|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20217H5711999-10-15015 October 1999 Summary of 990927 Meeting with FPC Re Plant,Unit 3 Large Bore Piping Project.List of Attendees & Matl Used in Presentation Enclosed ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20154P9011998-10-14014 October 1998 Summary of 980921 Meeting W/Util to Discuss FPC Plans to Modify Emergency Feedwater Sys & High Pressure Injection Sys to Resolve Previously Identified Design Issues Re DG Loading & Operator Burden.List of Attendees Encl ML20236V0761998-07-28028 July 1998 Summary of 980724 Meeting W/Fpc Re FPC Plans Related to Qualification of Large Bore safety-related Piping,Including Schedules for Completion of Various Aspects of Project. List of Meeting Attendees & Copies of Meeting Handouts Encl ML20236S9111998-07-22022 July 1998 Summary of 980617 Meeting W/Florida Power Corp Re FPC Plans for Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis.List of Attendees & Meeting Handouts Encl ML20236F6981998-06-11011 June 1998 Summary of 980513 Meeting W/Util at Crystal River Site Re Endangered & Threatened Species Info & Recent Developments at Crystal River Site.List of Attendees,Meeting Handouts & FPC Sea Turtle Rescue & Handling Guidance,Encl ML20216F9901998-03-13013 March 1998 Summary of 980225 Meeting W/Licensee to Discuss Issues Related to Review of Licensee IPE Submittal.List of Attendees Encl ML20203F1131998-02-0202 February 1998 Summary of 980112 Meeting W/Util in Rockville,Md Re Progress Toward Resolution of Issues Specified in CAL 2-97-01,dtd 970304.List of Attendees & Copy of Handouts Presented at Meeting Encl ML20203A3411998-01-28028 January 1998 Summary of 980108 Meeting W/Fpc in Rockville,Md Re Technical Issues Relating to Control Complex Habitability Envelope Justification for Continued Operation.List of Attendees & Meeting Handout Encl ML20199A5001997-12-20020 December 1997 Summary of 971215 Meeting W/Florida Power Corp in Rockville, Maryland Re TS Change Request Notice (Tscrn) 210, Small Break Loss of Coolant Accident, for Crystal River Unit 3. List of Meeting Attendees & Matl Distributed Encl ML20198B2341997-12-11011 December 1997 Summary of 971202 Meeting W/Fpc in Rockville,Md Re Seismic Qualification of Mechanical & Electrical Equipment & Large Bore Piping & Pipe Support Calculations.List of Attendees & Meeting Handout Encl ML20199F7051997-12-0909 December 1997 Summary of 971120 Meeting W/Licensee in Rockville,Md Re Restart Technical Issues & Status of Licensing Activities. List of Attendees & Meeting Handout Encl ML20197J9961997-12-0505 December 1997 Summary of 971120 Meeting W/Util in Rockville,Md Re Mgt Corrective Action & Restart Progress.List of Attendees & Meeting Handout Encl ML20203B3131997-11-25025 November 1997 Summary of 971106 Telcon W/Fpc in Rockville,Md Re Restart Issues.Due to Unforeseen Circumstances,Licensee Requested Cancellation of Meeting Scheduled for 971106 ML20199E4421997-11-12012 November 1997 Summary of 971028 Meeting W/Fpc in Rockville,Md Re EDG Test Plan & Amend Request Involving EDG Protective Relays.List of Meeting Attendees & Copy of Matl Distributed at Meeting Encl ML20199A2231997-11-0404 November 1997 Summary of 971022 Meeting W/Util in Rockville,Md to Discuss 970614 Amend Request,As Supplemented by ,Involving Mitigation of Certain SBLOCA Scenarios.W/Eight Oversize Central Files Drawings,Attendance List & List of Drawings ML20198R9541997-10-29029 October 1997 Summary of 971022 Meeting W/Util in Rockville,Md Re Licensee Corrective Action Issues & Status of Licensing Issues That Could Potentially Affect CR3 Restart Schedule.List of Attendees & Meeting Handouts Encl ML20217G6691997-10-0606 October 1997 Summary of 970918 Meeting