Summary of 971120 Meeting W/Licensee in Rockville,Md Re Restart Technical Issues & Status of Licensing Activities. List of Attendees & Meeting Handout Encl
ML20199F705
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/09/1997
From: Raghavan L
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9802040083
Download: ML20199F705 (50)


Text

_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

December 9 - 1997 sh LICENSEE:

Florida Power Corporation FACILITY:

' Crystal River Unit 3 (CR-3)

SUBJECT:

SUMMARY

OF MEETING ON NOVEMBER 20, 199)

RESTART TECHNICAL ISSUES AND STATUS OF LICENSING l

ACTIVITIES On November 20, 1997, representatives of the Florida Power Corporation (FPC),

licensee for Crystr.1 River Nuclear Plant, Unit 3 (CR3), met with U.S. Nuclear Regulatory Commission (NRC) staff members at their Headquarters in Rockville, Maryland. is a list of attendees. is a copy of the handouts presented at the meeting, FPC presented technical details, and implementation status of several design issues. The discussions wre general working-level in nature and did not resu't in specific action items.

L. IffgNNN, YrTf[chYManager Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-302

Enclosures:

1.

Attendees List l

2.

Meeting handout cc w/ enclosures:

See next page Document Name: G:\\ CRYSTAL \\971120. SUM Office PM:PDII-3 LA:PDII-3 PD:PDII-3 Name LRaghavan d BClaytofsM FHebdonk

_Date 12

/97 12/Q /97 12/9 /97 Copy

%/No Yes YeshNo) 0FFICIAL RECORD COPY YI me m eewacon f

.m j!829888RZuajjg2 ill ll ll ll ll llll ll m

,a w

gem aag a

p *-

UNITED STATES g

-]

NUCLEAR REGULATORY COMMISSION o

e WASHINGTON. D.C. 2WScoot

,..... /

December 9, 1997 l

LICENSEE:

Florida Power Corporation FACILITY:

Crystal River Unit 3

SUBJECT:

SUMMARY

OF MEETING ON NOVEMBER 20, 1997 RESTART TECHNICAL ISSUES AND STATUS OF LICENSING ACTIVITIES On November 20, 1997, representatives of the Florida Power Corporation (FPC),

licensee for Crystal River Nuclear Plant, Unit 3 (CR3), met with U.S. Nuclear Regulatory Commission (NRC) staff members at their Headquarters in Rockville, Maryland.

Enclosure I is a list of attendees. is a copy of the handouts presented at the meeting.

FPC presented technical details, and implementation status of several design issues. The discussions were general working-level in nature and did not result in specific action items.

l t

1 Ragha

,Yivject ~iiadager Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-302

Enclosures:

1.

Attendees List 2.

Meeting handout cc w/ enclosures:

See next page i

4 0

Florida Power Corporation CRYSTAL RIVER UNIT NO. 3 GENERATING PLANT cc:

Mr. R. Alexander Clenn Mr. Robert E. Grazio, Director Corporate Counsel Nuclear Regulatory Affairs (SA2A)

Florida Power Corporation Florida Power Corporation MAC-A5A Crystal River Energy Complex P.O. Box 14042 15760 W. Power Line Street St. Petersburg, Florida 33733-4042 Crystal River, Florida 34428-6708 Mr. Charles Pardee, Director Senior Resident Inspector Nuclear Plant Operations (N%2C)

Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commission Crystal River Energy Complex 6745 N. Tallahassee Road 15760 W. Power Line Street Crystal River, Florida 34428 Crystal River, Florida 34428-6708 Mr. James S. Baumstark Mr. Bruce J. Hickle, Director Director, Juality Programs (SA20)

Director, Restart (NA20)

Florida Power Corporation Florida Power Corporation Crystal River Energy Complex Crystal River Energy Complex 15760 W. Power Line Street 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Regional Administrator, Region II Mr. Robert B. Borsum U.S. Nuclear Regulatory Commission Framatome Technologies Inc.

