Response to Generic Letter 2004-02 and Response to Request for Additional Information16 October 2008Notice of Completion of Corrective Actions Taken in Response to Generic Letter 2004-02 and Response to Request for Additional InformationMission time
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Temporary Modification
Finite Element Analysis
LIC-08-0071, Transmittal of Fort Calhoun, Unit 1, Reactor Coolant System Pressure and Temperature Limits Report, Revision 427 May 2008Transmittal of Fort Calhoun, Unit 1, Reactor Coolant System Pressure and Temperature Limits Report, Revision 4Hydrostatic
Pressure and Temperature Limits Report
LIC-07-0017, Fitness-for-Duty Program Performance Data Report for July 1 Through December 31, 200622 February 2007Fitness-for-Duty Program Performance Data Report for July 1 Through December 31, 2006Fitness for Duty
LIC-06-0138, Transmittal of Revision 3 of Fort Calhoun Station, Unit No. 1 (Fcs), Pressure Temperature Limits Report (PTLR)29 November 2006Transmittal of Revision 3 of Fort Calhoun Station, Unit No. 1 (Fcs), Pressure Temperature Limits Report (PTLR)Hydrostatic
Pressure and Temperature Limits Report
LIC-06-0083, Fitness-for-Duty Program Performance Report26 July 2006Fitness-for-Duty Program Performance ReportFitness for Duty
LIC-06-0056, Request for Exemption from Nuhoms Certificate of Compliance No. 1004, Amendment No. 89 June 2006Request for Exemption from Nuhoms Certificate of Compliance No. 1004, Amendment No. 8Tornado Missile
Tornado Generated Missile
Design basis earthquake
Exemption Request
Fuel cladding
ML0606501776 March 2006Licensed Operator Positive Drug Tests
ML0535403195 December 200551-9004805-001, FCS RSG - Afas Verification - RAI Responses.Fuel cladding
LIC-05-0043, Supplemental Information for Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors15 April 2005Supplemental Information for Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water ReactorsFinite Element Analysis
LIC-05-0016, Omaha Public Power District, Fitness-for-Duty Program Performance Data Report4 February 2005Omaha Public Power District, Fitness-for-Duty Program Performance Data ReportFitness for Duty
ML07270084931 January 2005Caldon Experience in Nuclear Feedwater Flow MeasurementPower change
LIC-06-0004, Attachment 1, Engineering Analysis (EA-FC-04-010) Recommendations for Implementing of Compensatory Actions in Response to NRC Bulletin 2003-0123 November 2004Attachment 1, Engineering Analysis (EA-FC-04-010) Recommendations for Implementing of Compensatory Actions in Response to NRC Bulletin 2003-01Safe Shutdown
Boric Acid
Shutdown Margin
Time to boil
Severe Accident Management Guideline
LIC-04-0081, Fitness-for-Duty Program Performance Data Report for Six Month Period from January 1 Through June 30, 200414 July 2004Fitness-for-Duty Program Performance Data Report for Six Month Period from January 1 Through June 30, 2004Fitness for Duty
ML05322046114 June 2004Power Reactor Status Report for 6/14/04
ML0626304081 March 2004PSEG Nuclear, LLC Salem/Hope Creek Safety Culture AssessmentBoric Acid
Stroke time
Scaffolding
LIC-03-0154, Relief Request Pertaining to Reactor Vessel Nozzle Inspection for Third 10-Year Interval Revision21 November 2003Relief Request Pertaining to Reactor Vessel Nozzle Inspection for Third 10-Year Interval RevisionNondestructive Examination
Dissimilar Metal Weld
LIC-03-0124, Transmittal of Fort Calhoun Station (FCS) Pressure Temperature Limits Report (Ptlr), Revision 010 September 2003Transmittal of Fort Calhoun Station (FCS) Pressure Temperature Limits Report (Ptlr), Revision 0Hydrostatic
Pressure and Temperature Limits Report
LIC-03-0119, Fitness-for-Duty Program Performance Data Report27 August 2003Fitness-for-Duty Program Performance Data ReportFitness for Duty
ML03141021220 May 2003Thesis (Miscellaneous Report - 134 Pages), Fort Calhoun, S107100
LIC-03-0063, Fire Modeling Analysis - Fire Area 3225 April 2003Fire Modeling Analysis - Fire Area 32Safe Shutdown
LIC-03-0038, Comments on Letter from Us Fish and Wildlife Service Re Impact of Plant Operation on Pallid Sturgeon14 March 2003Comments on Letter from Us Fish and Wildlife Service Re Impact of Plant Operation on Pallid Sturgeon
ML02329047022 November 2002Issuance of Environmental Scoping Summary Report Associated with Staff'S Review of Application for Renewal of Operating License for Fort Calhoun Station, Unit 1Probabilistic Risk Assessment
Aging Management
Safeguards Contingency Plan
Open House
License Renewal
Earthquake
Chernobyl
Siren
LIC-02-0104, Omaha Public Power District Fitness-for-Duty Program Performance Data Report29 August 2002Omaha Public Power District Fitness-for-Duty Program Performance Data ReportFitness for Duty
LIC-02-0054, Annual Report for 2001 Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10CFR50.4630 April 2002Annual Report for 2001 Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10CFR50.46
LIC-02-0046, Special Report on Inoperability of Main Steam Line Radiation Monitor RM-064 for Post-Accident Monitoring16 April 2002Special Report on Inoperability of Main Steam Line Radiation Monitor RM-064 for Post-Accident MonitoringPost Accident Monitoring
LIC-02-0023, Fitness-for-Duty Program Performance Data Report from Omaha Public Power District, July 1 Through December 31, 200126 February 2002Fitness-for-Duty Program Performance Data Report from Omaha Public Power District, July 1 Through December 31, 2001Fitness for Duty