MONTHYEARML20217H5711999-10-15015 October 1999 Summary of 990927 Meeting with FPC Re Plant,Unit 3 Large Bore Piping Project.List of Attendees & Matl Used in Presentation Enclosed ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20154P9011998-10-14014 October 1998 Summary of 980921 Meeting W/Util to Discuss FPC Plans to Modify Emergency Feedwater Sys & High Pressure Injection Sys to Resolve Previously Identified Design Issues Re DG Loading & Operator Burden.List of Attendees Encl ML20236V0761998-07-28028 July 1998 Summary of 980724 Meeting W/Fpc Re FPC Plans Related to Qualification of Large Bore safety-related Piping,Including Schedules for Completion of Various Aspects of Project. List of Meeting Attendees & Copies of Meeting Handouts Encl ML20236S9111998-07-22022 July 1998 Summary of 980617 Meeting W/Florida Power Corp Re FPC Plans for Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis.List of Attendees & Meeting Handouts Encl ML20236F6981998-06-11011 June 1998 Summary of 980513 Meeting W/Util at Crystal River Site Re Endangered & Threatened Species Info & Recent Developments at Crystal River Site.List of Attendees,Meeting Handouts & FPC Sea Turtle Rescue & Handling Guidance,Encl ML20216F9901998-03-13013 March 1998 Summary of 980225 Meeting W/Licensee to Discuss Issues Related to Review of Licensee IPE Submittal.List of Attendees Encl ML20203F1131998-02-0202 February 1998 Summary of 980112 Meeting W/Util in Rockville,Md Re Progress Toward Resolution of Issues Specified in CAL 2-97-01,dtd 970304.List of Attendees & Copy of Handouts Presented at Meeting Encl ML20203A3411998-01-28028 January 1998 Summary of 980108 Meeting W/Fpc in Rockville,Md Re Technical Issues Relating to Control Complex Habitability Envelope Justification for Continued Operation.List of Attendees & Meeting Handout Encl ML20199A5001997-12-20020 December 1997 Summary of 971215 Meeting W/Florida Power Corp in Rockville, Maryland Re TS Change Request Notice (Tscrn) 210, Small Break Loss of Coolant Accident, for Crystal River Unit 3. List of Meeting Attendees & Matl Distributed Encl ML20198B2341997-12-11011 December 1997 Summary of 971202 Meeting W/Fpc in Rockville,Md Re Seismic Qualification of Mechanical & Electrical Equipment & Large Bore Piping & Pipe Support Calculations.List of Attendees & Meeting Handout Encl ML20199F7051997-12-0909 December 1997 Summary of 971120 Meeting W/Licensee in Rockville,Md Re Restart Technical Issues & Status of Licensing Activities. List of Attendees & Meeting Handout Encl ML20197J9961997-12-0505 December 1997 Summary of 971120 Meeting W/Util in Rockville,Md Re Mgt Corrective Action & Restart Progress.List of Attendees & Meeting Handout Encl ML20203B3131997-11-25025 November 1997 Summary of 971106 Telcon W/Fpc in Rockville,Md Re Restart Issues.Due to Unforeseen Circumstances,Licensee Requested Cancellation of Meeting Scheduled for 971106 ML20199E4421997-11-12012 November 1997 Summary of 971028 Meeting W/Fpc in Rockville,Md Re EDG Test Plan & Amend Request Involving EDG Protective Relays.List of Meeting Attendees & Copy of Matl Distributed at Meeting Encl ML20199A2231997-11-0404 November 1997 Summary of 971022 Meeting W/Util in Rockville,Md to Discuss 970614 Amend Request,As Supplemented by ,Involving Mitigation of Certain SBLOCA Scenarios.W/Eight Oversize Central Files Drawings,Attendance List & List of Drawings ML20198R9541997-10-29029 October 1997 Summary of 971022 Meeting W/Util in Rockville,Md Re Licensee Corrective Action Issues & Status of Licensing Issues That Could Potentially Affect CR3 Restart Schedule.List of Attendees & Meeting Handouts Encl ML20217G6691997-10-0606 October 1997 Summary of 970918 Meeting W/Util in Rockville,Md Re Status of Licensing Activities.Licensee Presented Overview