ML20134P175

From kanterella
Jump to navigation Jump to search
Notification of Licensee Meeting W/Licensee on 970318 in St Francisville,La to Present Results of SALP Rept
ML20134P175
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/14/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9702250165
Download: ML20134P175 (5)


Text

_ - . . . . _ _ - . m.._.- . __ .. . . . . . _ _ _ _ . . . ._ _ ._ _ _ _. ___

_ m - __ _ - - . = . _ . . _ _ . _ . _ _ . _

ga "% . UNITED STATE S

f. .\ NUCLEAR REGULATORY COMMISSION

. $ REGION iv

,* g 611 AY AN PLAZA DRIVE SulTE 400

't, ...../

'I AR LINGToN. TE XAS 76011 8064 FEB l 41997  !

NOTICE OF LICENSEE MEETING Name of Licensee: Entergy Operations, Inc. (EOI)

Name of Facility: River Bend Station Docket: 50-458 Date and Time March 18,1997 of Meeting: 10 a.m. (CST)

Location of Meeting: River Bend Station Training Center St. Francisville, Louisiana Purpose of Meeting: Present the results of the Systematic Assessment of Licensee Performance report NRC Attendees: J. E. Dyer, Deputy Regional Administrator W. D. Beckner, Director, Project Directorate IV-1 (PDIV-1)

Office of Nuclear Reactor Regulation (NRR)

K. E. Brockman, Deputy Director, Division of Reactor Safety P. H. Harrell, Chief, Project Branch D, DRP  !

D. L. Wigginton, Project Manager, PDIV-1, NRR t Licensee Attendees: D. C. Hintz, President and Chief Executive Officer, EOl J. W. Yelverton, Executive Vice President and Chief Operating Officer, EOl J. R. McGaha, Vice President-Operations (

J. P. Dimmette, General Manager, Plant Operations M. A. Dietrich, Director, Quality Programs R. J. King, Director, Nuclear Safety & Regulatory Affairs D. T. Dormady, Manager, System Engineering J. R. Douet, Manager, Maintenance l W. P. O'Malley, Manager, Operations NOTE:

(1) This meeting is open to attendance by members of the general public.

(2) NRC personnel, not listed above, that desire to attend this meeting should notify Greg Werner at 817-860 8269 by COB on March 11,1997.

r j)

If .

i Approved By:

l h ArthurT. HowellIll, Acting Director l Division of Reactor Projects J

9702250165 970214 PDR ADOCK 05000458 G PDR

. . . - - . . . - - . . - . .... ~ - - ..- . . - - . . . . - - . . _ . . - - . . - . . - . .

4 J 4 i'  ;

. Entergy Operations, Inc. .

i i

2 ,

cc John R. McGaha, Vice President - Operations  ;

. River Bend Station t

Entergy Operations, Inc.  ;

P.O. Box 220 St. Francisville, Louisiana 70775 l 4

Executive Vice President and  !

'. Chief Operating Officer i i Entergy Operations, Inc. l

$ P.O. Box 31995 Jackson, Mississippi 39286-1995 I Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 General Manager l Plant Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Director - Nuclear Safety River Bend Station Entergy Operations, Inc.

P.O. Box 220 ,

St'. Francisville, Louisiana 70775 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 i

Mark J. Wetterhahn, Esq. l Winston & Strawn 1401 L Street, N.W.

Washington, D.C. 20005-3502 1

l l

k

l Entergy Operations, Inc. .

Manager - Licensing ,

River Bend Station  ;

Entergy Operations, Inc.  ;

P.O. Box 220 St. Francisville, Louisiana 70775 ,

i The Honorable Richard P. leyoub l Attorney General i'

. P.O. Box 94095 Baton Rouge, Louisiana 70804-9095 -

H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 >

t President of West Feliciana Police Jury t P.O. Box 1921

- St. Francisville, Louisiana 70775  :

r l Larry G. Johnson, Director Systems Engineering Cajun Electric Power Coop. Inc.

10719 Airline Highway 1 P.O. Box.15540 l t

Baton Rouge, Louisiana 70895  ;

?

l William H. Spell, Administrator  ;

l Louisiana Radiation Protection Division i i P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 i

i 4

i i

i ,

Entergy Operations, Inc. E-Mail To: FOR (6) NRC Attendees PMNS Mtg Announcement Coordinatcr SAM J. L. Milhoan, DEDR PAB H. L. Thompson, DEDS FJM F. J. Miraglia, A/D/NRR ACT A. C. Thadani, ADT/NRR 1 RPZ R. P. Zimmerman, ADP/NRR OEMAIL J. Lieberman, D/OE LJC L. J. Chandler, OGC j WFS W. F. Smith, Senior Resident inspector i CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO - l GFS G. F. Sanborn, EO l BWH B. Henderson, PAO MFH2 M. Hammond, PAO i JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division  !

LMB, CLG DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley j

cc:  :

DMB (IE 45) l OEDO RIV Coordinator (17G21) {

Receptionist i ORA File l RIV File To receive copy of document. Indig in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy PE:DRP/D, C:pR@D / g PAO Sk RSLO (itcg D:DRP Jh GEM (gy.cm PRHa gJ) BWHenderson CAHackney JEDyeV V 1/j3797 1Qh/@f 1/M /97 1/27/97 1/ lt/97 OFFICIAL RECORD COPY I

__ __ _ __ . _ . - . . _ _ . . _ _ _ _ _ . _ _ . _. __ m __

l l

Entergy Operations, Inc.  !

E-Mail To: FOR l

(6) NRC Attendees )

PMNS Mtg Announcement Coordinator SAM J. L. Milhoan, DEDR PAB H. L. Thompson, DEDS-FJM - F. J. Miraglia, A/D/NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR OEMAll J. Lieberman, D/OE LJC L. J. Chandler, OGC WFS W. F. Smith, Senior Resident inspector CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division LMB, CLG DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley cc: ,

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist '

ORA File RIV File l

/

To receive copy of document, indige in box: "C" = Copy without enclos ares "E" = Copy with enclosures "N" = No copy PE:DRP/D, C:pRFYD / g PAO [ RSLO &cg D:DRP gL  !

GE%%ghpn P4Ha g1) BWHenderson CAHackney JEDyeV V 1Qh/pf 1/g /97 1/r/ /97

^

1/ AT797 1/ l4/97 OFFICIAL RECORD COPY 250009