Category:Letter type:LIC
MONTHYEARLIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 LIC-18-0028, Letter of Intent to Submit Request for Additional Partial Site Release2018-10-18018 October 2018 Letter of Intent to Submit Request for Additional Partial Site Release LIC-18-0027, Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2018-10-0303 October 2018 Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update LIC-18-0003, License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool2018-09-28028 September 2018 License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool LIC-18-0025, Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 20192018-07-19019 July 2018 Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 2019 LIC-18-0023, Fort Calhoun Station, Unit 1 Request for Partial Site Release2018-06-29029 June 2018 Fort Calhoun Station, Unit 1 Request for Partial Site Release LIC-18-0021, Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan)2018-06-0606 June 2018 Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan) LIC-18-0017, Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy2018-04-26026 April 2018 Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy 2023-08-24
[Table view] Category:Report
MONTHYEARLIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0001, Well Water Results with River Stage2022-01-13013 January 2022 Well Water Results with River Stage ML22034A5942021-12-22022 December 2021 Hydrogeological Conceptual Site Model, Rev. 5 ML21271A5242021-08-0303 August 2021 License Amendment Request (LAR) 21-01, CM-244 Soil Regression and Correlation Report ML21271A2102021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 4 3 Omaha Public Power District, Fort Calhoun Station Unit 1, Defueled Safety Analysis Report CAC 2 ML21271A1442021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS LTP Rev 0. Final - All ML21271A3052021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Bfm Insitu Regression and Correlation Report TC-99 ML21271A2112021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 5 18 Radiation Safety and Control Services, Tsd 21-043, Radionuclides of Concern in Support of the Fort Calhoun License Termination Plan ML21271A4082021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Insitu Uncertainty Report Eu-152 ML21271A3852021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Excavation Dsr 0.15 M ML21271A5212021-08-0303 August 2021 License Amendment Request (LAR) 21-01, CM-244 Soil Uncertainty Report ML21271A5222021-08-0303 August 2021 License Amendment Request (LAR) 21-01, CM-243 Soil Uncertainty Report ML21271A1802021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 2 19, Omaha Public Power District, FC-20-012, Fort Calhoun Station Decommissioning Project Radiological Characterization Report ML21271A2722021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Drilling Spoils Dsr ML21271A5172021-08-0303 August 2021 License Amendment Request (LAR) 21-01, EU-154 Soil Uncertainty Report ML21271A3262021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Bfm Insitu Regression and Correlation Report NI-63 ML21271A6002021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 8, 13, Omaha Public Power District, Offsite Dose Calculation Manual CAC2 ML21271A4502021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Soil AF 100 Dcgl 0.15 M.Rad ML21271A4782021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Eu-152 Soil Uncertainty Report ML21271A4802021-08-0303 August 2021 License Amendment Request (LAR) 21-01, C-14 Soil Uncertainty Report ML21271A2582021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 8 Radiation Safety and Control Services, Tsd 21-043, Radionuclides of Concern in Support of the Fort Calhoun -1 ML21271A1962021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 3, 1, Omaha Public Power District, Defueled Safety Analysis Report CAC 2 ML21271A4772021-08-0303 August 2021 License Amendment Request (LAR) 21-01, CO-60 Soil Regression and Correlation Report ML21271A3212021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Bfm Insitu Uncertainty Report SR-90 ML21271A4852021-08-0303 August 2021 License Amendment Request (LAR) 21-01, NI-63 Soil Regression and Correlation Report ML21271A2902021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Bfm Insitu Uncertainty Report H-3 ML21271A4832021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Eu-155 Soil Uncertainty Report ML21271A4952021-08-0303 August 2021 License Amendment Request (LAR) 21-01, CS-134 Soil Regression and Correlation