of Structure & Usage of EOP & Planned Changes ML20211D6611997-09-17017 September 1997 Summary of 970905 Meeting W/Util in Rockville,Md to Discuss Status of Expected & Active Licensing Submittals Re Plant, Unit 3.Updated Schedule Encl ML20216D0841997-09-0303 September 1997 Summary of 970820 Meeting of NRC Restart Panel for Crystal River 3 Facility Held Onsite Re Open Insp Item List.Open Insp Item List Encl ML20217G9151997-08-0101 August 1997 Summary of 970721 Meeting W/Fpc in Rockville,Md Re EDG Upgrade,Efs & 10CFR50 App R & Other Design Issues.Attendance List & Meeting Handout Encl ML20217D3181997-07-29029 July 1997 Summary of 970722 Plant Restart 0350 Panel Meeting W/Listed Attendees at Facility Re Status of Open Items from Insps, Restart Issues & Restart Tasks ML20149K0281997-07-24024 July 1997 Summary of 970722 Meeting W/Florida Power Corp in Rockville, MD Re Overview of Licensee Progress Toward Readiness for Restart,Including Issues Specified in CAL 2-97-01 .Attendance List & Meeting Handouts Encl ML20148U4411997-07-0707 July 1997 Summary of 970624 Meeting W/Util in Rockville,Md Re Proposed License Amend Relating to High Pressure Injection,Emergency Feedwater & Emergency Diesel Generator Sys.List of Attendees & Handouts Encl ML20141G1711997-06-27027 June 1997 Summary of Crngp Ninth Meeting Held 970618-19 at Crngp Re Status of Current Insps,Plans for Future Insps & Crngp 3 Checklist.Updated Checklist Encl ML20141K8761997-05-27027 May 1997 Summary of 970520 Meeting W/Florida Power Corp in Rockville, MD Re Status of Thermo-Lag fire-barrier Solution.List of Attendees & Meeting Handouts Encl ML20148F8721997-05-19019 May 1997 Summary of 970509 Crngp Restart Panel Eighth Meeting in Atlanta,Ga.Panel Members Listed ML20138G3151997-05-0101 May 1997 Summary of 970423 Meeting W/Util in Rockville,Md to Discuss General Licensing Activities.Licensee Also Provided Schedule for Certain Licensing Actions & Util Internal Notification of Organizational Changes ML20137R0281997-04-0707 April 1997 Summary of 970318 Meeting W/Fpl in Rockville,Md to Present Potential Success Path for EFW Flow & EDG Loading Concerns During SBLOCA Design Basis Scenario.List of Attendees & Handouts Encl ML20217D2931997-04-0303 April 1997 Summary of 970321 Plant Restart Panel Seventh Meeting W/Listed Attendees on Facility Re Future Insp Schedules.Next Meeting Scheduled for 970416 ML20141J7461997-02-24024 February 1997 Summary of 970212 Plant Restart Panel Sixth Meeting W/Listed Attendees on Facility Site to Review Restart Items & Provide mid-week Debrief of Findings.Engineering Work Done in Response to GL 96-06 Appeared to Be Good ML20141J7201997-01-28028 January 1997 Summary of 970123 Meeting W/Crystal River Restart Panel at Plant Re Personnel Replacements,Planned Insp Activities & Rational for How Restart Items Are to Be Inspected ML20141J7081997-01-14014 January 1997 Summary of 970108 Meeting W/Crystal River Restart Panel at Plant Re Plant Status,Personnel Selections,Licensee Event Rept 96-22,plan to Review Past 10CFR50.59 Reviews of Mods & Restart Check List of Open Items ML20217D2851996-12-23023 December 1996 Summary of 961223 Meeting W/Crystal River Restart Panel in Atlanta,Ga Re Plant Restart.Minutes of Meeting & Checklist Encl ML20141J6941996-12-10010 December 1996 Summary of 961203 Meeting W/Crystal River Restart Panel. Panel Reviewed Restart Issues Matrix & Characterized Each Item Either Restart or Non-Restart. Panel Also Updated Cross Reference of Issue Items Which Appear on Matrix ML20141J6911996-11-15015 November 1996 Summary of 961113 Meeting W/Crystal River Restart Panel in Atlanta,Ga.Purpose of Meeting to Develop Restart Plan, Develop Restart Task Checklist,Develop Restart Issues Checklist & to Schedule Future Meetings