W/Util in Rockville,Md Re Status of Licensing Activities.Licensee Presented Overview of Structure & Usage of EOP & Planned Changes ML20211D6611997-09-17017 September 1997 Summary of 970905 Meeting W/Util in Rockville,Md to Discuss Status of Expected & Active Licensing Submittals Re Plant, Unit 3.Updated Schedule Encl ML20216D0841997-09-0303 September 1997 Summary of 970820 Meeting of NRC Restart Panel for Crystal River 3 Facility Held Onsite Re Open Insp Item List.Open Insp Item List Encl ML20217G9151997-08-0101 August 1997 Summary of 970721 Meeting W/Fpc in Rockville,Md Re EDG Upgrade,Efs & 10CFR50 App R & Other Design Issues.Attendance List & Meeting Handout Encl ML20217D3181997-07-29029 July 1997 Summary of 970722 Plant Restart 0350 Panel Meeting W/Listed Attendees at Facility Re Status of Open Items from Insps, Restart Issues & Restart Tasks ML20149K0281997-07-24024 July 1997 Summary of 970722 Meeting W/Florida Power Corp in Rockville, MD Re Overview of Licensee Progress Toward Readiness for Restart,Including Issues Specified in CAL 2-97-01 .Attendance List & Meeting Handouts Encl ML20148U4411997-07-0707 July 1997 Summary of 970624 Meeting W/Util in Rockville,Md Re Proposed License Amend Relating to High Pressure Injection,Emergency Feedwater & Emergency Diesel Generator Sys.List of Attendees & Handouts Encl ML20141G1711997-06-27027 June 1997 Summary of Crngp Ninth Meeting Held 970618-19 at Crngp Re Status of Current Insps,Plans for Future Insps & Crngp 3 Checklist.Updated Checklist Encl ML20141K8761997-05-27027 May 1997 Summary of 970520 Meeting W/Florida Power Corp in Rockville, MD Re Status of Thermo-Lag fire-barrier Solution.List of Attendees & Meeting Handouts Encl ML20148F8721997-05-19019 May 1997 Summary of 970509 Crngp Restart Panel Eighth Meeting in Atlanta,Ga.Panel Members Listed ML20138G3151997-05-0101 May 1997 Summary of 970423 Meeting W/Util in Rockville,Md to Discuss General Licensing Activities.Licensee Also Provided Schedule for Certain Licensing Actions & Util Internal Notification of Organizational Changes ML20137R0281997-04-0707 April 1997 Summary of 970318 Meeting W/Fpl in Rockville,Md to Present Potential Success Path for EFW Flow & EDG Loading Concerns During SBLOCA Design Basis Scenario.List of Attendees & Handouts Encl ML20217D2931997-04-0303 April 1997 Summary of 970321 Plant Restart Panel Seventh Meeting W/Listed Attendees on Facility Re Future Insp Schedules.Next Meeting Scheduled for 970416 ML20141J7461997-02-24024 February 1997 Summary of 970212 Plant Restart Panel Sixth Meeting W/Listed Attendees on Facility Site to Review Restart Items & Provide mid-week Debrief of Findings.Engineering Work Done in Response to GL 96-06 Appeared to Be Good ML20141J7201997-01-28028 January 1997 Summary of 970123 Meeting W/Crystal River Restart Panel at Plant Re Personnel Replacements,Planned Insp Activities & Rational for How Restart Items Are to Be Inspected ML20141J7081997-01-14014 January 1997 Summary of 970108 Meeting W/Crystal River Restart Panel at Plant Re Plant Status,Personnel Selections,Licensee Event Rept 96-22,plan to Review Past 10CFR50.59 Reviews of Mods & Restart Check List of Open Items ML20217D2851996-12-23023 December 1996 Summary of 961223 Meeting W/Crystal River Restart Panel in Atlanta,Ga Re Plant Restart.Minutes of Meeting & Checklist Encl ML20141J6941996-12-10010 December 1996 Summary of 961203 Meeting W/Crystal River Restart Panel. Panel Reviewed Restart Issues Matrix & Characterized Each Item Either Restart or Non-Restart. Panel Also Updated Cross Reference of Issue Items Which Appear on Matrix ML20141J6911996-11-15015 November 1996 Summary of 961113 Meeting W/Crystal River Restart Panel in Atlanta,Ga.Purpose of Meeting to