Issue date | Title | Topic | |
---|---|---|---|
ML20211B387 | 17 August 1999 | Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project | |
ML20196G221 | 21 June 1999 | Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included | Grab sample |
ML20195J139 | 11 June 1999 | Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit | |
ML18152A474 | 19 May 1999 | Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F | Hydrostatic |
ML20206M792 | 7 May 1999 | Advises That Vepc Is Proposing to Use Three Chemicals in Bearing Cooling Tower at Naps,That Were Not Addressed in Licensee Last Application for Reissuance of Vpdes Permit | |
ML18152B599 | 8 January 1999 | Confirms That Util Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste (Rcaw),Acceptable for Maintaining Compliance with Natl Emissions Stds for Hazardous Air Pollutants (Neshap) Regulations | |
ML20196H643 | 3 December 1998 | Informs That Util Is Seeking Approval to Discharge Chlorinated Blowdown from Bearing Cooling Tower for More than 2 H Per Unit as Specified in Special Condition 10 of Vpdes Permit.Meeting During Wk of 981214,requested | |
ML20153G013 | 22 September 1998 | Requests Approval for Extended Compliance Schedule for Specific Provisions of Part III (9 VAC25-91-130,Pollution Prevention Requirements) for North Anna Nuclear Power Station | |
ML18153A267 | 22 September 1998 | Requests Approval for Extended Compliance Schedule for Specific Provisions of Part III (9 Vac 25-91-130,Pollution Prevention Requirements) for Surry Nuclear Power Station | |
ML18152B817 | 18 May 1998 | Discusses Results of Data Contained in Discharge Monitoring rept-QA (Dmr/Qa) Dtd 980114 | |
ML20217Q769 | 4 May 1998 | Forwards Revised Application for Exclusionary General Permit for NAPS as Requested by D Vaughan in | |
ML18153A216 | 23 January 1998 | Notifies That Plant Has Not Received Copy of Waste Shipment Record,Signed by Owner or Operator of Designated Waste Disposal Site within 35 Days Since Waste Was Shipped off- Site & Will Not Receive in 45 Days | |
ML20198P879 | 12 January 1998 | Submits Application for Exclusionary General Permit for Plant | |
ML20203H611 | 15 December 1997 | Forwards Application for General Storm Water Permit for Construction Activity at Naps.Local Government Ordinance Form,Pink Copy of Permit Application Fee Form & Copy of Check for Application,Encl | |
ML20198P287 | 29 October 1997 | Requests That Vpdes Permit Be Amended to Reflect That Three Small Package Sewage Treatment Plants Were Permanently Removed from Svc | |
ML20210G972 | 22 July 1997 | Submits Proposal to Pressure Test Piping within 10 Days Prior to Normal Fuel Oil Unloading Into Ast,Beginning No Later than 980101 | |
ML20138B338 | 23 April 1997 | Provides Info to Support Proposal to Perform Annual Pressure Testing as Method of Leak Detection for Underground Line That Runs from Loading Area 5,000 Barrel Aboveground Storage Tank | Safe Shutdown Hydrostatic |
ML18153A117 | 19 March 1997 | Discusses Discharge Monitoring report-quality Assurance (DMR-QA) Results for VA Power Facilities | |
ML18153A111 | 14 February 1997 | Confirms 970214 Telcon Re Location of Radiologically Contaminated Asbestos Waste Shipment S-96-1005 | |
ML20149M813 | 5 December 1996 | Submits Conditions Which Are Part of 961202 Approval of Temporary Conditional Use Permit Which Allows Construction of Temporary ISFSI or Dry Cask Storage as Listed | |
ML20101R252 | 10 April 1996 | Responds to Unacceptable Results Noted in Discharge Monitoring rept-QA Rept for North Anna Power Station (Permit VA0052451) & Yorktown Power Station (Permit VA0004103) | |
ML20101J051 | 21 March 1996 | Provides Notice of Intent to Increase Amount of Reverse Osmosis Reject Water Discharged at Outfall 020 | |
ML18151A187 | 20 March 1996 | Forwards Application for Reissuance of Vpdes Permit VA0004090 for Plant.W/One Oversize Map | |
ML18153A530 | 18 March 1996 | Confirms That Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste Acceptable for Maintaining Compliance W/Natl Emissions Stds for Hazardous Air Pollutants Regulations | |