61 Forsyth Street, SW., Suite 23T85 1700 Rockville Pike, Suite 525 Atlanta, GA 30303-3415 Rockville, Maryland 20852 Mr. John P. Cowan Mr. Bill Passetti Vice President - Nuclear Production Office of Radiation Control (NA2E)

Department of llealth and Florida Power Corporation Rehabilitative Services Crystal River Energy Complex l

1317 Winewood Blvd.

15760 W. Power Line Street Tallahassee, Florida 32399-0700 Crystal River, Florida 34428-6708 Attorney General Mr. Roy A. Anderson Department of Legal Affairs 3enior Vice President I

The Capitol Nuclear Operations Tallahassee, Florida 32304 Florida Power Corporation ATTN: Manager, Nuclear Licensing Mr. Joe Myers, Director Crystal River Energy Complex (SA2A)

Division of Emergency Preparedness 15760 W. Power Line Street Department of Community Affairs Crystal River, Florida 34428-6708 2740 Ceriterview Drive Tallahassee, Florida 32399-2100 Mr. Kerry Landis U.S. Nuclear Regulatory Commission Chairman 61 Forsyth Street, SW., Suite 23T85 Board of County Commissioners Atlanta, GA 30303-3415 Citrus County 110 North Apopka Avenue Iverness, Florida 34450-4245

.'l

SUBJECT:

SUMMARY

OF MEETING OF NOVEMBER 20,l1997 RESTART TECHNICAL ISSUES AND-STATUS OF LICENSING ACTIVITIES-Distribution HARD COPY Docket File PUBLIC-Crystal River Reading OGC-

~ACRS-L.-Raghavan J. Johnson, Ril

-E-Mail w/ Enclosure 1 _

S. Collins /F. Miraglia (SJC1.FJM) 4 R. Zimmerman (RPZ)

B. Boger-(BAB2,RCN)

J. Zwolinski (JAZ) l-K.Landis(KDL}

F. Hebdon (FJH, B. Clayton J. Joudan, Ril T. Martin (e-mail to SLM2) lL. Trocine, EDO (LXT)

S. Flanders

-S. Cahill S. LeVai E. Connell

}

CRYSTAL RIVER 3 MEETINfa NOVEMBER 20. 1997 t{gg Oraanization I,. Raghavan NRC/NRR Fred Hebdon NRC/NRR Steve Cahill NRC/ SRI Kerry Landis NRC/Ril Scott Flanders NRC/NRR Steve LeVai NRC/NRR Ed Connell NRC/NRR J. Holden Florida Power Corp.

A. Petrowskey Florida Power Corp.

M. Rencheck Florida Power Corp.

R. Grazio.

Florida Power Corp.

M. Van Sicklen Florida Power Corp.

T. Baumstark Florida Power Corp.

4 '.

ggs Nuclear Regulatory Commission Florida Power Corporation Technical Meeting November 20,1997

OJb@,,

W AGENDA m Configuration Document Integration Project (CDIP) a Control Complex Habitability Envelope (CCHE) a Appendix R a Emergency Diesel Generators a MCAP II a Regulatory Submittals a Concluding Statements

Configuration Document Integration Project

  • I

=a

%G Configuration Document Integration Project a Status Update ofFSAR

+ Restart Issues have been incorporated SBLOCA information integrated into FSAR but annotated as waiting for final approval Electronic FSAR file available for site-wide use Approval processes will be complete December 1st

+ Printing will occur after SER for SBLOCA is received and reconciled with information already integrated.

  • I

@+ -

ConfigurationDocument W

Integration Project Integrated Verification Team m Verifying that operator burden and safety margins from changes are acceptable

+ Modifications dealing with ECCS and Containment

+ Emergency Operating Procedure Changes a Focused Multi-discipline team

+ Engineering, Licensing, Operations, Safety Analysis a Report complete prior to Mode 2

+ Presentation of preliminary results to Restart Panel

+ Final Re ort to be resented to PRC December 8th

l1l lll ep

x o

l e

e lp vn mE oC y

t i

l l

o i

r b

t a

n t

o ib C

a l

i epg.

a N.