ML20133F6071996-07-16016 July 1996 Trip Rept of 951114-960708 Visit to Underwriters Labs,Inc in Northbrook,Il Re Mecatiss Fire Barrier Sys Fire Endurance Test Program ML20062K2021993-12-15015 December 1993 Summary of 930805 Meeting W/Licensee in Rockville,Md Re Improved TS of Remote Shutdown Sys Surveillance Requirement SR 3.3.18.2 Dealing W/Verification of Transfer Switch Capability.Viewgraphs Encl ML20058L9831993-12-13013 December 1993 Summary of 930811 Meeting W/Utils & Vendors in Rockville Re FPC Justification for Use of non-App G Methodolgy for LTOP Protection at Crystal River Unit 3.List of Attendees Encl ML20058G6661993-11-24024 November 1993 Summary of 930909 Meeting W/Licensee in Rockville,Md Re Results of Util Analysis of CR-3 SG Tubes Pulled During Last Outage.Attendees Listed in Encl 1 ML20058M5891993-09-27027 September 1993 Summary of Operating Reactors Events Meeting 93-36 on 930922 ML20057E5831993-09-10010 September 1993 Summary of Operating Reactors Events Meeting 93-33 on 930901 ML20056H0701993-08-30030 August 1993 Summary of 930526 Meeting W/Util in Rockville,Md Re FPC Program to Resolve USI A-46 (GL-87-02) & IPEEE Seismic Issues for CR-3.List of Meeting Attendees Encl ML20056D4611993-07-21021 July 1993 Summary of 930709 Meeting W/Util to Discuss Status & Schedule for Implementation of Plant New TS & NRC Enforcement Policy During Initial Phase of Implementation ML20128N6131993-02-16016 February 1993 Summary of 921204 Meeting W/Util Re Key Procurement & Commercial Grade Dedication Issues ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20246F4921989-08-24024 August 1989 Summary of 890817 Meeting W/Licensee,Mpr Assoc & ORNL to Discuss Licensee Evaluation of Decay Heat Pump ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20247A3961989-07-11011 July 1989 Summary of 890512 Meeting W/Util Re Operational Reliability of Several Components & Items Procured & Installed in Plant & Various Vendor Interface Weaknesses Identified During Insp 50-302/89-200.Handouts Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl 1999-06-29
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217H5711999-10-15015 October 1999 Summary of 990927 Meeting with FPC Re Plant,Unit 3 Large Bore Piping Project.List of Attendees & Matl Used in Presentation Enclosed ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20154P9011998-10-14014 October 1998 Summary of 980921 Meeting W/Util to Discuss FPC Plans to Modify Emergency Feedwater Sys & High Pressure Injection Sys to Resolve Previously Identified Design Issues Re DG Loading & Operator Burden.List of Attendees Encl ML20236V0761998-07-28028 July 1998 Summary of 980724 Meeting W/Fpc Re FPC Plans Related to Qualification of Large Bore safety-related Piping,Including Schedules for Completion of Various Aspects of Project. List of Meeting Attendees & Copies of Meeting Handouts Encl ML20236S9111998-07-22022 July 1998 Summary of 980617 Meeting W/Florida Power Corp Re FPC Plans for Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis.List of Attendees & Meeting Handouts Encl ML20236F6981998-06-11011 June 1998 Summary of 980513 Meeting W/Util at Crystal River Site Re Endangered & Threatened Species Info & Recent Developments at Crystal River Site.List of Attendees,Meeting Handouts & FPC Sea Turtle Rescue & Handling Guidance,Encl ML20216F9901998-03-13013 March 1998 Summary of 980225 Meeting W/Licensee to Discuss Issues Related to Review of Licensee IPE Submittal.List of Attendees Encl ML20203F1131998-02-0202 February 1998 Summary of 980112 Meeting W/Util in Rockville,Md Re Progress Toward Resolution of Issues Specified in CAL 2-97-01,dtd 970304.List of Attendees & Copy of Handouts Presented at Meeting Encl ML20203A3411998-01-28028 January 1998 Summary of 980108 Meeting