Issue date | Title | Topic | |
---|---|---|---|
ML20217H571 | 15 October 1999 | Summary of 990927 Meeting with FPC Re Plant,Unit 3 Large Bore Piping Project.List of Attendees & Matl Used in Presentation Enclosed | Thermal fatigue |
ML20196J235 | 29 June 1999 | Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl | |
ML20154P901 | 14 October 1998 | Summary of 980921 Meeting W/Util to Discuss FPC Plans to Modify Emergency Feedwater Sys & High Pressure Injection Sys to Resolve Previously Identified Design Issues Re DG Loading & Operator Burden.List of Attendees Encl | |
ML20236V076 | 28 July 1998 | Summary of 980724 Meeting W/Fpc Re FPC Plans Related to Qualification of Large Bore safety-related Piping,Including Schedules for Completion of Various Aspects of Project. List of Meeting Attendees & Copies of Meeting Handouts Encl | |
ML20236S911 | 22 July 1998 | Summary of 980617 Meeting W/Florida Power Corp Re FPC Plans for Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis.List of Attendees & Meeting Handouts Encl | |
ML20236F698 | 11 June 1998 | Summary of 980513 Meeting W/Util at Crystal River Site Re Endangered & Threatened Species Info & Recent Developments at Crystal River Site.List of Attendees,Meeting Handouts & FPC Sea Turtle Rescue & Handling Guidance,Encl | |
ML20217K473 | 29 April 1998 | Summary of 980423 Meeting W/Great Bay Power Corp Re Great Bay Power Corp Response to Request for Addl Re Decommissioning Funding Assurance | |
ML20216F990 | 13 March 1998 | Summary of 980225 Meeting W/Licensee to Discuss Issues Related to Review of Licensee IPE Submittal.List of Attendees Encl | Internal Flooding |
ML20203F113 | 2 February 1998 | Summary of 980112 Meeting W/Util in Rockville,Md Re Progress Toward Resolution of Issues Specified in CAL 2-97-01,dtd 970304.List of Attendees & Copy of Handouts Presented at Meeting Encl | |
ML20203A341 | 28 January 1998 | Summary of 980108 Meeting W/Fpc in Rockville,Md Re Technical Issues Relating to Control Complex Habitability Envelope Justification for Continued Operation.List of Attendees & Meeting Handout Encl | |
ML20198L282 | 5 January 1998 | Summary of 971219 Meeting W/Util in Rockville,Md Re Decommissioning Funding Assurance.List of Attendees Encl | |
ML20199A500 | 20 December 1997 | Summary of 971215 Meeting W/Florida Power Corp in Rockville, Maryland Re TS Change Request Notice (Tscrn) 210, Small Break Loss of Coolant Accident, for Crystal River Unit 3. List of Meeting Attendees & Matl Distributed Encl | |
ML20198B234 | 11 December 1997 | Summary of 971202 Meeting W/Fpc in Rockville,Md Re Seismic Qualification of Mechanical & Electrical Equipment & Large Bore Piping & Pipe Support Calculations.List of Attendees & Meeting Handout Encl | |
ML20199F705 | 9 December 1997 | Summary of 971120 Meeting W/Licensee in Rockville,Md Re Restart Technical Issues & Status of Licensing Activities. List of Attendees & Meeting Handout Encl | Power Uprate Overspeed trip |
ML20197J996 | 5 December 1997 | Summary of 971120 Meeting W/Util in Rockville,Md Re Mgt Corrective Action & Restart Progress.List of Attendees & Meeting Handout Encl | Hot Short Ultimate heat sink Mission time Temporary Modification Exemption Request Manual Operator Action |
ML20203B313 | 25 November 1997 | Summary of 971106 Telcon W/Fpc in Rockville,Md Re Restart Issues.Due to Unforeseen Circumstances,Licensee Requested Cancellation of Meeting Scheduled for 971106 | Operability Determination |
ML20202C734 | 17 November 1997 | Summary of 971023 Meeting W/Westinghouse in Rockville,Md Re Axial Offset Anomaly (Aoa) & Seabrook Fuel Failures.Copy of non-proprietary Presentation Matl & List of Participants Encl | |
ML20199E442 | 12 November 1997 | Summary of 971028 Meeting W/Fpc in Rockville,Md Re EDG Test Plan & Amend Request Involving EDG Protective Relays.List of Meeting Attendees & Copy of Matl Distributed at Meeting Encl | |