ML20100B906 | 24 January 1996 | Submits Annual Statement Verifying That Each Spillway Gate Operated at Least Once During Twelve Months Preceding Annual Insp by Ferc,Per 18CFR12.44(b)(2).Main Dam'S Five Spillway Gates Satisfactorily Tested as Specified on Attached Form | |
ML18153A556 | 11 December 1995 | Requests Approval for Proposed Minor Change in Nature of Internal Discharge at Plant | |
ML18153A682 | 29 November 1995 | Responds to 951114 Lab & Technical Insps at Plant on 950928. Submits Actions Taken to Address Items Noted During Insp & Reflected in Lab Rept | |
ML18153A672 | 22 November 1995 | Requests That Vmrc Permit 92-1347 Be Extended to Allow Continued Maint Dredging Activity in Future | |
ML18153A780 | 10 October 1995 | Responds to Concerns Re Leak Detection Sys in Facilities in Jurisdiction | |
ML18153A746 | 30 August 1995 | Notifies of Minor Change in Discharge or Mgt of Pollutants at Surry Power Station | |
ML20087L341 | 21 August 1995 | Notifies of Minor Change in Discharge or Mgt of Pollutants at Plant | |
ML18153A731 | 9 August 1995 | Forwards Mixing & Dilution of Surry Nuclear Power Plant Cooling Water Discharge Into James River. | |
ML18152A401 | 11 May 1995 | Responds to Telcons W/Eh Greene of VA Power'S Air Quality E Dept Re Use of Methylene Chloride in Paint Shop of Surry Power Station.Requests Confirmation That Painting Operation Exempt from Toxics Regulations | Coatings |
ML20083K718 | 4 May 1995 | Forwards Application for Reissuance of Vpdes Permit for North Anna Power Station W/Addl Data Requested by | Boric Acid Grab sample Biofouling |
ML18153A808 | 28 April 1995 | Provides Comments on EPA Pr Re Criteria for Certification & Determination of Waste Isolation Pilot Plant Compliance W/ Environ Standards for Mgt & Disposal of SF,high-level & Transuranic Radwastes.Guidance Re Categorization Needed | |
ML18153A792 | 12 April 1995 | Submits Comments Re Proposed Revs to Guidance Provided to Federal Agencies on Radiation Protection | |
ML20080J918 | 22 February 1995 | Submits Annual Statement Verifying That Each Spillway Gate Has Been Operated at Least Once During Twelve Months Preceeding Annual Insp by FERC Regional Engineer | |
ML20080K856 | 22 February 1995 | Submits Notification for Spillway EDG Corrective Maint & Start Failure for Plant Hydroelectric Project | |
ML18153B235 | 17 February 1995 | Informs of Receipt of NOV in Ref to Dec 1994 Excursion of Total Suspended Solids Limitations of Vpdes Permit for Plant | |
ML20078M148 | 8 February 1995 | Discusses Series of Problems at Sewage Treatment Plant Re Exceedance in Bod | |
ML18153B216 | 1 February 1995 | Advises That Plant Has Not Received Copy of Waste Shipment Record,Signed by Owner or Operator of Designated Waste Disposal Site within 45 Days Since Waste Shipped off-site | |
ML20078H071 | 30 January 1995 | Discusses Conditions Affecting Safety of Project That Documents Problem Encounter W/Spillway EDG at Plant Main Dam & Informs on 950103 Spillway EDG Failed to auto-start During Performance of Monthly Periodic Test | |
ML20078E125 | 25 January 1995 | Submits Notification Re Stationary Source Permit to Construct & Operate an EDG | |
ML18153B218 | 23 January 1995 | Informs That Scientific Ecology Group,Inc Received Shipment S-94-14 Which Consists of 3 B-25 Boxes of Asbestos | |
ML18153B202 | 3 January 1995 | Submits Follow Up to Telephone Notification Re Excursion of Total Suspended Solids Limitations at Plant Outfall 181 | |
ML20080C138 | 30 November 1994 | Responds to Issues Identified in Repts for Technical & Lab Insps on 941018 & 20.Corrective Actions:Corrected DMR Forms Completed & Submitted to Dept of Environ Quality & TSS Worksheet Form Revised | |
ML20077C248 | 22 November 1994 | Discusses Licensee Request for Relief from Ph Limitations in Plant Current Vpdes Permit at Outfalls 003 & 004 | |
ML20078G842 | 9 November 1994 | Submits Response to Violations Noted in Insp Repts 50-338/94-10 & 50-339/94-10.Corrective Actions:Upset Conditions Corrected & Facility Performance Inproved | |
ML18153B061 | 30 August 1994 | Requests 60-day Extension for Submittal of Initial Abatement Rept & SCR | |
ML20071L628 | 28 July 1994 | Ack Receipt of Detailed Response to NPDES Insp Rept |