'7 3

e-

s Control Complex Habitability Envelope Action Plan a Assess and Seal Penetrations Initial Phase Complete 10/10/97 E Perform Information Test Complete a Install Redundant /New Dampers in Each Isolation Path Complete by 11/25/97 m Revise and Consolidate Calculations Calculations in Final Review, PRC Approval by 11/24/97 E Demonstrate Operator Exposure is within Limits Test Complete, Results in Review I

4 l

  1. 7-Preliminary Test Results e

Dose l

Accident Scenario Previously Assumed inLeakage Based on l

Inteakage Measured Value Duration Wind Speed 0 to 8 Hrs 2.7 mph 355 cfm 80 cfm 8 to 24 Hrs 4.6 mph 355 cfm 129 cfm 1 to 4 Days 7.2 mph 355 cfm 197 cfm 4

30 16.3 mph 355 cfm 435 cfm Days Thyroid 26.5 REM with 43sq" 26.5 REM with 60sq" Exposure:

breach margin breach margin l

Control Complex Habitability Envelope Open Actions a Develop JCO prior to Mode 4 per XRC GL91-18, Revision 1 - 11/26/97 m Submit Technical Specification Change - 11/28/97 s

l

Control Complex Habitability Envelope Conclusion Demonstrate Protection of the Control Room Personnel During Postulated Events i

~,

'"""eiii

---. --i-- -i i i e

i ia i-i i iii w

C$

T M

I 2o%

Appendix R Update RCP Oil CoIIection System

+ 8 Maintenance WRs - Complete

+ Required Field Modifications - Complete t

+ Remote Oil Fill Line Exemption - Submitted

@#1 h

ress.T Appendix R Update Modifications:

List ofIssues and Modifications Provided to NRC

+

(No USQs)

Field Construction Underway

+

Design Work Continuing

+

Ohti

.. y s

W vf7

\\

Appendix R Modifications or is tio n Num ber D e sig n Package W ork T u r r. o v e r egraded eel a t e ria ls MU -

11t It ube o lie c tio n

-0

-1 e c o n d a ry r o t e c tio n 1-1 F C N -1 (S tru c tu ra l)

~

F C N - 2 ( 50.5 9)

R S F H ot S h orts t i F C N -1 (S e p a ra tio n s)

F C N -2 (N e w USQD)

~

F C N -3 (*A *~ B u s s ite m s)

^~

~

F C N -4 (*B

  • Train ite m s)

~ ~ ~

[

FCN-5 F C N -6 (*A

  • Tra in ite m s)

~

11124197 l

11I2 4 t9 7 12I9197 F C N-7 1219197 F C N-8 12/9197 D H V -3, 4 C a ble S e p a ra tio n 1211 4 (S tru c tu rs t) 97-02-18-02 iN 9 2-14 M O V s 114 i

F C N - 1 (C o ld S /D o w n)

~

11126197 F C N -2 (D w g. C h g.)

F C N -3 (M U V-2 4 /2 6) 1192 19 7 l

11126197 11128197 E m e rg e n c y Lig h tin g 1 441 FC N-1 (ED G A C C E S S) 1214197 j

A H F -2 2 8, C, D C a ble s (E D G )

11t t

(S tru c tu ral) 97-05-17-02 11/30197 l

EDG D elu g e R es e r 6 -

T h e rm o-L a g O tr c u it A e r o u te s

-1 111 i

R e-P o w o r M U V a lv e s

-1 I

/

I t 44 1 11 i

Appendix R Update l

l Cold Shutdown Calculations / Capability j

1

+ Anomaly in Calculation on 11/4/97

+ Reanalysis in Progress

+ Initial Results Indicate Total Time = 61 Hours i

+ Independent Review

)

l Appendix R Update 1

l IN 92-18 l

l

+ Re-evaluation Complete l

16 Hot Shutdown Valves being Modified Design / Field Work Packages Issued l

Completion Scheduled For 11/28/97

+ Review ofNew Plant Modifications Continuing I

I Emergency Diesel Generator Update

EDG Loading Issue Part of a Three-tiered Strategy

+ Power Upgrade

+ Load Optimization

+ Margin Verification

Diesel Generator Upgrade 3500 kW 30 Min. Radng New 200 Hr.