ML20199A223 | 4 November 1997 | Summary of 971022 Meeting W/Util in Rockville,Md to Discuss 970614 Amend Request,As Supplemented by ,Involving Mitigation of Certain SBLOCA Scenarios.W/Eight Oversize Central Files Drawings,Attendance List & List of Drawings | |
ML20198R954 | 29 October 1997 | Summary of 971022 Meeting W/Util in Rockville,Md Re Licensee Corrective Action Issues & Status of Licensing Issues That Could Potentially Affect CR3 Restart Schedule.List of Attendees & Meeting Handouts Encl | Manual Operator Action |
ML20217G669 | 6 October 1997 | Summary of 970918 Meeting W/Util in Rockville,Md Re Status of Licensing Activities.Licensee Presented Overview of Structure & Usage of EOP & Planned Changes | |
ML20211D661 | 17 September 1997 | Summary of 970905 Meeting W/Util in Rockville,Md to Discuss Status of Expected & Active Licensing Submittals Re Plant, Unit 3.Updated Schedule Encl | Hot Short Safe Shutdown Mission time Exemption Request Manual Operator Action |
ML20216D084 | 3 September 1997 | Summary of 970820 Meeting of NRC Restart Panel for Crystal River 3 Facility Held Onsite Re Open Insp Item List.Open Insp Item List Encl | |
ML20217G915 | 1 August 1997 | Summary of 970721 Meeting W/Fpc in Rockville,Md Re EDG Upgrade,Efs & 10CFR50 App R & Other Design Issues.Attendance List & Meeting Handout Encl | Hot Short Safe Shutdown Power Uprate Overspeed trip |
ML20217D318 | 29 July 1997 | Summary of 970722 Plant Restart 0350 Panel Meeting W/Listed Attendees at Facility Re Status of Open Items from Insps, Restart Issues & Restart Tasks | Hot Short Unanalyzed Condition Fitness for Duty Fire Barrier Hydrostatic Coatings B.5.b Missed surveillance |
ML20149K028 | 24 July 1997 | Summary of 970722 Meeting W/Florida Power Corp in Rockville, MD Re Overview of Licensee Progress Toward Readiness for Restart,Including Issues Specified in CAL 2-97-01 .Attendance List & Meeting Handouts Encl | Hot Short Non-Destructive Examination Mission time Temporary Modification Exemption Request |
ML20148U441 | 7 July 1997 | Summary of 970624 Meeting W/Util in Rockville,Md Re Proposed License Amend Relating to High Pressure Injection,Emergency Feedwater & Emergency Diesel Generator Sys.List of Attendees & Handouts Encl | Mission time |
ML20141G171 | 27 June 1997 | Summary of Crngp Ninth Meeting Held 970618-19 at Crngp Re Status of Current Insps,Plans for Future Insps & Crngp 3 Checklist.Updated Checklist Encl | Hot Short Unanalyzed Condition Fitness for Duty Mission time Fire Barrier Missed surveillance Power Uprate |
ML20141K876 | 27 May 1997 | Summary of 970520 Meeting W/Florida Power Corp in Rockville, MD Re Status of Thermo-Lag fire-barrier Solution.List of Attendees & Meeting Handouts Encl | Safe Shutdown Fire Barrier Exemption Request |
ML20148F872 | 19 May 1997 | Summary of 970509 Crngp Restart Panel Eighth Meeting in Atlanta,Ga.Panel Members Listed | Unanalyzed Condition Fitness for Duty Mission time Fire Barrier Missed surveillance Power Uprate |
ML20138G315 | 1 May 1997 | Summary of 970423 Meeting W/Util in Rockville,Md to Discuss General Licensing Activities.Licensee Also Provided Schedule for Certain Licensing Actions & Util Internal Notification of Organizational Changes | |
ML20137R028 | 7 April 1997 | Summary of 970318 Meeting W/Fpl in Rockville,Md to Present Potential Success Path for EFW Flow & EDG Loading Concerns During SBLOCA Design Basis Scenario.List of Attendees & Handouts Encl | |
ML20217D293 | 3 April 1997 | Summary of 970321 Plant Restart Panel Seventh Meeting W/Listed Attendees on Facility Re Future Insp Schedules.Next Meeting Scheduled for 970416 | Hot Short Unanalyzed Condition Boric Acid Fitness for Duty Mission time Fire Barrier Coatings Missed surveillance New Resident Inspector Fire Protection Program Power Uprate |
