Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24008A15918 January 2024Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan
ML23345A10914 December 2023December 7, 2023, Summary of Public Meeting with Virginia Electric and Power Company Concerning a License Amendment Request to Revise Emergency Augmentation Times for North Anna Station, Units 1 & 2, and Surry Station, Units 1 & 2
ML23320A24717 November 2023Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591Probabilistic Risk Assessment
ML23304A0686 November 2023Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F
ML23297A23124 October 2023E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia FuelExemption Request
Affidavit
ML23276A62412 October 2023Summary of the Closed Meeting with PSEG Nuclear LLC and Westinghouse Electric Company to Discuss Cobalt-60 Production at Salem Nuclear Generating Station
ML23265A15128 September 2023Summary of September 12, 2023, Partially Closed Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request
ML23263B10622 September 2023R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary
ML23198A31020 July 2023July 10, 2023, Summary of Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2
ML23179A00128 June 20236/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary
ML23157A32026 June 2023Summary of April 26, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned License Amendment Request Related to Turbine Control System and Reactor Protection System CircuitryHot Short
High winds
Probabilistic Risk Assessment
Large early release frequency
ML23167A70126 June 2023Summary of Public Meeting with VEPCO Concerning a License Amendment Request to Revise Emergency Plan Staff Augmentation TimesFLEX
ML23151A5471 June 2023Public Meeting Summary - 2022 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station
ML23151A12331 May 2023Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant
ML23146A10131 May 2023Summary of May 25, 2023, Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Reduction of the Site'S Exclusion Area Boundary
ML23142A21322 May 2023Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear PlantsOpen House
ML23118A2852 May 2023Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Catawba Nuclear Station, McGuire Nuclear and Oconee Nuclear StationSubsequent License Renewal
ML23055A03524 March 2023Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels
ML23080A19021 March 2023Annual Assessment Meeting for Millstone Power Station - Meeting Summary
ML23068A15316 March 2023Summary of February 22, 2023, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request to Increase Allowable Number of Tritium Producing Burnable Absorber Rods at Watts Bar Nuclear Plant, Units 1 and 2Environmental Justice
ML23055A4569 March 2023Summary of February 15, 2023, Public Meeting with Tennessee Valley Authority Regarding Proposed Expedited License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2
ML23033A6669 February 2023Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna
ML22335A40115 December 2022Summary of December 8, 2022, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Proposed License Amendment Request to Revise TS 3.7.11 Control Room Area Chilled Water System (Cracws)
ML22309A00612 December 2022Public Non-Sensitive Meeting Summary on Clarification Call with Holtec Regarding Request for Additional Information for Indian Point Unit 2 Master Decommissioning Trust Agreement as Per Indian Point Nuclear Generating Facility Unit 1 and 2
ML22340A6668 December 2022Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, SystemsHigh winds
FLEX
Large early release frequency
ML22329A1385 December 2022Summary of Meeting with Tennessee Valley Authority Related to Planned Alternative Request WBN-2-ISI-01 for Watts Bar Nuclear Plant, Unit 2
ML22312A3521 December 2022Revised - Summary of Regulatory Audit for Alternative Request RV-02Incorporated by reference
ML22264A19914 November 2022Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 andProbabilistic Risk Assessment
ML22272A03329 September 2022Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration NozzleBoric Acid
Pressure Boundary Leakage
Dissimilar Metal Weld
ML22252A04312 September 2022Summary of August 31, 2022, Webinar with STP Nuclear Operating Company to Discuss a Proposed LAR to Revise the Dose Consequence Analysis for Main Steam Line Break and Locked Rotor Analysis Events for STP, Units 1 & 2
ML22252A1779 September 2022Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057)
ML22207B83028 July 2022Summary of July 20, 2022, Observation Public Meeting with the Tennessee Valley Authority to Discuss Planned Alternative Request RP-12 to ASME OM Code Testing for the 1B-B Centrifugal Charging Pump at Sequoyah Nuclear Plant, Unit 1
ML22187A1466 July 2022Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary
ML22167A18530 June 2022Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191Coatings
ML22168A16427 June 2022Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants
ML22153A44914 June 2022Summary of Pre-Submittal Public Meeting with PSEG Nuclear LLC to Extend Emergency Diesel Generator Allowed Outage Time
ML22147A0936 June 20222021 Annual Assessment Public Meeting SummaryPandemic
Coronavirus
COVID-19
ML22130A17020 May 2022Summary of April 21, 2022, Public Meeting to Discuss Potential Emergency Preparedness License Amendment Request
ML22131A07012 May 2022Summary of Conference Call Regarding the Spring 2022 Steam Generator Tube Inspections
ML22129A00610 May 2022Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00Surveillance Frequency Control Program
Operational leakage
ML22130A0309 May 2022Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350
ML22130A0339 May 2022Public Meeting Summary 2021 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting Number 20220349
ML22109A00420 April 2022Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear PlantsSurveillance Frequency Control Program
ML22104A22520 April 2022Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2Fitness for Duty
High winds
Exemption Request
ML22108A18418 April 2022TVA 2021 Annual Assessment Public Meeting SummaryCoronavirus
COVID-19
ML22102A16412 April 2022Annual Assessment Meeting for Millstone Power Station - Meeting Summary
ML22094A1114 April 2022Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287Coronavirus
ML22091A0901 April 2022Combined 2021 Assessment Meeting SlidesOperator Manual Action
Spent Fuel Pool Instrumentation
Coronavirus
Pressure Boundary Leakage
Fire Protection Program
ML22048B7852 March 2022Summary of February 16, 2022, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a Request for an Alternative to Requirements for Addressing Pressure Isolation Valve Leakage