Summary of 930526 Meeting W/Util in Rockville,Md Re FPC Program to Resolve USI A-46 (GL-87-02) & IPEEE Seismic Issues for CR-3.List of Meeting Attendees Encl
ML20056H070
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/30/1993
From: Silver H
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, NUDOCS 9309080176
Download: ML20056H070 (4)


Text

- - -

(,f " g a, .,9, E E UNITED STATES 3( Pf1!

NUCLEAR REGULATORY COMMISSION

%,; % . j# wAssinctou, o.c. 2osss-oooi

    • "* August 30, 1993 Docket No. 50-302 l

LICENSEE: Florida Power Corporation (FPC)

FACILITY: Crystal River Unit 3 (CR-3)

SUBJECT:

SUMMARY

OF MEETING ON MAY 26, 1993, REGARDING SEISMIC ISSUES AT CR-3  ;

Representatives of FPC met with members of the staff on May 26, 1993, to discuss FPC's program to resolve USI A-46 (GL 87-02) and individual plant examination of externally initiated events (IPEEE) seismic issues for CR-3. '

The enclosure contains a list of attendees.

FPC noted that the CR-3 seismic design is conservative,.that the CR-3 safe shutdown earthquake (SSE) is lower than other generic implementation procedure (GIP) plants, and that the probability of exceeding the SSE is low. FPC ,

is preparing a plant-specific procedure which is intended to implement the GIP with appropriate modifications. The procedure is viewed by FPC as a cost-effective version of the GIP suitable for low-seismic plants. It is also i intended to satisfy the seismic requirements of IPEEE. l

\

The plant walkdown is scheduled for the spring of 1995. FPC's intention is to rely on the judgment of trained engineers to perform whatever action they deem necessary (e.g., calculation, torque measurement, observation). No specific requirements will be called out in the procedure. Peer review will be performed on the same basis. Because the design of cable trays is very conservative, they will not be walked down. With regard to relays, FPC noted that there is no history of inadvertent operation below I.4g and that operators will be able to handle any problems which might arise. Only relay cabinet mounting and inter-cabinet bolting will be reviewed. No attempt will be made to identify relays which may be sensitive to low g levels. It was suggested that FPC select six worst-case examples of relay chatter and determine if operators could indeed handle each situation giving due consideration to time available, procedures in place, operator training, etc.

FPC stated that a detailed relay review for CR-3 is not justified from a value-impact standpoint.

Costs of stricter conformance to the GIP were presented by the licensee as follows:

o to identify safe shutdown relays only - $100,000, not including i wal kdown o to fully implement the GIP-$1-2 million o full implementation of the GIP versus using the plant-specific procedure - several hundred thousand dollars 0 $ M N Mfd @Y l

\ >

a L

c l

l l

FPC will submit its technical report and plant-specific procedure, which will i be reviewed by the NRC staff (not yet received as of August 26,1993). NRC '

will provide a request for additional information on floor response spectra (done July 9, 1993). l (Original Signed By)

Harley Silver, Project Manager Project Directorate II-2 -

Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page ,

Distribyliga Docket File-NRC & Local PDRs PDII-2 RF T. Murley/F. Miraglia J. Partlow G. Lainas S. Varga H. Berkow  ;

H. Silver '

E. Tana 0GC E. Jordan, MNBB 3702 L. Marsh, 13-D-18 H. Ashar, 7-H-15 P. Chen, 7-E-23 J. Richardson, 7-D-26 J. Norberg, 7-E-23 D. Dorman, 14-H-17 i H. Garg, 8-H-3 B. Liaw, 7-D-26 R. Rothman, 7-H-15  !

M. McBrearty, 7-E-23 l K. Desai, 8-E-23 J. Donohew, 11-D-23 D. Jeng, 7-H-15  :

K. Manoly, 7-E-23 l ACRS (10) l L. Plisco, RII M. Sinkule, RII 0FC LA:PDil-2 PM:PDIly2 D:PDII-2 NAME ETafhO HS$yh HBekow'/ I DATE q po/93 1 /s-/93 Q S t/93 OfF1CIAL RECORD COPY FILENAME: A:MTGNOTS.CR3 -

SEISMIC ISSVES MEETING 5/25/93 +

ATTENDEES Harley Silver NRR PDII-2 L. B. Marsh NRR PDIII-I Hans Ashar ECGB/DE/NRR P. Y. Chen NRR/DE/EMEB Ken Wilson FPC/NL Brian Gutherman FPC/ Nuclear Engineering Alfred Friend FPC/ Licensing Paul Smith The Readiness Operation 1 Glen Pugh FPC/ Engineering Harry Johnson Programmatic Solutions Jim Richardson NRR/DE ,

Jim Norberg NRR/DE/EMEB Herbert Berkow NRR PDII-2 Dan Dorman NRR/PDI-3 Hukam Garg NRR/DRCH/HICB B. D. Liaw NRR/DE R. L. Rothman NRR/DR/ECGB Michael McBrearty NRR/DE/EMEB Kulin D. Desai NRR/SRXB Jack Donohew NRR/PDAR David C. Jeng NRR/DE/ECGB Kamal Manoly NRR/DE/ EMES f

l i

1

I l l

l Crystal River. Unit No.3 Florida Power Corporation Generating Plant CC:

l Mr. Gerald A. Williams Mr. Joe Myers, Director l Corporate Counsel Div. of Emergency Preparedness Florida Power Corporation Department of Community Affairs MAC-ASA 2740 Centerview Drive P. O. Box 14042 Tallahassee, Florida 32399-2100 i St. Petersburg, Florida 33733 l Mr. Bruce J. Hickle, Director Chairman Nuclear Plant Operations Board of County Commissioners  !

Florida Power Corporation Citrus County P. O. Box 219-NA-2C 110 North Apopka Avenue Crystal River, Florida 34423-0219 Inverness, Florida 32650 Mr. Robert B. Borsum Mr. Rolf C. Widell, Director B&W Nuclear Technologies Nuclear Operations Site Support 1700 Rockville Pike, Suite 525 Florida Power Corporation Rockville, Maryland 20852 P. O. Box 219-NA-21 Crystal River, Florida 34423-0219 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Mr. Percy M. Beard, Jr.

101 Marietta Street N.W., Suite 2900 Sr. Vice President Atlanta, Georgia 30323 Nuclear Operations ATIN: Manager, Nuclear Operations Mr. Bill Passetti Licensing Office of Radiation Control P.O. Box 219-NA-21 Department of Health and Crystal River, Florida 34423-0219 Rehabilitative Services 1317 Winewood Blvd. Senior Resident Inspector Tallahassee, Florida 32399-0700 Crystal River Unit 3 U.S. Nuclear Regulatory Administrator Commission Department of Environmental Regulation 6745 N. Tallahassee Road Power Plant Siting Section Crystal River, Florida 34428 State of Florida 2600 Blair Stone Road Mr. Gary Boldt Tallahaseee, Florida 32301 Vice President, Nuclear Production Attorney General Florida Power Corporation Department of Legal Affairs P.O. Box 219-SA-2C The Capitol Crystal River, Florida 34423-0219 Tallahassee, Florida 32304 b