Report ML21271A3012021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Bfm Insitu Uncertainty Report C-14 ML21271A5092021-08-0303 August 2021 License Amendment Request (LAR) 21-01, EU-152 Soil Regression and Correlation Report ML21271A2612021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 1 Haley & Aldrich, Hydrogeological Conceptual Site Model, Rev. 2, Fort Calhoun Station, Blair, Ne, 2021 CAC2 ML21271A2652021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 7 FC-20-007, Fort Calhoun Station Potential Radionuclides of Concern CAC2 ML21271A5052021-08-0303 August 2021 License Amendment Request (LAR) 21-01, CO-58 Soil Uncertainty Report ML21271A4872021-08-0303 August 2021 License Amendment Request (LAR) 21-01, EU-154 Soil Regression and Correlation Report ML21271A4882021-08-0303 August 2021 License Amendment Request (LAR) 21-01, CS-137 Soil Uncertainty Report ML21271A2862021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Bfm Insitu Regression and Correlation Report H-3 ML21271A2192021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 5 12 FC-20-007, Fort Calhoun Station Potential Radionuclides of Concern CAC2 ML21271A2622021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 2 Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station - F-1 ML21271A2752021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Bfm Insitu Scenario Dsr ML21271A4972021-08-0303 August 2021 License Amendment Request (LAR) 21-01, CO-58 Soil Regression and Correlation Report ML21271A5042021-08-0303 August 2021 License Amendment Request (LAR) 21-01, CM-243 Soil Regression and Correlation Report ML21271A2672021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 3 Omaha Public Power District, Fort Calhoun Station Unit 1, Defueled Safety Analysis Report CAC2 ML21271A2692021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 19 E. A. Napier, Hanford Environmental Dosimetry Upgrade Project, Gen II the Hanford Environmental Radiation D-1 ML21271A3862021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Excavation Dsr 1.0 M ML21271A2002021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 3 14 Backfill Attachment Final CAC 2 ML21271A4572021-07-28028 July 2021 License Amendment Request (LAR) 21-01, FCS Soil AF 143 Dcgl 0.15 M ML21271A4562021-07-28028 July 2021 License Amendment Request (LAR) 21-01, FCS Soil AF 143 Dcgl 1 M ML21271A1982021-07-24024 July 2021 License Amendment Request (LAR) 21-01, Chapter 3, 6, Omaha Public Power District, FC-21-002, Description of Embedded Piping, Penetrations, and Buried Pipe to Remain in Fort Calhoun End State ML21271A2602021-07-24024 July 2021 License Amendment Request (LAR) 21-01, Chapter 6 4, Omaha Public Power District, FC-21-002, Description of Embedded Piping, Penetrations, and Buried Pipe to Remain in Fort Calhoun End State ML21271A2132021-07-23023 July 2021 License Amendment Request (LAR) 21-01, Chapter 5 9 Oddp FC-20-006 - End State Concrete Surface Areas and Volumes Rev 0 CAC2 2022-03-17
[Table view] Category:Miscellaneous
MONTHYEARML21271A2002021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 3 14 Backfill Attachment Final CAC 2 ML21271A1742017-03-0202 March 2017 License Amendment Request (LAR) 21-01, Chapter 2 20 Storm Water Discharge Authorization Permit Renewal NER910677 Package for FCS cac2 ML16182A3612016-08-0404 August 2016 Staff Review of Spend Fuel Pool Evaluation Associated with Reevaluation Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 LIC-16-0031, Ft. Calhoun, Unit 1 - Annual Report for 2015 Loss-of-Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.462016-04-28028 April 2016 Ft. Calhoun, Unit 1 - Annual Report for 2015 Loss-of-Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46 LIC-16-0013, Ft. Calhoun, Unit 1 and ISFSI - Transmittal of 10CFR72.48 Evaluation Summary Report for January 1, 2015 Through December 31, 20152016-02-10010 February 2016 Ft. Calhoun, Unit 1 and ISFSI - Transmittal of 10CFR72.48 Evaluation Summary Report for January 1, 2015 Through December 31, 2015 LIC-15-0005, (Fcs), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2013 Through December 31, 20142015-01-15015 January 2015 (Fcs), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2013 Through December 31, 2014 ML14226A5512014-08-14014 August 2014 Revision of Standard Practice Procedures Plan for Fort Calhoun Station, Unit 1 ML14157A0792014-06-24024 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Fukushima Dai-Ichi Nuclear Power Plant Accident ML14105A3732014-04-22022 