Develop Restart Plan, Develop Restart Task Checklist,Develop Restart Issues Checklist & to Schedule Future Meetings ML20133F6071996-07-16016 July 1996 Trip Rept of 951114-960708 Visit to Underwriters Labs,Inc in Northbrook,Il Re Mecatiss Fire Barrier Sys Fire Endurance Test Program ML20062K2021993-12-15015 December 1993 Summary of 930805 Meeting W/Licensee in Rockville,Md Re Improved TS of Remote Shutdown Sys Surveillance Requirement SR 3.3.18.2 Dealing W/Verification of Transfer Switch Capability.Viewgraphs Encl ML20058L9831993-12-13013 December 1993 Summary of 930811 Meeting W/Utils & Vendors in Rockville Re FPC Justification for Use of non-App G Methodolgy for LTOP Protection at Crystal River Unit 3.List of Attendees Encl ML20058G6661993-11-24024 November 1993 Summary of 930909 Meeting W/Licensee in Rockville,Md Re Results of Util Analysis of CR-3 SG Tubes Pulled During Last Outage.Attendees Listed in Encl 1 ML20058M5891993-09-27027 September 1993 Summary of Operating Reactors Events Meeting 93-36 on 930922 ML20057E5831993-09-10010 September 1993 Summary of Operating Reactors Events Meeting 93-33 on 930901 ML20056H0701993-08-30030 August 1993 Summary of 930526 Meeting W/Util in Rockville,Md Re FPC Program to Resolve USI A-46 (GL-87-02) & IPEEE Seismic Issues for CR-3.List of Meeting Attendees Encl ML20056D4611993-07-21021 July 1993 Summary of 930709 Meeting W/Util to Discuss Status & Schedule for Implementation of Plant New TS & NRC Enforcement Policy During Initial Phase of Implementation ML20128N6131993-02-16016 February 1993 Summary of 921204 Meeting W/Util Re Key Procurement & Commercial Grade Dedication Issues ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20246F4921989-08-24024 August 1989 Summary of 890817 Meeting W/Licensee,Mpr Assoc & ORNL to Discuss Licensee Evaluation of Decay Heat Pump ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20247A3961989-07-11011 July 1989 Summary of 890512 Meeting W/Util Re Operational Reliability of Several Components & Items Procured & Installed in Plant & Various Vendor Interface Weaknesses Identified During Insp 50-302/89-200.Handouts Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl 1999-06-29
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217H5711999-10-15015 October 1999 Summary of 990927 Meeting with FPC Re Plant,Unit 3 Large Bore Piping Project.List of Attendees & Matl Used in Presentation Enclosed ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20154P9011998-10-14014 October 1998 Summary of 980921 Meeting W/Util to Discuss FPC Plans to Modify Emergency Feedwater Sys & High Pressure Injection Sys to Resolve Previously Identified Design Issues Re DG Loading & Operator Burden.List of Attendees Encl ML20236V0761998-07-28028 July 1998 Summary of 980724 Meeting W/Fpc Re FPC Plans Related to Qualification of Large Bore safety-related Piping,Including Schedules for Completion of Various Aspects of Project. List of Meeting Attendees & Copies of Meeting Handouts Encl ML20236S9111998-07-22022 July 1998 Summary of 980617 Meeting W/Florida Power Corp Re FPC Plans for Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis.List of Attendees & Meeting Handouts Encl ML20236F6981998-06-11011 June 1998 Summary of 980513 Meeting W/Util at Crystal River Site Re Endangered & Threatened Species Info & Recent Developments at Crystal River Site.List of Attendees,Meeting Handouts & FPC Sea Turtle Rescue & Handling Guidance,Encl ML20216F9901998-03-13013 March 1998 Summary of 980225 Meeting W/Licensee to Discuss Issues Related to Review of Licensee IPE Submittal.List of Attendees Encl ML20203F1131998-02-0202 February 1998 Summary of 980112 Meeting W/Util in Rockville,Md Re Progress Toward Resolution of Issues Specified