Fitness-for-Duty Program Performance Data Report for Six Month Period from January 1 Through June 30, 2004
ML041970560
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/14/2004
From: Tesar M
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-04-0081
Download: ML041970560 (4)


Text

Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 July 14,2004 LIC-04-008 1 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Reference:

Docket No. 50-285

SUBJECT:

Fitness-for-Duty Program Performance Data Report In accordance with 10 CFR 26.7 1(d), attached please find the Omaha Public Power District (OPPD) Fitness-for-Duty Program Performance Data for the six-month period from January 1 through June 30,2004.

No commitments are made to the NRC in this letter. If you have any questions, please contact Tom Matthews at (402) 533-6938.

Sincerely, M. A. Tesar Division Manager Nuclear Support Services MAT/MLE/mle Attachment c: B. S. Mallett, Regional Administrator, NRC Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector Employment with Equal Opportunity

LIC-04-0081 Attachment Page 1 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Omaha Public Power District June 30,2004 Company 6 Months Ending Fort Calhoun Nuclear Power Station Location Terri Petersen (402) 533-7325 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml) Appendix A to 10 CFR 26 Marijuana 50 I 15 Amphetamines 1000 I 500 Benzodiazepines 300 I 300 Cocaine 300 I 150 Phencyclidine 25 I 2 5 Barbiturates 300 1300 Opiates 300 1300 Alcohol (% BAC) 0.04 Methadone 3001 300 Propoxyphene 300 I 300 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 1 870 145

  1. Tested # Positive # Tested # Positive # Tested # Positive Pre-Access O I P 4 I 1 Post Accident 0 I l o l o Cause Observed 0 0 0 Random I 249 I 44 l o FOIIOW-UP Other (re-entry)

Total I 312 2 98 1

LIC-04-0081 Attachment Page 2 Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe- Phency-Alcohol Refusal clidine tamines to Test Licensee Employees 2 0 Long-Term Contractors S hort-Term 1 Contractors Total 1 2

LIC-04-0081 Attachment Page 3 I. MANAGEMENT ACTIONS A. One non-licensed employee tested positive for alcohol on a random test. He then tested positive for alcohol again on a re-entry test prior to completing a re-entry agreement.

B. A contractor employee attempted to subvert his drug/alcohol test by providing urine outside the temperature range. He was then directly observed while providing a second specimen. The second (observed) specimen tested positive for opiates.

II. EVENTS REPORTED No events to report.