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident LIC-14-0047, Omaha Public Power District - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushi2014-03-31031 March 2014 Omaha Public Power District - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima ML13172A3432013-06-19019 June 2013 Integrated Performance Improvement Plan, Revision 5, Page 138 Through End LIC-13-0086, Integrated Performance Improvement Plan, Revision 5, Cover Through Page 732013-06-19019 June 2013 Integrated Performance Improvement Plan, Revision 5, Cover Through Page 73 ML13172A3422013-06-19019 June 2013 Integrated Performance Improvement Plan, Revision 5, Page 74 Through Page 137 ML12340A2542012-11-27027 November 2012 OPPD 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. Part 2 of 3 ML12340A2552012-11-27027 November 2012 OPPD 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. Part 2 of 3 LIC-12-0098, Integrated Performance Improvement Plan, Rev. 32012-07-0909 July 2012 Integrated Performance Improvement Plan, Rev. 3 ML11276A1202011-09-28028 September 2011 Enclosure 1 to LIC-11-0099, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) LIC-11-0099, Table B-2 Nuclear Safety Capability Assessment Methodology Review2011-09-28028 September 2011 Table B-2 Nuclear Safety Capability Assessment Methodology Review LIC-11-0090, Post-Flooding Recovery Action Plan2011-08-10010 August 2011 Post-Flooding Recovery Action Plan ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants LIC-08-0120, Steam Generator Eddy Current Test Report - 2008 Refueling Outage2008-12-0909 December 2008 Steam Generator Eddy Current Test Report - 2008 Refueling Outage LIC-08-0107, Notice of Completion of Corrective Actions Taken in Response to Generic Letter 2004-02 and Response to Request for Additional Information2008-10-16016 October 2008 Notice of Completion of Corrective Actions Taken in Response to Generic Letter 2004-02 and Response to Request for Additional Information LIC-08-0071, Transmittal of Fort Calhoun, Unit 1, Reactor Coolant System Pressure and Temperature Limits Report, Revision 42008-05-27027 May 2008 Transmittal of Fort Calhoun, Unit 1, Reactor Coolant System Pressure and Temperature Limits Report, Revision 4 LIC-07-0017, Fitness-for-Duty Program Performance Data Report for July 1 Through December 31, 20062007-02-22022 February 2007 Fitness-for-Duty Program Performance Data Report for July 1 Through December 31, 2006 LIC-06-0138, Transmittal of Revision 3 of Fort Calhoun Station, Unit No. 1 (Fcs), Pressure Temperature Limits Report (PTLR)2006-11-29029 November 2006 Transmittal of Revision 3 of Fort Calhoun Station, Unit No. 1 (Fcs), Pressure Temperature Limits Report (PTLR) LIC-06-0083, Fitness-for-Duty Program Performance Report2006-07-26026 July 2006 Fitness-for-Duty Program Performance Report LIC-06-0056, Request for Exemption from Nuhoms Certificate of Compliance No. 1004, Amendment No. 82006-06-0909 June 2006 Request for Exemption from Nuhoms Certificate of Compliance No. 1004, Amendment No. 8 ML0606501772006-03-0606 March 2006 Licensed Operator Positive Drug Tests ML0535403192005-12-0505 December 2005 51-9004805-001, FCS RSG - Afas Verification - RAI Responses. LIC-05-0043, Supplemental Information for Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors2005-04-15015 April 2005 Supplemental Information for Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors LIC-05-0016, Omaha Public Power District, Fitness-for-Duty Program Performance Data Report2005-02-0404 February 2005 Omaha Public Power District, Fitness-for-Duty Program Performance Data Report ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement LIC-06-0004, Attachment 1, Engineering Analysis (EA-FC-04-010) Recommendations for Implementing of Compensatory Actions in Response to NRC Bulletin 2003-012004-11-23023 November 2004 Attachment 1, Engineering Analysis (EA-FC-04-010) Recommendations for Implementing of Compensatory Actions in Response to NRC Bulletin 2003-01 LIC-04-0081, Fitness-for-Duty Program Performance Data Report for Six Month Period from January 1 Through June 30, 20042004-07-14014 July 2004 Fitness-for-Duty Program Performance Data Report for Six Month Period from January 1 Through June 30, 2004 ML0532204612004-06-14014 June 2004 Power Reactor Status Report for 6/14/04 ML0626304082004-03-0101 March 2004 PSEG Nuclear, LLC Salem/Hope Creek Safety Culture Assessment LIC-03-0154, Relief Request Pertaining to Reactor Vessel Nozzle Inspection for Third 10-Year Interval Revision2003-11-21021 November 2003 