Novemb:r 4, 1997 )

d LICENSEE: Florida Power Corporation PLANT: Crystal River Unit 3 SUBJdCT:

SUMMARY

OF OCTOBER 22,1997 MEETING WITH THE FLORIDA POWER i CORPORATION REGARDiNG LOSS-OF COOLANT ACCIDENT SCENARIOS On October 22,1997, the Nuclear Regulatory Commission (NRC) staff met with representatives of the Florida Power Corporation (FPC)in Rockville, Maryland, to discuss FPC's June 14,1997,  !

amendment request, as supplemented by letter dated September 25,1997, involving mitigation i

of certain Small Break Losa of Coolant Accident (SBLOCA) scenarios. Enclosure 1 is a list of meeting attendees. Enclosure 2 is a list of the engineering drawings provided at the meeting, and Enclosure 3 is the actual drawings. In the meeting, FPC provided technical clarification for each SBLOCA scenario, sy. tem designs, system configurations, and operator actions. During its discussion, FPC stated that high-pressure injection (HPl) flow throttling would be used when in recirculation mode (low pressure injection taking a suction from containment sump and feoding

HPl pumps). The staff questioned whether FPC has been approved to use flow throttling and requested that FPC provide a reference to the staff's approval for the use of flow throttling.

In the meeting, the staff also discussed the draft Emergency Operating Procedures (EOPs) provided in the June 14,1997, submittal. The staff requested that FPC submit a propcsed final version of the applicable EOPs to ensure that the staff's approval of the operator actions are based on EOPs that will be in place at restart. The staff also requested all the applicable EOP steps for all the operator actions requiced for the SBLOCA scenarios included in the submittal..

Original signed by S. Flanders Scott Flanders, Project Manager Project Directorate PD 113 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation '

h Docket No. 50-302 I I l

Enclosures:

1. Attendees List _
2. List of Engineering Drawings -' tuof ' /df ( 'W'l
3. Engineering Drawings I

4 & i, t. ,'

cc w/ enclosures 1 and 2: See next page gg l qq p 7" p ~~"P' OWef

- i .,3 th u . . .

h W-j j di O Document Name: G:\ CRYSTAL \S8f0CA. SUM Office PM PDil 3 LA:PDil-3 PD:PDil-3 Name SFlan [ BClayton /8 FHebdon h Date 11 k til6 /97 11M/97 Copy Yes/No Yes LMo i

  • OFFICIAL RECORD'CIOPY 9711170105 971104 PDR ADOCK 05000302 P PDR

e, **8eg p- 4 UNITED STATES

  • g NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3000H001 Novenber 4,1997 LICENSEE: Florida Power Corporation PLANT: Crystal River Unit 3

SUBJECT:

SUMMARY

OF OCTOBER 22,1997 MEETING WITH THE FLORIDA POWER CORPORATION REGARDING LOSS-OF-COOLANT ACCIDENT SCENARIOS On October 22,1997, the Nuclear Regu! story Commission (NRC) staff met with representatives of the Florida Power Corporation (FPC)in Rockville, Maryland, to discuss FPC's June 14.1997, amendment request, as supplemented by letter datec' September 25,1997, involving mitigation of certain Small Break Loss of Coolant Accident (SBLOCA) scenarios. Enclosure 1 is a list of meeting attendees. Enclosure 2 is a list of the engineering drawings provided at the meeting, and Enclosure 3 is the actual drawings. In the meeting, FPC provided technical clarification for each SBLOCA scenario, system designs, system configurations, and operator actions. During its discussion, FPC stated that high pressure injection (HPI) flow throttling would be used when in recirculation mode (low-pressure injection taking a suction from containment sump and feeding HPl pumps). The staff questioned whether FPC has been approved to use flow throttling and requested that FPC provide a reference to the staff's approval for the use of flow throttling.

In the meeting, the staff also discussed the draft Emergency Operating Procedures (EOPs) provided in the June 14,1997, submittal. The staff requested that FPC submit a proposed final version of the applicable EOPs to ensure that the staff's approval of the operator actions are based on EOPs that will be in place at restart. The staff also requested all the applicable EOP steps for all the operator actions required for the SBLOCA scenarios included in the submittal.

?

e 4x Scott Flander anager Project Directorate PD 11-3 Division of Reactor Projects 1/ll Office of Nuclear Reactor Regulation Docket No. 50 302

Enclosures:

1. Attendees List
2. List of Engineering Drawings 3.' Engineering Drawings cc w/ enclosures 1 and .': See next page

e.-  !

t .. l l Florida Power Corporation CRYSTAL RIVER UNIT NO. 3 GENERATING PLANT  ;

2 I

cc: -

=

I Mr. R. Alexander Glenn- Mr. Robert E. Grazio. Director  !

Corporate Counsel Nuclear Regulatory Affairs (SA2A) i

. Florida Power Corporation Florida Power Corporation  ;

MAC ASA i Crystal River Energy Complex <

l P.O. Box 140421 15760 W. Power Line Street i St. Petersburg. Florida 33733 4042 ' Crystal River. Florida 34428 6708  !

Mr. Charles Pardee. Director Senior Resident Ins ctor  !