W/Fpc in Rockville,Md Re Technical Issues Relating to Control Complex Habitability Envelope Justification for Continued Operation.List of Attendees & Meeting Handout Encl ML20199A5001997-12-20020 December 1997 Summary of 971215 Meeting W/Florida Power Corp in Rockville, Maryland Re TS Change Request Notice (Tscrn) 210, Small Break Loss of Coolant Accident, for Crystal River Unit 3. List of Meeting Attendees & Matl Distributed Encl ML20198B2341997-12-11011 December 1997 Summary of 971202 Meeting W/Fpc in Rockville,Md Re Seismic Qualification of Mechanical & Electrical Equipment & Large Bore Piping & Pipe Support Calculations.List of Attendees & Meeting Handout Encl ML20199F7051997-12-0909 December 1997 Summary of 971120 Meeting W/Licensee in Rockville,Md Re Restart Technical Issues & Status of Licensing Activities. List of Attendees & Meeting Handout Encl ML20197J9961997-12-0505 December 1997 Summary of 971120 Meeting W/Util in Rockville,Md Re Mgt Corrective Action & Restart Progress.List of Attendees & Meeting Handout Encl ML20203B3131997-11-25025 November 1997 Summary of 971106 Telcon W/Fpc in Rockville,Md Re Restart Issues.Due to Unforeseen Circumstances,Licensee Requested Cancellation of Meeting Scheduled for 971106 ML20199E4421997-11-12012 November 1997 Summary of 971028 Meeting W/Fpc in Rockville,Md Re EDG Test Plan & Amend Request Involving EDG Protective Relays.List of Meeting Attendees & Copy of Matl Distributed at Meeting Encl ML20199A2231997-11-0404 November 1997 Summary of 971022 Meeting W/Util in Rockville,Md to Discuss 970614 Amend Request,As Supplemented by ,Involving Mitigation of Certain SBLOCA Scenarios.W/Eight Oversize Central Files Drawings,Attendance List & List of Drawings ML20198R9541997-10-29029 October 1997 Summary of 971022 Meeting W/Util in Rockville,Md Re Licensee Corrective Action Issues & Status of Licensing Issues That Could Potentially Affect CR3 Restart Schedule.List of Attendees & Meeting Handouts Encl ML20217G6691997-10-0606 October 1997 Summary of 970918 Meeting W/Util in Rockville,Md Re Status of Licensing Activities.Licensee Presented Overview of Structure & Usage of EOP & Planned Changes ML20211D6611997-09-17017 September 1997 Summary of 970905 Meeting W/Util in Rockville,Md to Discuss Status of Expected & Active Licensing Submittals Re Plant, Unit 3.Updated Schedule Encl ML20216D0841997-09-0303 September 1997 Summary of 970820 Meeting of NRC Restart Panel for Crystal River 3 Facility Held Onsite Re Open Insp Item List.Open Insp Item List Encl ML20217G9151997-08-0101 August 1997 Summary of 970721 Meeting W/Fpc in Rockville,Md Re EDG Upgrade,Efs & 10CFR50 App R & Other Design Issues.Attendance List & Meeting Handout Encl ML20217D3181997-07-29029 July 1997 Summary of 970722 Plant Restart 0350 Panel Meeting W/Listed Attendees at Facility Re Status of Open Items from Insps, Restart Issues & Restart Tasks ML20149K0281997-07-24024 July 1997 Summary of 970722 Meeting W/Florida Power Corp in Rockville, MD Re Overview of Licensee Progress Toward Readiness for Restart,Including Issues Specified in CAL 2-97-01 .Attendance List & Meeting Handouts Encl ML20148U4411997-07-0707 July 1997 Summary of 970624 Meeting W/Util in Rockville,Md Re Proposed License Amend Relating to High Pressure Injection,Emergency Feedwater & Emergency Diesel Generator Sys.List of Attendees & Handouts Encl ML20141G1711997-06-27027 June 1997 Summary of Crngp Ninth Meeting Held 970618-19 at Crngp Re Status of Current Insps,Plans for Future Insps & Crngp 3 Checklist.Updated Checklist Encl ML20141K8761997-05-27027 May 1997 Summary of 970520 Meeting W/Florida Power Corp in Rockville, MD Re Status of Thermo-Lag fire-barrier Solution.List of Attendees & Meeting Handouts Encl ML20148F8721997-05-19019 May 1997 Summary