Relief Request Pertaining to Reactor Vessel Nozzle Inspection for Third 10-Year Interval Revision LIC-03-0124, Transmittal of Fort Calhoun Station (FCS) Pressure Temperature Limits Report (Ptlr), Revision 02003-09-10010 September 2003 Transmittal of Fort Calhoun Station (FCS) Pressure Temperature Limits Report (Ptlr), Revision 0 LIC-03-0119, Fitness-for-Duty Program Performance Data Report2003-08-27027 August 2003 Fitness-for-Duty Program Performance Data Report ML0314102122003-05-20020 May 2003 Thesis (Miscellaneous Report - 134 Pages), Fort Calhoun, S107100 LIC-03-0063, Fire Modeling Analysis - Fire Area 322003-04-25025 April 2003 Fire Modeling Analysis - Fire Area 32 LIC-03-0038, Comments on Letter from Us Fish and Wildlife Service Re Impact of Plant Operation on Pallid Sturgeon2003-03-14014 March 2003 Comments on Letter from Us Fish and Wildlife Service Re Impact of Plant Operation on Pallid Sturgeon ML0232904702002-11-22022 November 2002 Issuance of Environmental Scoping Summary Report Associated with Staff'S Review of Application for Renewal of Operating License for Fort Calhoun Station, Unit 1 LIC-02-0104, Omaha Public Power District Fitness-for-Duty Program Performance Data Report2002-08-29029 August 2002 Omaha Public Power District Fitness-for-Duty Program Performance Data Report LIC-02-0054, Annual Report for 2001 Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10CFR50.462002-04-30030 April 2002 Annual Report for 2001 Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10CFR50.46 LIC-02-0046, Special Report on Inoperability of Main Steam Line Radiation Monitor RM-064 for Post-Accident Monitoring2002-04-16016 April 2002 Special Report on Inoperability of Main Steam Line Radiation Monitor RM-064 for Post-Accident Monitoring LIC-02-0023, Fitness-for-Duty Program Performance Data Report from Omaha Public Power District, July 1 Through December 31, 20012002-02-26026 February 2002 Fitness-for-Duty Program Performance Data Report from Omaha Public Power District, July 1 Through December 31, 2001 2021-08-03
[Table view] |
Text
-
-8a'am-MFMN
-Im e Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 December 9,2008 LIC-08-0120 U. S. Nuclear Regulatory Comrr~ission ATTN: Docun~entControl Desk Washington, DC 20555
Reference:
Docket No. 50-285
SUBJECT:
Fort Calhoun Station (FCS), Unit No. 1, Steam Generator Eddy Current Test Report 2008 Refueling Outage Pursuant to Technical Specification 3.1 7(3), attached is the FCS Steam Generator Eddy Current Test Report surr~niarizingtesting performed during the Spring 2008 Refueling Outage.
If you have any questions or require additional information, please contactTeddy Hutchinson at (402) 533-7389. IVo commitments to the NRC are made in this letter.
Division Manager IVuclear Engineering
Attachment:
Fort Calhoun Station Steam Generator Eddy Current Test Report, 2008 Refueling Outage Employment with Equal Opportunity
Attachment LIC-08-0120 Page 1 FORT CALHOUN STATION STEAM GENERATOR EDDY CURRENT TEST REPORT 2008 REFUELING OUTAGE
Attachment LIC-08-0120 Page 2 FORT CALHOUN STATION STEAM GENERATOR EDDY CURRENT TEST REPORT 2008 REFUELING OUTAGE Introduction
-This report summarizes steam generator eddy current test results obtained during the Fort Callioun Station (FCS) 2008 Refueling Outage (RFO). The Omaha Public Power District (OPPD) submitted test result summaries to the NRC for the two previous eddy current inspections in the following documents:
0 Fort Calhoun Station (FCS) Steam Generator Eddy Current Test Report -
2003 Refueling Outage, dated March 26, 2004 (LIC=04-0040)
Fort Calhoun Station (FCS) Steam Generator Eddy Current Test Report -
2005 Refueling Outage, dated September 26, 2005 (LIC-05-0118)
Westinghouse Nuclear Service Division performed eddy current examinations of the steam generator tubing at Omaha Public Power District's Fort Calhoun Station during April and May of 2008. The purpose of the examination was to assess the condition of the steam generators, to identify tubes requiring repair and to provide the information necessary to fulfill plant Technical Specification (TS) requirements. Entry into MODE 4 was achieved on June 14, 2008.
-The inspection conducted during the 2008 RFO was the first inspection conducted since replacement of the steam generators in 2006. Pursuant to the Fort Calhoun Station Technical Specifications, 100% of the tubes in each steam generator were inspected. No tube degradation was detected and no tubes were required to be repaired as a result of this inspection.