in CAL 2-97-01,dtd 970304.List of Attendees & Copy of Handouts Presented at Meeting Encl ML20203A3411998-01-28028 January 1998 Summary of 980108 Meeting W/Fpc in Rockville,Md Re Technical Issues Relating to Control Complex Habitability Envelope Justification for Continued Operation.List of Attendees & Meeting Handout Encl ML20199A5001997-12-20020 December 1997 Summary of 971215 Meeting W/Florida Power Corp in Rockville, Maryland Re TS Change Request Notice (Tscrn) 210, Small Break Loss of Coolant Accident, for Crystal River Unit 3. List of Meeting Attendees & Matl Distributed Encl ML20198B2341997-12-11011 December 1997 Summary of 971202 Meeting W/Fpc in Rockville,Md Re Seismic Qualification of Mechanical & Electrical Equipment & Large Bore Piping & Pipe Support Calculations.List of Attendees & Meeting Handout Encl ML20199F7051997-12-0909 December 1997 Summary of 971120 Meeting W/Licensee in Rockville,Md Re Restart Technical Issues & Status of Licensing Activities. List of Attendees & Meeting Handout Encl ML20197J9961997-12-0505 December 1997 Summary of 971120 Meeting W/Util in Rockville,Md Re Mgt Corrective Action & Restart Progress.List of Attendees & Meeting Handout Encl ML20203B3131997-11-25025 November 1997 Summary of 971106 Telcon W/Fpc in Rockville,Md Re Restart Issues.Due to Unforeseen Circumstances,Licensee Requested Cancellation of Meeting Scheduled for 971106 ML20199E4421997-11-12012 November 1997 Summary of 971028 Meeting W/Fpc in Rockville,Md Re EDG Test Plan & Amend Request Involving EDG Protective Relays.List of Meeting Attendees & Copy of Matl Distributed at Meeting Encl ML20199A2231997-11-0404 November 1997 Summary of 971022 Meeting W/Util in Rockville,Md to Discuss 970614 Amend Request,As Supplemented by ,Involving Mitigation of Certain SBLOCA Scenarios.W/Eight Oversize Central Files Drawings,Attendance List & List of Drawings ML20198R9541997-10-29029 October 1997 Summary of 971022 Meeting W/Util in Rockville,Md Re Licensee Corrective Action Issues & Status of Licensing Issues That Could Potentially Affect CR3 Restart Schedule.List of Attendees & Meeting Handouts Encl ML20217G6691997-10-0606 October 1997 Summary of 970918 Meeting W/Util in Rockville,Md Re Status of Licensing Activities.Licensee Presented Overview of Structure & Usage of EOP & Planned Changes ML20211D6611997-09-17017 September 1997 Summary of 970905 Meeting W/Util in Rockville,Md to Discuss Status of Expected & Active Licensing Submittals Re Plant, Unit 3.Updated Schedule Encl ML20216D0841997-09-0303 September 1997 Summary of 970820 Meeting of NRC Restart Panel for Crystal River 3 Facility Held Onsite Re Open Insp Item List.Open Insp Item List Encl ML20217G9151997-08-0101 August 1997 Summary of 970721 Meeting W/Fpc in Rockville,Md Re EDG Upgrade,Efs & 10CFR50 App R & Other Design Issues.Attendance List & Meeting Handout Encl ML20217D3181997-07-29029 July 1997 Summary of 970722 Plant Restart 0350 Panel Meeting W/Listed Attendees at Facility Re Status of Open Items from Insps, Restart Issues & Restart Tasks ML20149K0281997-07-24024 July 1997 Summary of 970722 Meeting W/Florida Power Corp in Rockville, MD Re Overview of Licensee Progress Toward Readiness for Restart,Including Issues Specified in CAL 2-97-01 .Attendance List & Meeting Handouts Encl ML20148U4411997-07-0707 July 1997 Summary of 970624 Meeting W/Util in Rockville,Md Re Proposed License Amend Relating to High Pressure Injection,Emergency Feedwater & Emergency Diesel Generator Sys.List of Attendees & Handouts Encl ML20141G1711997-06-27027 June 1997 Summary of Crngp Ninth Meeting Held 970618-19 at Crngp Re Status of Current Insps,Plans for Future Insps & Crngp 3 Checklist.Updated Checklist Encl ML20141K8761997-05-27027 May 