of 970509 Crngp Restart Panel Eighth Meeting in Atlanta,Ga.Panel Members Listed ML20138G3151997-05-0101 May 1997 Summary of 970423 Meeting W/Util in Rockville,Md to Discuss General Licensing Activities.Licensee Also Provided Schedule for Certain Licensing Actions & Util Internal Notification of Organizational Changes ML20137R0281997-04-0707 April 1997 Summary of 970318 Meeting W/Fpl in Rockville,Md to Present Potential Success Path for EFW Flow & EDG Loading Concerns During SBLOCA Design Basis Scenario.List of Attendees & Handouts Encl ML20217D2931997-04-0303 April 1997 Summary of 970321 Plant Restart Panel Seventh Meeting W/Listed Attendees on Facility Re Future Insp Schedules.Next Meeting Scheduled for 970416 ML20141J7461997-02-24024 February 1997 Summary of 970212 Plant Restart Panel Sixth Meeting W/Listed Attendees on Facility Site to Review Restart Items & Provide mid-week Debrief of Findings.Engineering Work Done in Response to GL 96-06 Appeared to Be Good ML20141J7201997-01-28028 January 1997 Summary of 970123 Meeting W/Crystal River Restart Panel at Plant Re Personnel Replacements,Planned Insp Activities & Rational for How Restart Items Are to Be Inspected ML20141J7081997-01-14014 January 1997 Summary of 970108 Meeting W/Crystal River Restart Panel at Plant Re Plant Status,Personnel Selections,Licensee Event Rept 96-22,plan to Review Past 10CFR50.59 Reviews of Mods & Restart Check List of Open Items ML20217D2851996-12-23023 December 1996 Summary of 961223 Meeting W/Crystal River Restart Panel in Atlanta,Ga Re Plant Restart.Minutes of Meeting & Checklist Encl ML20141J6941996-12-10010 December 1996 Summary of 961203 Meeting W/Crystal River Restart Panel. Panel Reviewed Restart Issues Matrix & Characterized Each Item Either Restart or Non-Restart. Panel Also Updated Cross Reference of Issue Items Which Appear on Matrix ML20141J6911996-11-15015 November 1996 Summary of 961113 Meeting W/Crystal River Restart Panel in Atlanta,Ga.Purpose of Meeting to Develop Restart Plan, Develop Restart Task Checklist,Develop Restart Issues Checklist & to Schedule Future Meetings ML20062K2021993-12-15015 December 1993 Summary of 930805 Meeting W/Licensee in Rockville,Md Re Improved TS of Remote Shutdown Sys Surveillance Requirement SR 3.3.18.2 Dealing W/Verification of Transfer Switch Capability.Viewgraphs Encl ML20058L9831993-12-13013 December 1993 Summary of 930811 Meeting W/Utils & Vendors in Rockville Re FPC Justification for Use of non-App G Methodolgy for LTOP Protection at Crystal River Unit 3.List of Attendees Encl ML20058G6661993-11-24024 November 1993 Summary of 930909 Meeting W/Licensee in Rockville,Md Re Results of Util Analysis of CR-3 SG Tubes Pulled During Last Outage.Attendees Listed in Encl 1 ML20058M5891993-09-27027 September 1993 Summary of Operating Reactors Events Meeting 93-36 on 930922 ML20057E5831993-09-10010 September 1993 Summary of Operating Reactors Events Meeting 93-33 on 930901 ML20056H0701993-08-30030 August 1993 Summary of 930526 Meeting W/Util in Rockville,Md Re FPC Program to Resolve USI A-46 (GL-87-02) & IPEEE Seismic Issues for CR-3.List of Meeting Attendees Encl ML20056D4611993-07-21021 July 1993 Summary of 930709 Meeting W/Util to Discuss Status & Schedule for Implementation of Plant New TS & NRC Enforcement Policy During Initial Phase of Implementation ML20128N6131993-02-16016 February 1993 Summary of 921204 Meeting W/Util Re Key Procurement & Commercial Grade Dedication Issues ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20246F4921989-08-24024 August 1989 Summary of 890817 Meeting W/Licensee,Mpr Assoc & ORNL to Discuss Licensee Evaluation of Decay Heat Pump ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20247A3961989-07-11011 July 1989 Summary of 890512 Meeting W/Util Re Operational Reliability of Several Components & Items Procured & Installed in Plant & Various Vendor Interface Weaknesses Identified During Insp 50-302/89-200.Handouts Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators 1999-06-29