The condition monitoring assessment was performed to determine that Nuclear Energy Institute (IVEI) 97-06 Revision 2, Steam Generator Program Guidelines, performance criteria were satisfied at the time of ,the inspection. -The operational assessment was performed to determine that NEI 97-06 performance criteria will be satisfied until the next planned steam generator inspection.
Because no degradation was detected, condition monitoring is projected to be satisfied for three cycles of operation of 1.5 effective full power years (EFPY) each for both steam generators. Thus the operational assessment criteria are satisfied for at least three cycles of operation.
Secondary side maintenance consisted of sludge lancing in both steam generators. Top of tube sheet foreign object search and retrieval (FOSAR) and in-bundle inspections were co~iductedas well.
Attachment LIC-08-0120 Page 3 Description of FCS Steam Generators FCS is a two-loop Combustion Engineering design nuclear steam supply system (NSSS). The FCS steam generators were replaced during the 2006 RFO. The FCS replacement steam generators are re-circulating type, designed and manufactured by Mitsubishi Heavy Industries (IWHI) and are designated as model MHI-49TT-1. The tubing material is searr~lessnickel-chromium-iron Alloy 690 thermally treated (UNS N06690) with an outside diameter of 0.750 inches and a nominal wall thickness of 0.043 inches. There are 127 columns and 104 rows installed in the steam generator for a total of 5,200 tubes. There are 12 stay rods spaced throughout the tube bundle. The tubing is installed in a tri-angular configuration with a nominal pitch of 1.0 inch center to center. The tubing as installed has a single uniform u-bend with a minimum bend radius of 3.5 inches in row 1. All of the u-bends in rows 1 through 14 were stress relieved after bending by a second thermal treatment. In the upper bundle the tubes are restrained From out of plane movement by a series of 10 anti-vibration bars. The vertical section of the tubing is supported by 5 horizontal support plates which are of broached design with a three point contact on the tube. Each broached support is nominally 1.38 inches thick and is chamfered at both the top and bottom edges. The material for all of the support structures including the anti vibration bars (AVB) is series 405 stainless steel. The tube to tubesheet joint is comprised of a mechanical hard-roll at the primary face of the tubesheet and a hydraulic expansion of the remainder of tlie 25.79 inch thickness of the tubesheet. The nominal diametral tube expansion is 0.009 inches. The tubes are seal welded at the primary face of the tubesheet. The material for tubesheet itself is low alloy carbon steel and is clad with inconel on the primary face. The operating temperature (That) is 593'F.
At the time of the 2008 RFO, the FCS steam generators had operated for approximately 18 months and accumulated 1.34 EFPY. One (1 ) tube in steam generator RC-26 was plugged at the WlHl fabrication facility during manufacturing due to a manufacturing anomaly.
The total number and percent of tubes plugged at the start of the 2008 RFO are:
RC-2A has 0 tubes plugged, which is 0.000% of the total number of tubes.
RC-26 has 1 tube plugged, which is 0.019% of the total number of tubes.
Scope of Examination The Inspection Plan was developed from the FCS Degradation Assessment (DA) for the 2008 RFO. There are no existing degradation mechanisms in the FCS steam generators. The potential degradation mechanisms include:
O anti vibration bar (AVB) wear O
tube support plate (TSP) wear
Attachment I-IC-08-0120 Page 4 a
tube-to-tube fretting or proximity (PRO) wear a loose part wear A tube end to tube end bobbin coil inspection was performed on 100% of the tubes in the FCS steam generators. The examination program included multi-frequency bobbin probe testing for indications of degradation from wear at the AVB's, TSP, or because of tube-to-tube proximity or loose parts wear. The tests were conducted from both the hot and cold leg. A majority of the testing were full length exams, but the lower rows (rows 1-4) were tested from the hot leg, tube end hot to the top support on the hot leg side (48 inches per second) and from the cold leg, tube entry cold leg to the top support on the hot leg side (24 inches per second).
The special interest inspection program (informational exams) was + PointTM probe testing of locations such as all manufacturing burnish marks (MBM)',
bulges (BLG) and geometric distortions (GEO) from the pre-service inspection (PSI) were part of the base examination. All dents (DNT)* and dings (DNG)~2 0.5 volts from the PSI were also inspected. Additional + PointTMexams were performed for further evaluation of indications detected with bobbin coil tests.
Table 1 summarizes the steam generator eddy current examinations performed at FCS during the 2008 RFO.