3400 kW Rating 3250 kW 200 Hr. Rating New 2000 Hr.

3200 kW Rating 3000 kW

~"~

2000 Hr. Rating 2850 kW Contin. Rating Sept. '96 Nov. '97

EDG Load Optimization a kW Meters a LoadManagement

+

P-T-L Control Handles

+

EFP-1 Trip Defeat Switch a Load Removal / Reduction

+ ASV-204 (125kW)

+ DOP-2A/2B (10kW)

@+: -

Diesel Generator Upgrade s

3500 kW 30 Min. Rating 3400 kW 200 Hr. Rating 3250 kW (ITS Upper SR Limit) 3200 kW ITS Lower SR Limit 3100 kW 3000 kW 2000 Hr. Rating 2850 kW Contin. Rating Sept. '96 Nov. '97

EDG Related Modifications Work Held Descripdon Number Design Package Work Turnow

~

HDGPower Upgrade

% 10-05-01 1

97 DOP-2A/2B Mod

% 12-17-01 A8V-204 Mod

% 11-01-01 Kilowatt Meter Replacement 96-03-12-01 EDGStandby Keep warm System 96-07-15-01 SW / IOV PTLControlHandles 97-04-02-01 HFP-1 Trip ~Difeat Switch 97-04-01-01 EDGRoomVeniilition Mods 97-04-03-02 HDGXHF-22 Cables 97-05-19-01 EDGAHF~2f$tructural 97-05-17-02 11/28/9

~

EDGRadlator Mods (Mech) 97-05-15-01 EDGRa~dIator Mods (Elect) 97-05-15-02 EDGPfotEEtlye Relays 97-08-01 11/23/97 12/1/97 EDGRa~dlator Elaust 97-08-04-01 12/1/97 l' 15/97 1

98

@+ "

EDG Radiator Exhaust Air J*@O DT+

9

+'1 Modification A

Radiator Discharge n

Missile Shieid Structure

~

Outside Air +

1

\\

Missile Shield with Flood Protection Radiator Coirptr ent

E(.

Load in kW ip a

eeH H

H H.F 4R 16 --

fNi 32 f f 5

  • ~~

sE o...

gg 50 --

i s 64 --

f n..

g f

J S --

)

i 88 --

gs 96 --

L 104 --

<]

112 --

E' 120 --

d

{

~t l

128 --

g

((

136--

3 h144--

f 51s2 yg 1e ra-i

.g l

s Power Uprate Testing

=

m Summary Test Description

/ Start and load run Start and run at various Icad ratings

/ Fast strrt Time to start & reach voltage and frequency

/ Combined ES Act De-energize safety bus, EDG auto-start and LOOP and auto-load sequencing h

/ Single load rejection Single largest rejected, volt. & frequency

/ Fullload rejection Reject max. load, voltage & no overspeed

/ Endurance & margin 14 hrs @ 3100 kW & 22 hrs @ 3300 kW

/ Hot restart Full temp. restart - volt., frequency & time

/

Reliability Starts & loading

OTO$OT.k gf jg 3500 kW 30 Min. Rating 3400 kW 3300 kW 200 Hr. Rating 3250 kW (ITS Upper SR Limit) 3159 kW Auto Connect Load ITS Lower SR Limit 3100 kW 3000 kW 2000 Hr. Rating 2850 kW Contin. Rating Sept. '96 i

Nov. '97

l MuuW I

'I i

<ai M

h,

,~

r

-- vf.

r

,/

4"? l Management Corrective

- 4 ~'

Action Plan, Phase II

~

a Developed and Promulgated August - October '96 a Revised in November '96 and April '97 m " Satisfactory Progress" Included as Restart Prerequisite in March '97 CAL i

-W mWm p

M~,A \\.

i

=

' 'WNj MCAP II og,q. e Addresses Performance Issues in Five Major Areas

+ Leadership Oversight and Involvement

+ EngineeringPerformance

+ ConfigurationManagement/DesignBasis

+ RegulatoryCompliance

+ Operations Performance

x --

&wfs R

!,:aag W':!