[Table view] |
Text
,
LICENSEE: Florida Power Corporation May 1,1997 FACILITY: Crystal River Unit 3 (CR-3)
SUBJECT:
SUMMARY
OF MEETING ON APRIL 23, 1997, REGARDING GENERAL LICENSING ACTIVITIES On April 23, 1997, B. Gutherman, Licensing Manager of the Florida Power Corporation (FPC), licensee for Crystal River Nuclear Plant, Unit 3, met with I L. Raghavan, Licensing Project Manager, Office of Nuclear Reactor Regulation, at NRC Headquarters in Rockville, Maryland. The status of active licensing 1
actions related to Crystal River Unit 3, were discussed. As part of the '
discussion, the licensee also provided a schedule for certain licensing l 1
actions, and FPC's internal notification of organizational changes. These l
documents were provided for general information purposes only and are enclosed. The discussions were general working-level in nature and did not l l
result in specific action items. l L. Ragh v P oject Manager Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation ,
Docket No. 50-302
Enclosure:
As Stated cc w/ enclosure: See next page Distribution HARD COPY Docket File PUBLIC t
stal-River Reading pq ACRS E-Mail S. Collins /F. Miraglia (WTR,FJM)
R. Zimmerman (RPZ)
S. Varga (SAV,RCN)
Nag FILE CENTER COPY J. Zwolinski (JAZ)
E.' Jordan (JKR)
G. Tracy (GMT)
K. Landis(KDL) 0 000
,,n ,3 4 4
S. Cahill(SJC2)
J. Johnson, RII
, Document Name: G:\ CRYSTAL \970423. SUM Office PM:PDII-3 LA:PDII-3; PD:PDII-3, Name LRaghavan k BCl A AM FHebdond Date 7/l/97 04k/97 h / I /97 Copy h/No Yes iehNo 9705060259 970501 0FFICIAL RECORDTOPY PDR ADOCK 05000302 P PDR
- s. .
Florida Power Corporation CRYSTAL RIVER UNIT N0. 3 GENERATING PLANT cc:
Mr. R. Alexander Glenn Senior Resident Inspector Corporate Counsel Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commission MAC-A5A 6745 N. Tallahassee Road P.O. Box 14042 Crystal River, Florida 34428 St. Petersburg, Florida 33733-4042 Regional Administrator, Region II Mr. Bruce J. Hickle, Director U.S. Nuclear Regulatory Commission Nuclear Plant Operations (NA2C) 101 Marietta Street NW., Suite 2900 Florida Power Corporation Atlanta, Georgia 30323 Crystal River Energy Complex 15760 W. Power Line Street Mr. John P. Cowan '
Crystal River, Florida 34428-6708 Vice President - Nuclear Production (SA2C)
Mr. Robert B. Borsum Florida Power Corporation B&W Nuclear Technologies Crystal River Energy Complex 1700 Rockville Pike, Suite 525 15760 W. Power Line Street Ro^ckville, Maryland 20852 Crystal River, Florida 34428-6708 Mr. Bill Passetti Mr. Roy A. Anderson Office of Radiation Control Senior Vic' President, Department of Health and Nuclear 05. rations Rehabilitative Services Florida Power Corporation 1317 Winewood Blvd. ATTN: Manager, Nuclear Licensing Tallahassee, Florida 32399-0700 Crystal River Energy Complex (SA2A) 15760 W. Power Line Street Attorney General Crystal River, Florida 34428-6708 Department of Legal Affairs The Capitol Mr. Kerry Landis Tallahassee, Florida 32304 U.S. Nuclear Regulatory Commission 61 forsyth Street, SW., Atlanta, GA Mr. Joe Myers, Director 30303-3415-0199 Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Iverness, Florida 34450-4245 Mr. David F. Kunsemiller, Director i' Nuclear Operations Site Support (SA2A)
Florida Power Corporation Crystal River Energy Complex 15760 W. Power Line Street Crystal River, Florida 34428-6708 J
- p; o J W STRAIGHT TALK
{ STRAIGHT TALK -. Organizational Changes 1
l I am very pleased to announce several organimational changes that will occur over the next several months.