Table 1 Steam Generator RC-2A The initial inspection program consisted of the following:
Bobbin examination: 100% of accessible tubes full length (5200 tubes) 2871 Hot leg (H/L) bobbin program tested at 48 inches per second 2329 Cold leg (C/L) bobbin program tested at 48 inches per second 252 Cold leg bobbin program tested at 24 inches per second
+ PointTMexamination special interest inspection programs:
13 Special lnterest historical indications H/L inspections in 13 tubes 5 Special Interest H/L inspections in 5 tubes 7 Special Interest historical indications C/L inspections in 5 tubes 1
Attributable to the manufacturing process.
2 Service induced dent (not present in baseline examination).
3 Ding - Baseline dent. The threshold for reporting a ding was a 5501140 differential mix P1 response of 1.0 volts for new dings (not initially identified in the baseline examination). Historical dings (called in baseline examination) were tracked at 0.5 volts.
Attachment I-IC-08-0120 Page 5 Steam Generator RC-2B The initial inspection program consisted of the following:
Bobbin examination: 100% of acqessible tubes full length (5199 tubes) 3002 Hot leg bobbin program tested at 48 inches per second 2197 Cold leg bobbin program tested at 48 inches per second 273 Cold leg,bobbin program tested at 24 inches per second
+ PointTMexamination of special interest inspection programs:
8 Special Interest historical indications H/L inspections in 8 tubes 2 Special Interest HIL inspections in 2 tubes 13 Special lnterest historical indications C/L inspections in 10 tubes 1 Special Interest CIL inspections in 1 tube The results of the inspection are discussed later in this report in the lnspection Results section.
All examinations were in compliance with the Steam Generator Program, Technical Specification Task Force (TSTF)-449 and the FCS Technical Specifications. The FTC inspection program, as conducted, meets or exceeds the recommendations contained in the Electric Power Research Institute (EPRI)
Pressurized Water Reactor (PWR) Steam Generator Guidelines, Revision 6. All data acquisition personnel were trained and qualified in the eddy current method and were certified to a minimum of Level I.
Personnel from Westinghouse, NDE, Young Technical Services (YTS),Tecnatom, HRlD and MoreTech performed the eddy current analysis.
Primary analysis was performed by Tecnatom, HRlD and Moretech data analysts. All primary analysis was done manually. NDE and YTS performed independent secondary analysis utilizing an automated data-screening program (ADS) for bobbin data and manual analysis for + PointTMdata. Representatives of Westinghouse, Wiltec and YTS performed resolution analysis. MoreTech provided independent Qualified Data Analysts (QDA) oversight for the analysis process. All analysis personnel assigned to the OPPD Fort Calhoun Station examination were Qualified Data Analysts in accordance with Appendix G of the EPRl PWR Steam Generator Examination Guidelines Revision 6. In addition, all data analysis personnel were qualified by a written and proficiency examination utilizing the EPRl site specific performance demonstration software program.
The Westinghouse ST Max data management system provided primary data management of the eddy current examination results. The ST Max system also provided electronic test plans to acquisition. The EddynetTM lnspection
Attachment LIC-08-0120 Page 6 Management System (EIMS) ZetecTMsoftware was used for secondary data management. The outputs of the Westinghouse ST Max data management system and the EIMS data management system were compared upon completion of the examination to ensure data accuracy.
Eddy current data was transmitted from the acquisition stations to the analysis stations via a local area network (LAIV) and stored on local hard disks. The data was subsequently transmitted via a wide area network (WAN) to two independent teams of analysts. Primary and secondary analysis was done in the Westinghouse remote data room (REDAC) located at the Waltz-Mill site in Madison, PA. Lead analysts (eddy current Level Ill), resolved discrepancies between the two sets of evaluation results. The removal of potential degradation indications from the database received the concurrence of two Lead Analyst personnel representing the primary and secondary analysis teams. All analysis was in concurrence with the Westinghouse procedure MRS-SSP-2229-CFTCI rev 00. All analysis was performed using Westinghouse Anser software rev 299 on a Hewlett Packard (HP)-UX operating system installed on HP UNlX workstations. The raw data along with the evaluated results from these analyses were then transferred to optical disks for permanent storage.
In addition to the regular analysis the outer peripheral tubes were re-analyzed in a separate analysis group. This re-analysis was done by specifically screening the low frequencies to identify loose parts. This re-analysis was done by the secondary analyst.
During the course of the examination, feedback was provided to all analysis personnel by utilizing the Analysis Performance Tracking Software (APTS). All analysts were required to review all of their missed calls and 20% of their overcalls.