Nuclear Plant Operations (NA2C) Crystal River Unit i Florida Power Corporation U.S. Nclear Regulatory Commission >

Crystal River Energy Complex 6745 N. Tallahassee Road i 15760 W. Power Line Street Crystal River. Florida 34428 l Crystal River._ Florida 34428 6708

! Mr. James S. Baumstark ,

Mr. Bruce J. Hickle. Director Director. Quality Programs (SA2C) 1 Director. Restart (NA2C) Florida Powar Corporation i Florida Power Corporation Crystal River Energy Complex l

. Crystal River Energy Complex 15760 W. Power Line Street 15760 W. Power Line Street Crystal River. Florida 34428 6708 d Crystal River. Florida 34428 6708 Regional Administrator. Region II )

Mr. Robert B. Borsum U.S. Nuclear Regulatory Commission Framatome Technologies Inc. 61 Forsyth Street. SW.. Suite 23T85 1 1700 Rockville Pike. Suite 525 Atlanta. GA 30303 3415 ,

4 Rockville. Maryland 20862  !

Mr. John P. Cowan -

Mr. Bill Passetti Vice President - Nuclear Production i

-Office of Radiation Control (NA2E)

Department of Health and Florida Power Corporation .

Rehabilitative Services Crystal River Energy Complex 1317 Winewood Blvd. 15760 W, Power Line Street Tallahassee. Florida 32399 0700 Crystal River. Florida 34428 6708 Attorney General Mr. Roy A. Anderson

. Department of Legal Affairs Senior Vice President The Capitol Nuclear Operations  !

Tallahassee. Florida 32304 Florida-Power Corporation ATTN: Manager. Nuclear Licensing Mr. Joe _Myers. Director Crystal River Energy Complex (SA2A)  !

Division of Emergency Preparedness 15760 W. Power Line Street Department of Comunity Affairs Crystal River. Florida 34428-6708 ,

2740 Centerview Drive

  • Tallahassee. Florida 32399-2100 Mr. Kerry Landis -

U.S. Nuclear Regulatory Commission -;

Chairman 61 Forsyth Street. SW.. Suite 23T85  :

Board of County Commissioners Atlanta. GA 30303-3415 Citrus Count -

110 North Ap pka Avenue-
!verness. F1 rida 34450-4245 4

t

, ,- , . _ m.m._ ,_. ___ #._ , s . . , _ . - . , _

s l l

MEETING ATTENDEES I OCTOBER 22.1997 MEETING l WITH FLORIDA POWER CORPORATION hlME ORGANIZATION

1. Scott Flanders NRR/ PD ll 3
2. Christopher Jackson NRR/SRXB . i
3. Frederick Hebdon NRR/PD ll 3
4. Bill LeFave NRR/SPLB ,
5. Paul Fleming FPC e, Mark Pratt NRR/EELB 7_ Mike Lalor FPC
8. Frank Orr NRR/SRXB
9. L. Raghavan NRR/PD 113 ,

l 1

Enclosure 1 I

1 e- i i

List of Drawinas Provided by FPC

1. Crystal River Unit 3 Primary Systems (training use only, simplified), Rev 7
2. Crystal River Unit 3 Secondary Systems (training use only, simplified), Rev 4
3. Crystal River Unit 3 Electrical Distribution (simplified), Rev 3
4. Crystal River Unit 3 Primary Systems Emergency Core Cooling (training use only, simplified), Rev. 2.
5. Flow Chart of EOP 3 Inadequate Subcooling Margin, Rev P
6. Flow Chart of EOP-4 Inadequate Heat Transfer, Rev T  ;
7. Flow Chart of EOP 2 Vital Systems Status Verification, Re, J
8. Flow Chart of EOP-8 LOCA Cooldown, Rev N Enclosure 2

4 Astr6ution HARD COPY w/Endosures 1 and 2 -

l PUBLIC Crystal River Reading OGC ACRS >

L.Raphaven J. Johnson, Ril ,

Dochet Ph (w/ encloswes 1.- 2, and 3)

EMd S. Collins /F. Miraglia (SJC1 FJM)

R. Zimmerman (RPZ)

8. Boger (BAB2,RCN)

J. Zwolinski(JAZ)

K. Landis (KDL)

F. Hebdon (FJH)  :

B. Clayton (BAC2)

J. Jeudon, Ril (JPJ)

T. Martin (e mail to SLM3) .

M. Gameronl, EDO (MKG)

C. Jackson S. Flanders ,

B. LeFave M. Pratt F. Orr i

P 1

s - --..n , _ .

OVERSIZE l DOCUMENT  !

l PAGE(S) PULLED SEE APERTURE CARD HLES  :

APERTURE CARD / PAPER COPY AVAllABLE THROUGH NRC File CENTER j ...........................................................................

1 l

NUMBER OF OVERSIZE PAGES FilMER ON APERTURE CARD (S)

^

l ACCESSION NUMBERS OF OVERSIZE PAGES: k)QA)fdBLl0 97 ///7d/Cf -d/

l 97// /70/d5-d2 j 971l176105 ~ 03 l 97//170/OS-CY  !

! 97// /70// 7 9?// /7d//9 97))170 /2 /

97// / 70/2V  !