l l These moves substantially strengthen our ability to manage the current outage and establish a long term j improvement plan. -
2 In order to put our site-wide restart efforts under the responsibility of one person, Bruce Hickle will become i 4 the Director Restart. Bruce will continue to report to the Vice President Nuclear Production and be I l responsible for all aspects of the activities leading to restart. He will also be responsible for the development of i the Startup and Power Ascension Program and the Long Term Improvement Plan. Bruce is uniquely qualified l , for this position due to his extensive Crystal River experience, including Director Nuclear Plant Operations.
His demonstrated leadership skills and plant knowledge will be critical to the success of our recovery efforts.
f,
- Succeeding Bruce will be Charles (Chip) Pardee. Chip is currently the Operations Manager at the Brunswick l Nuclear Plant and holds an active license at Brunswick. Prior to this, Chip held the position of Manager Technical Support. Before joining Carolina Power & Light (CP&L), he had been loaned to CP&L from the Institute of Nuclear Power Operations (INPO) as an on-shift Startup Director during Brunswick's power i ascension program in the 1994 recovery of Unit 1. Chip had previously worked for Knolls Atomic Power
} Laboratory as a Shift Supervisor and a manager in Maintenance. After his arrival at CR-3 later this month, Chip will complete system specific training, simulator operations, and on-shift familiarization. This is =~W l to take approximately 3 months.
j Bob Grazio will be joining us as the Director Regulatory Affairs. The Director Regulatory Affairs will be
! responsible for alllicensing and regulatory interface. This position replaces the current position of Director
, Site Support. Bob has been the Engineering Manager at Brunswick Nuclear Plant during the Brunswick l recovery. Prior to joining CP&L, Bob worked for Florida Power and Light (FP&L) with responsibility for the
! regulatory aspect of the Turkey Point Plant improvement. Previous to the FP&L experience, Bob worked at
- Pilgrim in the technical and regulatory area during the Pilgrim recovery in the latter 1980's. Bob will report to
) CR-3 later this month.
l
! Mark Marano will be joining us in late April as the Director Site Services which will include responsibility for l Information Technology, Document Control, Contract Services, Financial Planning, Long Range Business i Planning, and other corporate interface areas. Mark has recently served as the Manager of the corrective l action program at Public Service Electric and Gas. He was responsible for developing and implementing the l Salem recovery plan in this area. Prior to this position, Mark served as the Manager Site Support with CP&L,
- with responsiMaities similar to those in his new position. Before joining CP&L, Mark worked for Florida
! Power & Light in an information technology related position. Bill Conklin will continue in his present position i as Director Nuclear Operations Materials and Controls.
i 4'
Some additional organizational shifting will likely occur as these people come to understand our particular
! situation and strive to make our organization more effective.
- I encourage each of you to give me feedback as to where you see our organization can improve its effectiveness.