In addition to OPPD's Steam Generator Program Manager, OPPD was represented by an Eddy Current Level Ill, from MoreTech, who performed as lndependent QDA. She was not part of the Primary, Secondary, or Resolution analysis teams. The independent QDA provided an overview function for Omaha Public Power District in accordance with Westinghouse procedure MRS-SSP-2229-CFTCI rev 00. Among other duties the independent QDA randomly reviewed the data to ensure that the data quality was acceptable. The lndependent QDA also checked to ensure the resolution process was properly performed and that field calls were properly reported.
Inspection Equipment Westinghouse Electric Company performed the nondestructive examination (NDE) of the steam generator (SG) tubes. Westingh,ouse PEGASYS manipulators with dual guide tube fixtures were used to perform testing from the
Attachment I-IC-08-0120 Page 7 hot leg and cold leg plenums in both steam generators. Corestar Ornni-200 multi-frequency eddy current testerstprobe pushers were used to energize the test probes on all test stations. HP workstations controlled the PEGASYS fixture, and the Omni-200 testertprobe pushers. The software package that was used is documented in MRS-DFD-2217-SR Rev 2. The raw eddy current data was stored on hard disks attached to the acquisition workstations; this data was then stored on the data server computers. Final data storage was on optical disks.
Inspection Techniques The Fort Calhoun Station Steam Generator 2008 RFO Degradation Assessment Report (DA) number SG-CDME-08-04 rev 1 identifies the following EPRl Appendix H Qualified ECT Techniques (ETSS) as applicable for Fort Calhoun Station for potential damage mechanisms or informational exams with the bobbin or MRPC +Point.
Table 2 Potential Damage Mechanisms ETSS # Probe Application 96004.1 r l 1 Bobbin - Wear at Tube Supports 96004.1 r l 1 Bobbin Wear at Anti-Vibration Bars and Diagonal Straps 27091.2 r0 Bobbin Detection and Depth Sizing of Loose Part Volumetric Indications, Freespan area (loose part not present) 96910.1 rO Plus Point Wear, Plus Point, 300t100 kHz mix TSP 27901 . I to 27907.1 all Plus Point Detection and sizing of various orientation of r0 indications caused by loose parts (loose part not present)
Informational exams ETSS # Probe Application 96010.1 r7 Bobbin Small volume MBM in free span of tubing 24013.1 r2 Bobbin Outer Diameter Stress Corrosion Cracking in Freespan Dings less than 5 volts 22401.1 r4 Plus Point Detection of axial ODSCC at dented support structures 22484.1 r4 Plus Point Detection and length sizing of circumferential ODSCC in parent tubing with dented support structures.
9651 1.2 r16 Plus Point Detection of Axial and Circumferential Primary Water Stress Corrosion Cracking in low row U-Bend Regions.
Attachment LIC-08-0120 Page 8 The test frequencies used for the bobbin probe were 550, 280, 140 and 40 kHz differential and absolute. The test frequencies used for the 1 Coil NlRPC U-Bend
+Point Midrange probe were 400,300, 150 and 35 kHz.
The bobbin probe calibration standards used for the examination were manufactured to conform to the requirements of Section V of the 1998 to 2000 addenda of the ASME Boiler and Pressure Vessel Code. Tests of the calibration standards and the as-built drawings of each standard were used to set spans, voltages and phase rotations of each bobbin test, as well as settirrg calibration curves for sizing of tube wear.
MRPC standards were manufactured with various EDM notches to permit the set up of the spans and rotations to achieve the best possible detection. The dimensions and tolerances of the notches are in accordance with the recommendations provided in the EPRl PWR Steam Generator Guidelines, Revision 6.
Inspection Results There are currently no degradation mechanisms in the Fort Calhoun steam generators. The results for the potential degradation mechanisms and non damage mechanisms are as follows:
Potential Degradation Mechanisms:
o Mecliarrical Wear lndications at the Anti Vibration Bar: There were 0 tubes in SG RC-2A and 0 tubes in SG RC-2B, with indications of wear at the anti vibration bars.
o Mechanical Wear lndications at Support Structures: There were 0 tubes in SG RC-2A and 0 tubes in SG RC-2B, with indications of wear at support str~~ctl-lres.
o Mecharlical Wear lndications due to Tube-to-Tube Fretting or Proximity (PRO) Wear. There were 0 tubes in SG RC-2A and 0 tubes in SG RC-2B, with indications of wear from tube proximity.