1997 Summary of 970520 Meeting W/Florida Power Corp in Rockville, MD Re Status of Thermo-Lag fire-barrier Solution.List of Attendees & Meeting Handouts Encl ML20148F8721997-05-19019 May 1997 Summary of 970509 Crngp Restart Panel Eighth Meeting in Atlanta,Ga.Panel Members Listed ML20138G3151997-05-0101 May 1997 Summary of 970423 Meeting W/Util in Rockville,Md to Discuss General Licensing Activities.Licensee Also Provided Schedule for Certain Licensing Actions & Util Internal Notification of Organizational Changes ML20137R0281997-04-0707 April 1997 Summary of 970318 Meeting W/Fpl in Rockville,Md to Present Potential Success Path for EFW Flow & EDG Loading Concerns During SBLOCA Design Basis Scenario.List of Attendees & Handouts Encl ML20217D2931997-04-0303 April 1997 Summary of 970321 Plant Restart Panel Seventh Meeting W/Listed Attendees on Facility Re Future Insp Schedules.Next Meeting Scheduled for 970416 ML20141J7461997-02-24024 February 1997 Summary of 970212 Plant Restart Panel Sixth Meeting W/Listed Attendees on Facility Site to Review Restart Items & Provide mid-week Debrief of Findings.Engineering Work Done in Response to GL 96-06 Appeared to Be Good ML20141J7201997-01-28028 January 1997 Summary of 970123 Meeting W/Crystal River Restart Panel at Plant Re Personnel Replacements,Planned Insp Activities & Rational for How Restart Items Are to Be Inspected ML20141J7081997-01-14014 January 1997 Summary of 970108 Meeting W/Crystal River Restart Panel at Plant Re Plant Status,Personnel Selections,Licensee Event Rept 96-22,plan to Review Past 10CFR50.59 Reviews of Mods & Restart Check List of Open Items ML20217D2851996-12-23023 December 1996 Summary of 961223 Meeting W/Crystal River Restart Panel in Atlanta,Ga Re Plant Restart.Minutes of Meeting & Checklist Encl ML20141J6941996-12-10010 December 1996 Summary of 961203 Meeting W/Crystal River Restart Panel. Panel Reviewed Restart Issues Matrix & Characterized Each Item Either Restart or Non-Restart. Panel Also Updated Cross Reference of Issue Items Which Appear on Matrix ML20141J6911996-11-15015 November 1996 Summary of 961113 Meeting W/Crystal River Restart Panel in Atlanta,Ga.Purpose of Meeting to Develop Restart Plan, Develop Restart Task Checklist,Develop Restart Issues Checklist & to Schedule Future Meetings ML20062K2021993-12-15015 December 1993 Summary of 930805 Meeting W/Licensee in Rockville,Md Re Improved TS of Remote Shutdown Sys Surveillance Requirement SR 3.3.18.2 Dealing W/Verification of Transfer Switch Capability.Viewgraphs Encl ML20058L9831993-12-13013 December 1993 Summary of 930811 Meeting W/Utils & Vendors in Rockville Re FPC Justification for Use of non-App G Methodolgy for LTOP Protection at Crystal River Unit 3.List of Attendees Encl ML20058G6661993-11-24024 November 1993 Summary of 930909 Meeting W/Licensee in Rockville,Md Re Results of Util Analysis of CR-3 SG Tubes Pulled During Last Outage.Attendees Listed in Encl 1 ML20058M5891993-09-27027 September 1993 Summary of Operating Reactors Events Meeting 93-36 on 930922 ML20057E5831993-09-10010 September 1993 Summary of Operating Reactors Events Meeting 93-33 on 930901 ML20056H0701993-08-30030 August 1993 Summary of 930526 Meeting W/Util in Rockville,Md Re FPC Program to Resolve USI A-46 (GL-87-02) & IPEEE Seismic Issues for CR-3.List of Meeting Attendees Encl ML20056D4611993-07-21021 July 1993 Summary of 930709 Meeting W/Util to Discuss Status & Schedule for Implementation of Plant New TS & NRC Enforcement Policy During Initial Phase of Implementation ML20128N6131993-02-16016 February 1993 Summary of 921204 Meeting W/Util Re Key Procurement & Commercial Grade Dedication Issues ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20246F4921989-08-24024 August 1989 Summary of 890817 Meeting W/Licensee,Mpr Assoc & ORNL to Discuss Licensee Evaluation of Decay Heat Pump ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20247A3961989-07-11011 July 1989 Summary of 890512 Meeting W/Util Re Operational Reliability of Several Components & Items Procured & Installed in Plant & Various Vendor Interface Weaknesses Identified During Insp 50-302/89-200.Handouts Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators 1999-06-29