ML20141J746 | 24 February 1997 | Summary of 970212 Plant Restart Panel Sixth Meeting W/Listed Attendees on Facility Site to Review Restart Items & Provide mid-week Debrief of Findings.Engineering Work Done in Response to GL 96-06 Appeared to Be Good | Fitness for Duty Fire Barrier Power Uprate |
ML20141J720 | 28 January 1997 | Summary of 970123 Meeting W/Crystal River Restart Panel at Plant Re Personnel Replacements,Planned Insp Activities & Rational for How Restart Items Are to Be Inspected | Fitness for Duty Mission time |
ML20141J708 | 14 January 1997 | Summary of 970108 Meeting W/Crystal River Restart Panel at Plant Re Plant Status,Personnel Selections,Licensee Event Rept 96-22,plan to Review Past 10CFR50.59 Reviews of Mods & Restart Check List of Open Items | Boric Acid Mission time Exemption Request Power Uprate |
ML20217D285 | 23 December 1996 | Summary of 961223 Meeting W/Crystal River Restart Panel in Atlanta,Ga Re Plant Restart.Minutes of Meeting & Checklist Encl | |
ML20141J694 | 10 December 1996 | Summary of 961203 Meeting W/Crystal River Restart Panel. Panel Reviewed Restart Issues Matrix & Characterized Each Item Either Restart or Non-Restart. Panel Also Updated Cross Reference of Issue Items Which Appear on Matrix | Unanalyzed Condition Boric Acid Fitness for Duty Fire Barrier B.5.b Missed surveillance |
ML20141J691 | 15 November 1996 | Summary of 961113 Meeting W/Crystal River Restart Panel in Atlanta,Ga.Purpose of Meeting to Develop Restart Plan, Develop Restart Task Checklist,Develop Restart Issues Checklist & to Schedule Future Meetings | Fitness for Duty Mission time Missed surveillance Operability Assessment |
ML20133F607 | 16 July 1996 | Trip Rept of 951114-960708 Visit to Underwriters Labs,Inc in Northbrook,Il Re Mecatiss Fire Barrier Sys Fire Endurance Test Program | Hot Short Safe Shutdown Fire Barrier |
ML20062K202 | 15 December 1993 | Summary of 930805 Meeting W/Licensee in Rockville,Md Re Improved TS of Remote Shutdown Sys Surveillance Requirement SR 3.3.18.2 Dealing W/Verification of Transfer Switch Capability.Viewgraphs Encl | Safe Shutdown Probabilistic Risk Assessment Backfit |
ML20058N494 | 15 December 1993 | Summary of 931130 Meeting W/Sce&G in Rockville,Md Re Licensee Upcoming SG Replacement,Scheduled to Begin Sept 1994.List of Attendees Encl | |
ML20058L983 | 13 December 1993 | Summary of 930811 Meeting W/Utils & Vendors in Rockville Re FPC Justification for Use of non-App G Methodolgy for LTOP Protection at Crystal River Unit 3.List of Attendees Encl | Anticipated operational occurrence |
ML20058G666 | 24 November 1993 | Summary of 930909 Meeting W/Licensee in Rockville,Md Re Results of Util Analysis of CR-3 SG Tubes Pulled During Last Outage.Attendees Listed in Encl 1 | Non-Destructive Examination Eddy Current Testing Liquid penetrant |
ML20058A193 | 18 November 1993 | Summary of 931110 Meeting W/Util in Rockville,Md to Discuss Operational Problems,Plant Performance,Recent Personnel & Organizational Changes,Response to 10CFR2.206 Petition & Actions Re Employee Concerns.Viewgraphs Encl | |
ML20059A594 | 14 October 1993 | Summary of 930929 Meeting W/B&W Re Generic Implications for of Steam Generator Leak for Similar Sleeves Installed at Other Facilities.List of Attendees & Meeting Handouts Encl | |
ML20058M589 | 27 September 1993 | Summary of Operating Reactors Events Meeting 93-36 on 930922 | |
ML20057B932 | 20 September 1993 | Summary of 930727 Meeting W/Util & Westinghouse Re Results Analysis of Three Tubes Pulled Form Unit 1 B SG During Last RF7.List of Meeting Attendees & Meeting Handouts Encl | |
ML20057E583 | 10 September 1993 | Summary of Operating Reactors Events Meeting 93-33 on 930901 | |
ML20056H070 | 30 August 1993 | Summary of 930526 Meeting W/Util in Rockville,Md Re FPC Program to Resolve USI A-46 (GL-87-02) & IPEEE Seismic Issues for CR-3.List of Meeting Attendees Encl | Safe Shutdown Safe Shutdown Earthquake |