MCAP II m Resulted in 148 Corrective Actions

+ 69. Addressed Root and Contributing Causes

+ 65 Addressed IDRP Issues

+ 14 Addressed Issues from Previous Submittals and NRC/FPC Meetings

+ 32 Action Items were Tied to Restart for Resolution

=

c.

..%.rF

. c$ '.

a a

a a

u a

m co o

n a

m o

o o

o o

o o

o o

Cm 9/30/96 in.

  • [

i e

n

.{}

/

!l 10/31/96...

1 n... r 11/15/96..

'v 12/31/96 "

5;._ ;cd' j.g.-

M' v.i s

,r';? :- Q't -F;",QIbik Q

2/7/97.

N 'y.-

W r~

x.

.S + w..a. ~..

a, u :-

w m-3/18/97..

  • 7t' '

W

. _u 4/1/97

~ -

\\

4,.

l 4/25/97 1

F),

a._

p i

i%

,'.. c, v. rr,,, e 5, e.

.w 37

.s,-

g 5/15/97,

C, -

. p...

ra.g I p,

. w

. +,

4,i ',.... v

.c n. s 5%.3 * *.,c ;.;g.

v.

r

>; 4.w -

'* 3 p*^ tva,,t.

t v.> u ' '

  • a 6/30/97 "l

[4 {.'

s 4

-.),<e A

puma

.1.g,pe.. y f.. y.,r. pip y.

b

... q.m,c - ;w,r..m.

i m ' ' %,. ', g,

. g _,;. i4. a, 1 4

.o

. gi g hd yt y

, ;,ge > <.., $;

3 8/15/97 :

$dS M 'h h,. h?N ~bh,h

..,j r.

g.,.

y

*g a., m... ~. a *,..tp, a,..cl;de41bW9

-q y O tT.-

..; q

  • o
.i!;k,W /

,,,t #.f Y.c.e,p, W,'AM,tWU&., qg.w'snp 9 vi

> ih4 h /A' 9/15/97.,

W5

> lE 3,d436

,.. g<. i.

,. m s ao v>c..

k,a 4 YH, ' < kg g ?q%.W.'mus

_emm m

e g E

1

-. fh!N j {o]

r.

..s p n, -

- so...,#@Nt y

7gr..mwi#y.o.

l if i

n 10/17/97

nppm, Q

a.,

,e

:.a u.

,, 0...a

. us 3 w.; na

.J..

o e e; w: './ 4 i

11/30/97..,

3

+

'44 $ 'A."

..... - u i-t

)me 6.,t '< f;#.;r"'v

. > U1 '!-

,.,M,

. t:<,..M fiS,- F

  • T 6 L.

J

,4gi

,,..C..,

P'..,i, i'T

  • i ? '%N f.)c *..m' YA.m

.C $i-d m F

O

,.f.m.

~---~'g,mL.. h..

.s

~' -

., 'm*'='-

3/30/98

.i.

N g

x,, < >.

's4 &-

s a

-s n

n u

u

. e:

o m

o m

o a

o a

10/7/96 s.

6

,l i

k, 10/31/96.

/

., j-

,7ry.

1/1/97.

,/ :

e.; y, _

3/17/97.

.i

- m s qj q pyy d'6js-3/28/97.

-. < v M ' '.e : -m,,

P. s:

a; W %,g w-,c;Q:

vw.

?

. ' ' m$h.s 3/31/97.

' 3 4,

x.Nm,i; E',

m

'. + %G

'm

,g,s g: w ' n f.

