ML18152B357 | 22 October 1999 | Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 | Design basis earthquake Through Wall Leak |
ML20217M446 | 20 October 1999 | Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 | |
ML20217H466 | 18 October 1999 | Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl | |
05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project | 15 October 1999 | Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project | |
ML18152B358 | 14 October 1999 | Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 | Coatings |
ML18152B354 | 12 October 1999 | Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info | VT-2 |
ML20217B843 | 5 October 1999 | Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams | Nondestructive Examination Liquid penetrant Dissimilar Metal Weld |
ML20217C710 | 1 October 1999 | Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample | |
ML20216J824 | 30 September 1999 | Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr | |
ML18152B339 | 27 September 1999 | Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC | Nondestructive Examination VT-2 |
ML18152B340 | 27 September 1999 | Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors | Generic Fundamentals Examination |
ML20216J935 | 27 September 1999 | Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band | Significance Determination Process |
ML18152B338 | 21 September 1999 | Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls | |
ML18152B333 | 17 September 1999 | Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. | Grace period |
ML18152B667 | 17 September 1999 | Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 | Generic Fundamentals Examination |
ML18152B334 | 16 September 1999 | Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations | Nondestructive Examination VT-2 |
A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station | 15 September 1999 | Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station | Ultimate heat sink Earthquake Maintenance Rule Program |
ML18152B452 | 14 September 1999 | Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 | |
ML18152B450 | 8 September 1999 | Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) | |
ML18152B447 | 1 September 1999 | Requests That NRC Remove Listed Labels from Distribution | |
ML20211N568 | 1 September 1999 | Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study | Safe Shutdown Temporary Modification Maintenance Rule Program |
ML20211J031 | 30 August 1999 | Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon | |
ML20211G122 | 27 August 1999 | Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) | Fitness for Duty |
ML18152B371 | 27 August 1999 | Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed | |
ML20211G819 | 26 August 1999 | Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes | Safe Shutdown Fire Barrier Exemption Request |
ML20211F889 | 25 August 1999 | Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c | |
ML18152B385 | 23 August 1999 | Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis | |
ML18152B365 | 20 August 1999 | Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) | |
ML18152B366 | 20 August 1999 | Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) | |
ML18152B368 | 20 August 1999 | Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 | |
ML18152B380 | 18 August 1999 | Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 | |
ML20211A185 | 16 August 1999 | Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 | |
ML18152B375 | 13 August 1999 | Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed | |
ML18152B378 | 13 August 1999 | Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made | |
ML20211A192 | 12 August 1999 | Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 | |
ML20210Q766 | 6 August 1999 | Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas | |
ML20210N565 | 6 August 1999 | Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes | Safe Shutdown Fitness for Duty Health Physics Network Offsite Dose Calculation Manual Nuclear Accident Reporting System Severe Accident Management Guideline Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Stolen Siren |
ML18152B408 | 6 August 1999 | Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. | Loop seal Stroke time |
ML18152B409 | 5 August 1999 | Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) | Fitness for Duty |
ML20210M913 | 2 August 1999 | Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed | Ultimate heat sink Coatings VT-2 Exemption Request |
ML20210L429 | 2 August 1999 | Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c | |
ML20210L161 | 30 July 1999 | Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 | |
ML20210J086 | 30 July 1999 | Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 | Exemption Request |
ML18152B400 | 29 July 1999 | Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl | VT-2 |
ML18152B398 | 28 July 1999 | Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed | Enforcement Discretion |
ML20210G530 | 28 July 1999 | Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 | |
ML18152B397 | 26 July 1999 | Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 | |
ML18151A628 | 23 July 1999 | Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) | Fuel cladding |
ML18152B396 | 23 July 1999 | Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) | |
ML18152B399 | 23 July 1999 | Requests That License for Jz Laplante Be Canceled as License Is No Longer Required |