Summary of 970423 Meeting W/Util in Rockville,Md to Discuss General Licensing Activities.Licensee Also Provided Schedule for Certain Licensing Actions & Util Internal Notification of Organizational Changes
ML20138G315
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/01/1997
From: Raghavan L
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9705060259
Download: ML20138G315 (6)


Text

,

LICENSEE: Florida Power Corporation May 1,1997 FACILITY: Crystal River Unit 3 (CR-3)

SUBJECT:

SUMMARY

OF MEETING ON APRIL 23, 1997, REGARDING GENERAL LICENSING ACTIVITIES On April 23, 1997, B. Gutherman, Licensing Manager of the Florida Power Corporation (FPC), licensee for Crystal River Nuclear Plant, Unit 3, met with I L. Raghavan, Licensing Project Manager, Office of Nuclear Reactor Regulation, at NRC Headquarters in Rockville, Maryland. The status of active licensing 1

actions related to Crystal River Unit 3, were discussed. As part of the '

discussion, the licensee also provided a schedule for certain licensing l 1

actions, and FPC's internal notification of organizational changes. These l

documents were provided for general information purposes only and are enclosed. The discussions were general working-level in nature and did not l l

result in specific action items. l L. Ragh v P oject Manager Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation ,

Docket No. 50-302

Enclosure:

As Stated cc w/ enclosure: See next page Distribution HARD COPY Docket File PUBLIC t

stal-River Reading pq ACRS E-Mail S. Collins /F. Miraglia (WTR,FJM)

R. Zimmerman (RPZ)

S. Varga (SAV,RCN)

Nag FILE CENTER COPY J. Zwolinski (JAZ)

E.' Jordan (JKR)

G. Tracy (GMT)

K. Landis(KDL) 0 000

,,n ,3 4 4

S. Cahill(SJC2)

J. Johnson, RII

, Document Name: G:\ CRYSTAL \970423. SUM Office PM:PDII-3 LA:PDII-3; PD:PDII-3, Name LRaghavan k BCl A AM FHebdond Date 7/l/97 04k/97 h / I /97 Copy h/No Yes iehNo 9705060259 970501 0FFICIAL RECORDTOPY PDR ADOCK 05000302 P PDR

s. .

Florida Power Corporation CRYSTAL RIVER UNIT N0. 3 GENERATING PLANT cc:

Mr. R. Alexander Glenn Senior Resident Inspector Corporate Counsel Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commission MAC-A5A 6745 N. Tallahassee Road P.O. Box 14042 Crystal River, Florida 34428 St. Petersburg, Florida 33733-4042 Regional Administrator, Region II Mr. Bruce J. Hickle, Director U.S. Nuclear Regulatory Commission Nuclear Plant Operations (NA2C) 101 Marietta Street NW., Suite 2900 Florida Power Corporation Atlanta, Georgia 30323 Crystal River Energy Complex 15760 W. Power Line Street Mr. John P. Cowan '

Crystal River, Florida 34428-6708 Vice President - Nuclear Production (SA2C)

Mr. Robert B. Borsum Florida Power Corporation B&W Nuclear Technologies Crystal River Energy Complex 1700 Rockville Pike, Suite 525 15760 W. Power Line Street Ro^ckville, Maryland 20852 Crystal River, Florida 34428-6708 Mr. Bill Passetti Mr. Roy A. Anderson Office of Radiation Control Senior Vic' President, Department of Health and Nuclear 05. rations Rehabilitative Services Florida Power Corporation 1317 Winewood Blvd. ATTN: Manager, Nuclear Licensing Tallahassee, Florida 32399-0700 Crystal River Energy Complex (SA2A) 15760 W. Power Line Street Attorney General Crystal River, Florida 34428-6708 Department of Legal Affairs The Capitol Mr. Kerry Landis Tallahassee, Florida 32304 U.S. Nuclear Regulatory Commission 61 forsyth Street, SW., Atlanta, GA Mr. Joe Myers, Director 30303-3415-0199 Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Iverness, Florida 34450-4245 Mr. David F. Kunsemiller, Director i' Nuclear Operations Site Support (SA2A)

Florida Power Corporation Crystal River Energy Complex 15760 W. Power Line Street Crystal River, Florida 34428-6708 J

p; o J W STRAIGHT TALK

{ STRAIGHT TALK -. Organizational Changes 1

l I am very pleased to announce several organimational changes that will occur over the next several months.

l l These moves substantially strengthen our ability to manage the current outage and establish a long term j improvement plan. -

2 In order to put our site-wide restart efforts under the responsibility of one person, Bruce Hickle will become i 4 the Director Restart. Bruce will continue to report to the Vice President Nuclear Production and be I l responsible for all aspects of the activities leading to restart. He will also be responsible for the development of i the Startup and Power Ascension Program and the Long Term Improvement Plan. Bruce is uniquely qualified l , for this position due to his extensive Crystal River experience, including Director Nuclear Plant Operations.