% a.

p-, z y:

,g 4/1/97.

e e ni,.

m,

,,m,

,,e b

~.a h

4/3/97.

--ft-

  • i P

~ ',.T

}

5/30/97..

. :. > f :,

l

~"_

i. h's.'

A

. x 2 Oy. w.., M.. E, v w

+

7/8/97.

7 J p,'....u,q..._.g..

u

.;c -c.m,g g,.._,.gplj;p g

g c,

=

..a.,, m.- c a.

-.. n...ml N $ %,...,

pu$.

8/21/97.

Ja J

4 d ( 7?M,9e,,,, n, s..L,,g.,p9,,p....

c_.,,w, 1

s A.,

, b. hSY.i v '.Q,d. 5.'Nh d,,,s:.

Qty ff[

J h

, n;c -

w

g

,p, 5.,,, "" %a.,,.s 8/28/97. p,4. e....a,w,rg a a my.., '( e fe.

w, ; i L

s b.yqyA. 4W.M#.J, tD,7'9$,,,. Ww q.u..,,;

.a,

?,

WV,. n..

fuup.

s T

W i

\\

.., r..

3 r.

e. g

,,j{q 9/11/97.

Eg e hg.yggj

. y

,g,;_.. g$4 dig:g p ef d y@p A j~pIj{tl y, g

f y! p -m y b v e,,

g wp gnx-rch, nwwn:a ser m g

h

. ggg ;g& :..-, fn y' e -.

a, gtgpiggu, e, e: 4 e

9/15/97.

g (3, !..,..,.

, yy s. g ce

l" QC ( -;ry ',#CLMYi9%
a

,:.Nf Q.;Q 6 d y 4.:J".1L, pl%' < lh;-

&, lH:'2 9/23/97.

a4 m - r., a : n, e ~ - + i cm o,

s u

-, a.t,y;-

.p ;u g

a g

, q..,., y g :., ~;. 9 * ~

g s.y a if,y.m.-.. g S a.,,,:, %.. ;,q d h O,.e p t;W y" 1 I,'.sh 11/3/97.

~'

, p,. j,.

<, I '!;M,7... b ayg,a 4 a.g y

. A. ;., e m g

,+s.

a,, L o

w j jjgjjg7 n-A*

4 !;

' I '.' ff, ' -

J' 6 ; s,',. Qd4lg MfM1

=:

-n j,. g g Q l4%)

FPC Effectiveness

~

Assessment a 9 Person Team Conducted in August '97

+

6 FPC Personnel

+

1 Industry Peer

+ 2 Facilitators a Evaluated Areas as (Scale 1-5):

+ Leadership Oversight and Involvement: 3

+ Engineering Performance: 4

+

Configuration Management / Design Basis: 3

+ Regulatory Compliance: 3

+ Operations Performance: 3

\\,:@$4i x'

OverallRecommendations m " Ongoing" Corrective Actions Should be Evaluated for Effectiveness at Periodic Intervals a Remaining '97 Items Should be Implemented as Scheduled a '98 and Beyond Items Should be

+ Incorporated Into Business Plan

+ Implemented as Part of CAP

/

a myrVfy9 p

,x,m MCAP II Conclusion 7, @'.

i a Satisfactory Progress Has Been Made on the Action Items Described in MCAP II m CAL Item is Satisfied

R 1*l.

w

~

O m y 4

C3

  • M W

b tHD

,.C C

W D

G t

x-f}

'O

  • "WWf' License Amendments and Tech Spec Submittals mas Additions

-*- G oal = 0

.E

-*- Actual

w

-o, Action Plan bS 15 -

E&

S 10 -

83 5-0 9

5Q P

h i

i Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997

s Status of License Amendment and Tech Spec Submittals e er WHal Description Te I

Prepared Date input Senice Water Cherheating 11/21/97 11/24/97 12/3/97 CCHE/CREVS Suneillance 11/26/97 11/26/97 11/28/97 9