- I will listen. If you have any questions, please ask.
l t
I j
i April 3,1997 ENCLOSIJRE
Crystal River Unit #3 Restart Plan
-i r -i m-* - -ece -i
.---=., : += :--,w, :-a a , - :
ea-- a n--. t a=-'a l La a 1 ] e a--'a I _ La a=~'a L Le ) 4 i j
_la a==' no.., t j a a--.ug Lower Loop MARE
_ s MsV_ _ A MSiv_ ,,,,.
w
- e. v o OTSG Eddy Current & Tube Pulle t
~
i -
Install R.B. Penetration MAR g..... :
DGl EFW Interaction .
g...... ,
System Lineupe. Heetup Aa d Testiry MAR & Wark Pkg. Prep EFW Cavitating Venturi MAR :
4............ : Startup/Powor MAR 4. Work Pkg. Properation FWP-7 Standby Generator MAR Escalation g.....
_ EFP Defeat Switch MAR _ -
HPilCavitating Venturi MAR
- : i
,4 JGDG Work TJGDG Work EFV-12 Mt 4 .== un enen .sw EFV-12 MOV MAR ' C,""" * ,,
- : .=a .n
.we.m a emea . .s ,
" Bettery SP 8 g SP
_ EFV-12 Velve MA_R :
~
dEM 'BWp' inverter MAR I
=A* gWork I '
. r D . System Vent AR EFIC Camp Module 6AAR '8" se Side
- en- ,
_ ASV-204 MAR . E.S. Pumgi PTL MAR-MUV-27 Auto Clostre MAR !
2 D.H. System Vent MAR MUV-103 Seat Leekage MAR . .
- - g.A.' Sidei t HPl Socire MAR
_ EFP-2 Flow Indcotion i BAR : : ,
_ 6
_RWPCrcione Separotot MAR e !
Review Desian Besie 1
_ _ ,,I s. =-_- stan " - -wa' --
NRC Restert Authorization l ta- 1
. i i
TECH SPEC Changes /Appr wel . . [ntegrated Verification
. g , g w v
. l 1
. 'Werk Centrcl tIsk during tha cuttga is to sch:dula snd werk:
All open corrective maintenance work requests (not requiring defuel).
{- All outage SPs and PMs necessary to support a 1999 refuel outage (not requiring defuel).
All online SPs and PMs due prior to January 1998.
l If you have additional work to be done this outage remember it needs to be in the schedule five (5) weeks prior to implementation.
(-
Upcoming Outage Work Windows May 1997: ('A' & 'B' Trains Protected)
Start A CWP to help cool the discharge canal .
Continue Work on the Containment Penetration MAR Continue work on the EFW Cavitating Venturi MAR Continue work on the EFV 12 MAR Continue work on MUV-103 MAR Refurbish 'B' Side MSIVs Refurbish 'B' Side MSSVs June 1997: ('A' & 'B' Trains Protected)(Lowered Loop )
Continue Work on the Containment Penetration MAR Complete EFV-12 MAR Complete MUV 103 MAR Complete EFW Cavitating Venturi MAR Commence FWP-7 Standby Generator MAR t
Refurbish 'A' Side MSIVs Refurbish 'B' Side MSSVs j Commence OTSG Eddy Current Work July 1997: ('A' & 'B' Trains Protected)(Lowered Loop)
/
Continue Work on the Containment Penetration MAR Complete OTSG Eddy Current work and perform tube pulls
- August 1997: ('B' DH Train Protected)
Continue work on the Containment Penetration MAR Perform 'A' EGDG KW Meter MAR Perform 'A' EGDG 3400 KW Test Run I Perform 'A' EGDG Teardown Inspection Perform SP-907A and SP-354A Repair DHV-21 & DHV-34 Repair 'A' Side RW valves including RWV-32 i 'A' Side of the D.H. System Vent MAR
- A' Side of the RWP Cyclone Separator MAR September 1997: ('A' Train Protected)
Complete work on the Containment Penetration MAR Perform 'B' EGDG KW Meter MAR Perform 'B' EGDG 3400 KW Test Run Perform 'B' EGDG Teardown inspection Perform SP 9078 and SP-354B
'B' Side of the D.H. System Vent MAR
'B' Side of the RWP Cyclone Separator MAR
( Start and test the secondary side systems i
I