Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23320A247 | 17 November 2023 | Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 | Probabilistic Risk Assessment |
ML23271A268 | 5 October 2023 | September 25, 2023, Summary of with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans | Offsite Dose Calculation Manual |
ML23263B106 | 22 September 2023 | R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary | |
ML23187A443 | 11 July 2023 | 6/27/2023, Annual Assessment Meeting for Seabrook Station - Meeting Summary | |
ML23179A001 | 28 June 2023 | 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary | |
ML23086B996 | 4 April 2023 | Summary of March 7, 2023, Meeting with Nextera Energy Seabrook, LLC Regarding Planned Submittal of License Amendment Request to Revise Emergency Action Level Due to Modification to Containment Fire Detection Equipment | |
ML23088A152 | 29 March 2023 | Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report | |
ML23055A035 | 24 March 2023 | Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels | |
ML23033A666 | 9 February 2023 | Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna | |
ML22346A000 | 14 December 2022 | Summary of November 3, 2022, Meeting with Constellation to Discuss Planned License Amendment Requests to Adopt TSTF-505 and 10 CFR 50.69 | Safe Shutdown High winds Probabilistic Risk Assessment FLEX Large early release frequency |
ML22264A199 | 14 November 2022 | Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and | Probabilistic Risk Assessment |
ML22144A002 | 14 September 2022 | Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan | Health Physics Network FLEX Severe Accident Management Guideline |
ML22187A146 | 6 July 2022 | Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary | |
ML22146A342 | 13 June 2022 | February 23, Summary of Meetings with Nextera Energy Seabrook, LLC Regarding Planned Submittal of License Amendment Request to Update Pressure-Temperature Limits Curves Period of Applicability | Nonconservative Technical Specifications |
ML22153A167 | 2 June 2022 | Annual Assessment Meeting for Seabrook Station - Meeting Summary | |
ML21336A407 | 7 December 2021 | Summary of Conference Call Regarding the Fall 2021 Steam Generator Tube Inspections | |
ML21333A153 | 30 November 2021 | Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval | Incorporated by reference |
ML21237A041 | 30 August 2021 | Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, | |
ML21176A082 | 6 July 2021 | June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure | |
ML21168A152 | 22 June 2021 | Annual Assessment Meeting Summary | |
ML21139A185 | 22 June 2021 | Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting | Incorporated by reference |
ML21033A625 | 16 February 2021 | Summary of January 5, 2021, Meeting with Exelon Generation Company, LLC Regarding License Amendment Request to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements at Nine Mile Point Nuclear Station, Unit 1 | Water Inventory Control |
ML21011A282 | 21 January 2021 | Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 | B.5.b Mitigating Strategies |
ML20351A283 | 18 December 2020 | Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs | Incorporated by reference Exemption Request Power-Operated Valves |
ML20342A352 | 10 December 2020 | Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) | |
ML20323A033 | 1 December 2020 | Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs | Incorporated by reference |
ML20230A022 | 20 August 2020 | Summary of August 6, 2020, Meeting with Exelon Generation Company, LLC Planned Submittal of a License Amendment Request and Alternative Request on Excess Check Valve Testing | |
ML20205L371 | 23 July 2020 | and R.E. Ginna Nuclear Power Plant Summary of Meeting | |
ML20181A000 | 29 June 2020 | Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach Botto | |
ML20174A268 | 22 June 2020 | June 3, 2020, Seabrook Annual Assessment Summary | |
ML20160A043 | 11 June 2020 | Summary of April 9, 2020, Meeting with Exelon Generation Company, LLC Regarding License Amendment Request to Change Allowable Main Steam Isolation Valve Leak Rates at Nine Mile Point Nuclear Station, Unit 2 | |
ML20157A182 | 8 June 2020 | Summary of May 8, 2020, Meeting with Exelon Generation Company, LLC, Regarding Proposed Emergency License Amendment Request Involving Control Room Air Treatment System | |
ML20077G974 | 18 March 2020 | R. E. Ginna Nuclear Power Plant - Summary of March 2, 2020, Meeting Regarding License Amendment Request to Support Shutdown of Reactor During Upcoming Refueling Outage | |
ML19326C358 | 3 December 2019 | Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program | Grace period |
ML19326A315 | 3 December 2019 | Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements | Anchor Darling |
ML19302D315 | 28 October 2019 | Annual Assessment Meeting for James A. Fitzpatrick Nuclear Power Plant and Nine Mile Point Nuclear Generating Station - Meeting Summary | Open House |
ML19253C755 | 10 September 2019 | Annual Assessment Meeting Summary | |
ML19183A238 | 19 July 2019 | Summary of Meeting with Exelon Generation Company, LLC, Planned Concurrent Submittal of Risk-Informed Completion Time and Risk-Informed Categorization | Probabilistic Risk Assessment |
ML19162A027 | 21 June 2019 | Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves | Incorporated by reference |
ML20108F090 | 20 April 2019 | April 15, 2020, Meeting Summary with Exelon Generation Company, LLC Regarding Planned Request to Defer Submittal of Owner'S Activity Report (Braidwood 2,Byron 2,Calvert Cliffs 1, LaSalle 1, Limerick 1, Nine Mile Point 2, Quad 2, R. E. Ginna | Coronavirus |
ML19073A017 | 21 March 2019 | Summary of Meeting with Nextera Energy Seabrook, LLC, on Proposed Relief Requests for the Containment Spray System for the Seabrook Station, Unit No. 1 | |
ML19046A383 | 26 February 2019 | Meeting Summary of February 13, 2019, Public Meeting in Hampton, New Hampshire Alkali-Silica Reaction License Amendment Request and License Renewal Application | |
ML19036A883 | 7 February 2019 | Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 | |
ML18354B171 | 2 January 2019 | Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines | |
ML18347B493 | 2 January 2019 | Summary of Pre-Application Meeting with Exelon Generation Co., LLC (Exelon) Forthcoming License Amendment Requests to Revise Technical Specification Requirements for Main Steam Isolation Valve Leak Rate Tests | |
ML18325A171 | 28 November 2018 | Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas | High Radiation Area |
ML18297A172 | 26 October 2018 | Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 | |
ML18283B799 | 15 October 2018 | Summary of Telephone Conference with Exelon Generation Company, LLC, Request to Revise Nine Mile Point Nuclear Station, Unit 1, Technical Specifications with New Requirements on Reactor Pressure Vessel Water Inventory Control | Water Inventory Control |
ML18262A366 | 18 September 2018 | August 21, 2018, James A. Fitzpatrick Nuclear Power Plant (Fitzpatrick) and Nine Mile Point Nuclear Generating Station (Nine Mile Point) Summary of Public Meeting | Open House |
ML18222A285 | 4 September 2018 | Summary of Telephone Conf. with Exelon Generation Company, LLC Regarding a Request to Revise Nine Mile Point Nuclear Station, Unit 1 Technical Specifications with New Requirements on Reactor Pressure Vessel Water Inventory Control | Water Inventory Control |