His demonstrated leadership skills and plant knowledge will be critical to the success of our recovery efforts.

f,

Succeeding Bruce will be Charles (Chip) Pardee. Chip is currently the Operations Manager at the Brunswick l Nuclear Plant and holds an active license at Brunswick. Prior to this, Chip held the position of Manager Technical Support. Before joining Carolina Power & Light (CP&L), he had been loaned to CP&L from the Institute of Nuclear Power Operations (INPO) as an on-shift Startup Director during Brunswick's power i ascension program in the 1994 recovery of Unit 1. Chip had previously worked for Knolls Atomic Power

} Laboratory as a Shift Supervisor and a manager in Maintenance. After his arrival at CR-3 later this month, Chip will complete system specific training, simulator operations, and on-shift familiarization. This is =~W l to take approximately 3 months.

j Bob Grazio will be joining us as the Director Regulatory Affairs. The Director Regulatory Affairs will be

! responsible for alllicensing and regulatory interface. This position replaces the current position of Director

, Site Support. Bob has been the Engineering Manager at Brunswick Nuclear Plant during the Brunswick l recovery. Prior to joining CP&L, Bob worked for Florida Power and Light (FP&L) with responsibility for the

! regulatory aspect of the Turkey Point Plant improvement. Previous to the FP&L experience, Bob worked at

Pilgrim in the technical and regulatory area during the Pilgrim recovery in the latter 1980's. Bob will report to

) CR-3 later this month.

l

! Mark Marano will be joining us in late April as the Director Site Services which will include responsibility for l Information Technology, Document Control, Contract Services, Financial Planning, Long Range Business i Planning, and other corporate interface areas. Mark has recently served as the Manager of the corrective l action program at Public Service Electric and Gas. He was responsible for developing and implementing the l Salem recovery plan in this area. Prior to this position, Mark served as the Manager Site Support with CP&L,

with responsiMaities similar to those in his new position. Before joining CP&L, Mark worked for Florida

! Power & Light in an information technology related position. Bill Conklin will continue in his present position i as Director Nuclear Operations Materials and Controls.

i 4'

Some additional organizational shifting will likely occur as these people come to understand our particular

! situation and strive to make our organization more effective.

I encourage each of you to give me feedback as to where you see our organization can improve its effectiveness.
I will listen. If you have any questions, please ask.

l t

I j

i April 3,1997 ENCLOSIJRE

Crystal River Unit #3 Restart Plan

-i r -i m-* - -ece -i

.---=.,  : +=  :--,w,  :-a a , -  :

ea-- a n--. t a=-'a l La a 1 ] e a--'a I _ La a=~'a L Le ) 4 i j

_la a==' no.., t j a a--.ug Lower Loop MARE

_ s MsV_ _ A MSiv_ ,,,,.

w

e. v o OTSG Eddy Current & Tube Pulle t

~

i -

Install R.B. Penetration MAR g.....  :

DGl EFW Interaction .

g...... ,

System Lineupe. Heetup Aa d Testiry MAR & Wark Pkg. Prep EFW Cavitating Venturi MAR  :

4............  : Startup/Powor MAR 4. Work Pkg. Properation FWP-7 Standby Generator MAR Escalation g.....

_ EFP Defeat Switch MAR _ -

HPilCavitating Venturi MAR

: i

,4 JGDG Work TJGDG Work EFV-12 Mt 4 .== un enen .sw EFV-12 MOV MAR ' C,""" * ,,

: .=a .n

.we.m a emea . .s ,

" Bettery SP 8 g SP

_ EFV-12 Velve MA_R  :

~

dEM 'BWp' inverter MAR I

=A* gWork I '

. r D . System Vent AR EFIC Camp Module 6AAR '8" se Side

- en- ,

_ ASV-204 MAR . E.S. Pumgi PTL MAR-MUV-27 Auto Clostre MAR  !

2 D.H. System Vent MAR MUV-103 Seat Leekage MAR . .

- - g.A.' Sidei t HPl Socire MAR

_ EFP-2 Flow Indcotion i BAR  :  : ,

_ 6

_RWPCrcione Separotot MAR e  !

Review Desian Besie 1

_ _ ,,I s. =-_- stan " - -wa' --

NRC Restert Authorization l ta- 1

. i i

TECH SPEC Changes /Appr wel . . [ntegrated Verification

    • ~ ~ - _ _

. g , g w v

. l 1

. 'Werk Centrcl tIsk during tha cuttga is to sch:dula snd werk:

All open corrective maintenance work requests (not requiring defuel).

{- All outage SPs and PMs necessary to support a 1999 refuel outage (not requiring defuel).

All online SPs and PMs due prior to January 1998.

l If you have additional work to be done this outage remember it needs to be in the schedule five (5) weeks prior to implementation.

(-

Upcoming Outage Work Windows May 1997: ('A' & 'B' Trains Protected)

Start A CWP to help cool the discharge canal .

Continue Work on the Containment Penetration MAR Continue work on the EFW Cavitating Venturi MAR Continue work on the EFV 12 MAR Continue work on MUV-103 MAR Refurbish 'B' Side MSIVs Refurbish 'B' Side MSSVs June 1997: ('A' & 'B' Trains Protected)(Lowered Loop )

Continue Work on the Containment Penetration MAR Complete EFV-12 MAR Complete MUV 103 MAR Complete EFW Cavitating Venturi MAR Commence FWP-7 Standby Generator MAR t

Refurbish 'A' Side MSIVs Refurbish 'B' Side MSSVs j Commence OTSG Eddy Current Work July 1997: ('A' & 'B' Trains Protected)(Lowered Loop)

/

Continue Work on the Containment Penetration MAR Complete OTSG Eddy Current work and perform tube pulls

August 1997: ('B' DH Train Protected)

Continue work on the Containment Penetration MAR Perform 'A' EGDG KW Meter MAR Perform 'A' EGDG 3400 KW Test Run I Perform 'A' EGDG Teardown Inspection Perform SP-907A and SP-354A Repair DHV-21 & DHV-34 Repair 'A' Side RW valves including RWV-32 i 'A' Side of the D.H. System Vent MAR

  • A' Side of the RWP Cyclone Separator MAR September 1997: ('A' Train Protected)

Complete work on the Containment Penetration MAR Perform 'B' EGDG KW Meter MAR Perform 'B' EGDG 3400 KW Test Run Perform 'B' EGDG Teardown inspection Perform SP 9078 and SP-354B

'B' Side of the D.H. System Vent MAR

'B' Side of the RWP Cyclone Separator MAR

( Start and test the secondary side systems i

I