Boron Mitigation - Hot Leg 12/1/97 12/1/97 12/5/97 injection

Submittals Requiring XRC Response for Restart LICENSE MODE LAR RAI RES NSE AMENDMENT REQUEST REQ'D SUBMITTED RECBVED DUE 6/14/97 9/

/97 9/10/97 I"

)

  1. 210 - SBLOCA 4

10/28/97 9/30/97 (Suppl) 11/15/97 11/21/97(Suppl) 11/7/97 11/21/97

  1. 216 - EDG Fan 4

8/26/97 none none

  1. 220 - DH-45-Fi 2

9 97 il 97 10/31/97 Rev.1

  1. 219 - EDG Protectie Trips not Bypassed 4

9/12/97 10/28/97 11/7/97

p Mgy wa j

.-6.,>..

g c

M. '"'"m ;

Submittals Resolved for Restart.

'EEx'[!)

2

^'

LICENS E MODE LAR RAI AMENDMENT REQUEST R EQ 'D S U B M ITT ED RECEIVED DUE s

  1. 223 - Boron Precipitation 2

10/31/97 11/7/97 12/3/97 l Mitigation - G APS

  1. 209 - P AM 4

7/29/97 10/7/97 10/29/97 7/18/97 Rev. 0 8/12/97 9/5/97 9/12/97 (Suppl) 8/13/97 9/12/97 I

  1. 213 - LTO PS 4
  • 'b) 10/7/97 10/25/97 1 / i/97 C
  1. 218 - Letdown Line Rupture 4

9/9/97 10/10/97 11/7/97

(

  1. 214 - ECCS Mode 4 4

10/31/97 none none

=

m-_.

'1

~

l

=:2;-t:

ne -m'

=

d*.,Tas Submittals with NRC u%.8 9 Response Required Post Restart L IC E N S E LAR AMENDMENTREQUEST S U B M IT T E D

  1. 222-CCHE/CREVS 11/28/97
  1. 217 A H F -1 C 10/4/97
  1. 221

- OTSG IG A G ro w th 10/1/97

  1. 224-SW UHS 12/3/97
  1. 2 2 5 - B o ro n P re cip ita tio n -

12/5/97 H o t L e g inje c tio n l

?3,Ltt2; 3.6WJ W

i. t s l:,

.$ '"y

1 Submittals Where NRC SER (2'. 4p Has Been Received

~

m

  1. 211 - OTSG m
  1. 212 - Appendix J Option B a
  1. 215 - Exigent Diesel Surveillance Amendment e

Appendix R - Enhanced Sprinklers i

_Y" ; " *".T ~'

2

= --

=

(TY Regulatory Readiness i;h )'/

Other NRC q

Restart Submittals e-25 -

lum Additions eGoal = 0 tnW 20 -

~ Actual 2],

-n-Action Plan j i 15 -

m :s

~e 1

0# 10 -

EE E

5 5-z O-i i

v 9

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997

= _

ex m

i Y. *P &

"w 1,.. 2 L*

Status of Other Regulatory (1.eN...v;'

Submittals D escription Te nical Prep red Dat input RCS Attached Piping Fatigue Analysis 11/21/97 integrated Safety Assessm ent 11/26/97 11/27/97 12/1/97 l

Jet Im pingem ent Analysis Results 12/8/97 12/3/97 12/1!97 l

Appendix R - 72 Hr Coodwn Ra'

uppl Resp 11/23/97 12/1/97 System Readiness Review Progr - E n m ary Rpt 11/21/97 Appendix R Closure 11/30/97 12/7/97 D H-45-F1 S upplem ental inform ation - LAR 220 11/21/97 Restart Request Letter 11/21/97 11/21/97 12/1/97 FSAR Revision 24 11/21/97 11/21/97 12/4/97

[

LTOPS - Revision to JCO 11/20/97 R Al-Boron Precip, LAR 223 12/1/97 12/1/97 12/3/97 TSC RN 210 Supplem ent 11/20/97 11/21/97 Final EOPs Submitted (TSCRN 210) 11/20/97 11/21/97