[Table view] |
Text
- - -
(,f " g a, .,9, E E UNITED STATES 3( Pf1!
NUCLEAR REGULATORY COMMISSION
%,; % . j# wAssinctou, o.c. 2osss-oooi
- "* August 30, 1993 Docket No. 50-302 l
LICENSEE: Florida Power Corporation (FPC)
FACILITY: Crystal River Unit 3 (CR-3)
SUBJECT:
SUMMARY
OF MEETING ON MAY 26, 1993, REGARDING SEISMIC ISSUES AT CR-3 ;
Representatives of FPC met with members of the staff on May 26, 1993, to discuss FPC's program to resolve USI A-46 (GL 87-02) and individual plant examination of externally initiated events (IPEEE) seismic issues for CR-3. '
The enclosure contains a list of attendees.
FPC noted that the CR-3 seismic design is conservative,.that the CR-3 safe shutdown earthquake (SSE) is lower than other generic implementation procedure (GIP) plants, and that the probability of exceeding the SSE is low. FPC ,
is preparing a plant-specific procedure which is intended to implement the GIP with appropriate modifications. The procedure is viewed by FPC as a cost-effective version of the GIP suitable for low-seismic plants. It is also i intended to satisfy the seismic requirements of IPEEE. l
\
The plant walkdown is scheduled for the spring of 1995. FPC's intention is to rely on the judgment of trained engineers to perform whatever action they deem necessary (e.g., calculation, torque measurement, observation). No specific requirements will be called out in the procedure. Peer review will be performed on the same basis. Because the design of cable trays is very conservative, they will not be walked down. With regard to relays, FPC noted that there is no history of inadvertent operation below I.4g and that operators will be able to handle any problems which might arise. Only relay cabinet mounting and inter-cabinet bolting will be reviewed. No attempt will be made to identify relays which may be sensitive to low g levels. It was suggested that FPC select six worst-case examples of relay chatter and determine if operators could indeed handle each situation giving due consideration to time available, procedures in place, operator training, etc.
FPC stated that a detailed relay review for CR-3 is not justified from a value-impact standpoint.
Costs of stricter conformance to the GIP were presented by the licensee as follows:
o to identify safe shutdown relays only - $100,000, not including i wal kdown o to fully implement the GIP-$1-2 million o full implementation of the GIP versus using the plant-specific procedure - several hundred thousand dollars 0 $ M N Mfd @Y l
\ >
a L
c l
l l
FPC will submit its technical report and plant-specific procedure, which will i be reviewed by the NRC staff (not yet received as of August 26,1993). NRC '
will provide a request for additional information on floor response spectra (done July 9, 1993). l (Original Signed By)
Harley Silver, Project Manager Project Directorate II-2 -
Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page ,
Distribyliga Docket File-NRC & Local PDRs PDII-2 RF T. Murley/F. Miraglia J. Partlow G. Lainas S. Varga H. Berkow ;
H. Silver '
E. Tana 0GC E. Jordan, MNBB 3702 L. Marsh, 13-D-18 H. Ashar, 7-H-15 P. Chen, 7-E-23 J. Richardson, 7-D-26 J. Norberg, 7-E-23 D. Dorman, 14-H-17 i H. Garg, 8-H-3 B. Liaw, 7-D-26 R. Rothman, 7-H-15 !