No indication of tube-to-tube proximity was detected this outage.
o Mechanical Wear lndications due to Loose Parts: There were 0 tubes in SG RC-2A and 0 tubes in SG RC-2B, with indications of loose part wear. No loose parts were detected during this outage from either ECT testing or secondary side visuals.
Attachment LIC-08-0120 Page 9 Informational Exams:
o Manufacturing Burnish Marks (MBM): Manufacturing Burnish Marks (MBM) are conditions where shallow volumetric scuffs introduced into the tubes exterior during the final tube polishing.
There were two MBM indications reported during the baseline.
Using the analysis procedure flow charts for freespan indications these indications were not reportable. Both of the historical iVlBMs were tested with the plus point coil. R 56 C12 showed a volumetric indication and was called an MBM, testing of R 36 C 68 showed no indication.
If an indication had changed based on the phase or voltage requirements or was a new indication, an absolute drift indication (ADI) or distorted freespan indication (DFI) was called and the indication was examined with a plus point cod. There were two (2)
DFI indications identified in two (2) different tubes in SG RC-2A and one (1) AD1 and one (1) DFI indications identified in two (2) different tubes in SG RC-2B. All the AD1 and DFI indications were inspected with a plus point coil. The results of the tests were that no defect was found (NDF).
o Ding with indication (DDI) is a condition where a possible flaw signal forms within a ding signal. There was one (1) DDI indication reported in SG RC-2A. The DDI signal was inspected with a MRPC plus point coil. The results of the tests were no defect was found (NDF). There were no DDI signals reported in SG RC-2B .
o Ding (DNG) is a baseline indication where the tubing inside diameter is less than normal. The degradation asses'sment specified that all dings 0.5 volts or greater that were reported in the baseline exarrrination would be inspected with a plus point coil.
There were 15 dings in 13 tubes in SG RC-2A and 17 dings in 14 tubes in SG RC-2B. All the dings in SG RC-2A and SG RC-2B were inspected with a MRPC probe with a plus point coil. The results of the tests were that no defect was found (NDF).
o Dent (DNT) is a service induced dent where the tubing inside diameter is less than normal. Dent indications were reported if the P I mix channel was greater than 1.0 volt and there was no dent indication found in the baseline data. There were three (3) dentslding identified in three (3) different tubes in SG RC-2A and one (1) new dent identified in SG RC-2B. All the dents in SG RC-2A and SG RC-2B were inspected with a MRPC probe with a plus
Attachment LIC-08-0120 Page 10 point coil. The results of the tests were that no defect was found (MDF). ,
o Bulge (BLG) is a condition where the tubing outside diameter is greater than normal. There were two (2) bulges identified in two (2) different tubes in SG RC-2B. The location of these bulges were near the 5th AVB support. All the BLG indications were inspected with a MRPC probe with a plus point coil. The results of the tests were that no defect was found (IVDF).
o Geometric Distortion (GEO) is an abnormal geometry change, usually indicative of a lift-off signal caused by a local inside diameter change from tubing manufacturing. There were five Geometric Distortion identified with the MRPC probe using a p l ~ ~ s point coil in SG RC-2A. The location of these GEOs were near the hot leg 5th TSP. There were no GEO signals reported in SG RC-2B.
o All special interest was inspected with the single coil plus point coil.
The sample density was 30 samples circumferential and 30 samples axial.
Repairable Indications:
o Steam Generator RC-2A, there were no tubes plugged.
o Steam Generator RC-2B, there were,no tubes plugged.
The total number and percent of tubes plugged at the completion of this outage:
o RC-2A has 0 tubes plugged, which is 0.000% of the total number of tubes.
o RC-2B has 1 tube plugged, which is 0.019% of the total number of tubes.
Tube Plug Inspections:
o There are zero (0) plugged tubes in Steam Generator RC-2A.
o There is one (1) plugged tube in Steam Generator RC-2B located at R71 C57. This tube was plugged during manufacturing. A visual inspection was performed on the tube plug and it was found to be in excellent condition.
Inspection Plan Expansions:
o No inspection plan expansions were performed as part of the 2008 steam generator inspections.
Attachment 1-IC-08-0120 Page 11 Secondary Side Maintenance and inspections:
o Approximately five (5) pounds of sludge was removed from each steam generator.
o Top of tube sheet FOSAR and in-bundle inspection found zero (0) loose parts in each steam generator.