M. McBrearty, 7-E-23 l K. Desai, 8-E-23 J. Donohew, 11-D-23 D. Jeng, 7-H-15 :
K. Manoly, 7-E-23 l ACRS (10) l L. Plisco, RII M. Sinkule, RII 0FC LA:PDil-2 PM:PDIly2 D:PDII-2 NAME ETafhO HS$yh HBekow'/ I DATE q po/93 1 /s-/93 Q S t/93 OfF1CIAL RECORD COPY FILENAME: A:MTGNOTS.CR3 -
SEISMIC ISSVES MEETING 5/25/93 +
ATTENDEES Harley Silver NRR PDII-2 L. B. Marsh NRR PDIII-I Hans Ashar ECGB/DE/NRR P. Y. Chen NRR/DE/EMEB Ken Wilson FPC/NL Brian Gutherman FPC/ Nuclear Engineering Alfred Friend FPC/ Licensing Paul Smith The Readiness Operation 1 Glen Pugh FPC/ Engineering Harry Johnson Programmatic Solutions Jim Richardson NRR/DE ,
Jim Norberg NRR/DE/EMEB Herbert Berkow NRR PDII-2 Dan Dorman NRR/PDI-3 Hukam Garg NRR/DRCH/HICB B. D. Liaw NRR/DE R. L. Rothman NRR/DR/ECGB Michael McBrearty NRR/DE/EMEB Kulin D. Desai NRR/SRXB Jack Donohew NRR/PDAR David C. Jeng NRR/DE/ECGB Kamal Manoly NRR/DE/ EMES f
l i
1
I l l
l Crystal River. Unit No.3 Florida Power Corporation Generating Plant CC:
l Mr. Gerald A. Williams Mr. Joe Myers, Director l Corporate Counsel Div. of Emergency Preparedness Florida Power Corporation Department of Community Affairs MAC-ASA 2740 Centerview Drive P. O. Box 14042 Tallahassee, Florida 32399-2100 i St. Petersburg, Florida 33733 l Mr. Bruce J. Hickle, Director Chairman Nuclear Plant Operations Board of County Commissioners !
Florida Power Corporation Citrus County P. O. Box 219-NA-2C 110 North Apopka Avenue Crystal River, Florida 34423-0219 Inverness, Florida 32650 Mr. Robert B. Borsum Mr. Rolf C. Widell, Director B&W Nuclear Technologies Nuclear Operations Site Support 1700 Rockville Pike, Suite 525 Florida Power Corporation Rockville, Maryland 20852 P. O. Box 219-NA-21 Crystal River, Florida 34423-0219 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Mr. Percy M. Beard, Jr.
101 Marietta Street N.W., Suite 2900 Sr. Vice President Atlanta, Georgia 30323 Nuclear Operations ATIN: Manager, Nuclear Operations Mr. Bill Passetti Licensing Office of Radiation Control P.O. Box 219-NA-21 Department of Health and Crystal River, Florida 34423-0219 Rehabilitative Services 1317 Winewood Blvd. Senior Resident Inspector Tallahassee, Florida 32399-0700 Crystal River Unit 3 U.S. Nuclear Regulatory Administrator Commission Department of Environmental Regulation 6745 N. Tallahassee Road Power Plant Siting Section Crystal River, Florida 34428 State of Florida 2600 Blair Stone Road Mr. Gary Boldt Tallahaseee, Florida 32301 Vice President, Nuclear Production Attorney General Florida Power Corporation Department of Legal Affairs P.O. Box 219-SA-2C The Capitol Crystal River, Florida 34423-0219 Tallahassee, Florida 32304 b