Category:Letter type:RA
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:RA"
The following 200 pages are in this category, out of 1,682 total.
(previous page) (next page)R
- RA-01-125, Submittal of Revision 2, Maine Yankee License Termination Plan
- RA-02-008, Transmittal of Special Report, Transuranic and Other Hard to Detect Radionuclides in Maine Yankee Sample Media.
- RA-02-053, Annual Report of 10CFR72.48 Changes, Tests & Experiments
- RA-02-104, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-02-109, Independent Spent Fuel Storage Installation Registration of Spent Fuel Dry Cask Storage Cask in Use
- RA-02-112, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Independent Spent Fuel Storage Installation
- RA-02-116, Registration of Spent Fuel Dry Cask Storage Cask in the Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-02-121, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-02-130, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-02-134, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-02-142, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-02-155, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-02-163, Request for Exemption from Certain Requirements of NRC Regulations 10 CFR 72.212(a), 72.212(b)(2)(i), 72.212(b)(7), and 72.214
- RA-03-003, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-0059, Submittal of Wolf Creek Nuclear Operating Corporation Evaluation of Stress Corrosion Cracking for Component Cooling Water System Piping
- RA-03-025, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-029, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-033, Decommissioning Funding Status Report - 10 CFR 50.75(f)
- RA-03-038, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-049, Registration of Spent Fuel Dry Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-073, Registration of Spent Fuel Dry Cask Storage Cask in Use Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-074, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-081, Application for Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-082, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-090, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-092, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-095, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-099, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-103, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-105, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-114, Reply to Notice of Violation
- RA-03-118, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-119, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-120, Registration of Spent Fuel Dry Cask Storage in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-126, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-127, Registration of Spent Fuel Dry Cask Storage Cask in Use at Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-131, Annual Effluent Release Report
- RA-03-136, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-137, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-138, Registration of Spent Fuel Dry Cask Storage in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-143, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-147, Request for Exemption from NRC Certificate of Compliance No. 1015, Amendment 2, Technical Specification B3.4.3.6
- RA-03-148, Request for Further Exemption from the Financial Protection Requirements of 10CFR140.11(a)(4) and Related Amendment to Indemnity Agreement No. B-51
- RA-03-149, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-150, Registration of Spent Fuel Dry Cask Storage in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-153, Proposed Change No. 217: License and Technical Specification
- RA-03-155, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-157, Registration of Spent Fuel Dry Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-159, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-160, Supplemental Information for License No. DPR-36, Request for Exemption from NRC Certificate of Compliance No. 1015, Amendment 2, Technical Specification B3.4.2.6
- RA-03-163, Registration of Spent Fuel Dry Cask Storgage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-172, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-173, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-175, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-178, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-179, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-03-187, Registration of Spent Dry Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-04-002, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-04-003, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-04-0049, Independent Spent Fuel Storage Installation, Annual Report of Individual Exposure Monitoring for 2003
- RA-04-006, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-04-009, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-04-011, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-04-012, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-04-018, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-04-020, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-04-025, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee Independent Spent Fuel Storage Installation
- RA-04-028, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee ISFSI
- RA-04-030, Registration of Spent Fuel Dry Cask Storage Cask in Use at the Maine Yankee ISFSI
- RA-04-035, License Amendment Request: Release of Non-ISFSI Site Land
- RA-04-037, Decommissioning Funding Status Report - 10 CFR 50.75(f)
- RA-04-052, Release of Non-ISFSI Site Land - FSS Final Report No. 1A
- RA-04-084, Letter to the USNRC from Michael Meisner Regarding Maine Yankee 20 Day Response to Order for Implementation of Additional Security Measures
- RA-04-086, Annual Effluent Release Report
- RA-04-088, License Amendment Request - Release of Non-ISFSI Site Land Re Proposed Changed 218, Supplement 3
- RA-05-002, Release of Non-ISFSI Site Land - FSS Final Report No. 7
- RA-05-003, Technical Basis Document for NRC Review: Exploranium GR-130 Minimum Detectable Concentration (MDC) of Cs-137 and Co-60 in Surface Soil - 30 Day Notice Per Ltp Requirement
- RA-05-004, Area Classification Change: Storm Drains (D3500) - Section 7
- RA-05-005, Response to NRC RAI on FSS Report No. 4
- RA-05-007, Updated Response to Order EA-03-097, Implementation of Additional Security Measures Associated with Access Authorization at Independent Spent Fuel Storage Installations
- RA-05-008, Response to NRC Rai'S on FSS Final Report Nos. 1 and 2
- RA-05-0088, Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
- RA-05-0089, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks
- RA-05-009, Transmittal of Maine Yankee Release of Non-ISFSI Site Land - FSS Final Report No. 8. Proposed Change No. 218, Supplement 15
- RA-05-0091, Voluntary Response to Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations.
- RA-05-0093, Independent Spent Fuel Storage Installation, Nuhoms - 24PTH System - Thermal Performance Measurements
- RA-05-010, Release of Non-ISFSI Site Land - FSS Final Report No. 8 - Attachment I, Figures 1 and 2 and Attachment II Header Page
- RA-05-0104, Transmittal of Core Operating Limits Report
- RA-05-011, Response to NRC Comments on Maine Yankee Area Classification Change: Storm Drains (D3500) - Section 7
- RA-05-012, Maine Yankee'S License Termination Plan
- RA-05-013, Licensing Point-of-Contact and NRC Service List for Maine Yankee Correspondence
- RA-05-014, Report of Changes to the License Termination Plan Under 10 CFR 50.59
- RA-05-015, Decommissioning Funding Status Report - 10 CFR 50.75(f) - 2004
- RA-05-016, Response to NRC RAI on FSS Final Report No. 5
- RA-05-017, Release of Non-ISFSI Site Land - Final Status Survey (FSS) Final Report No. 9
- RA-05-019, Response to NRC RAI on FSS Final Report Nos 1 and 2
- RA-05-021, Co. 2004 Radiological Reports
- RA-05-022, Response to NRC RAI on FSS Final Report No. 6
- RA-05-023, Release of Non-ISFSI Site Land - Final Status Survey Final Report No. 9A, Revision 0
- RA-05-024, Response to NRC RAI on Use of 10CFR50.59
- RA-05-025, Annual Radiological Environmental Operating Report
- RA-05-026, Release of Non-ISFSI Site Land - FSS Final Report Nos. 1 and 2 - Resolution
- RA-05-027, Response to NRC RAI on FSS Final Report No. 7
- RA-05-028, License Amendment Request: Release of Non-ISFSI Site Land
- RA-05-029, Conditional Acceptance of FSS Final Reports
- RA-05-031, Release of Non-ISFSI Site Land - FSS Final Report No. 10
- RA-05-032, Request for Exemption from 10 CFR 50.75(f)(1)
- RA-05-033, Release of Non-ISFSI Site Land - FSS Final Report No. I0A
- RA-05-035, Repsonse to NRC RAI on FSS Final Report No. 9A
- RA-05-041, Final Response to Order EA-03-097, Implementation of Additional Security Measures Associated with Access Authorization at Independent Spent Fuel Storage Installations
- RA-05-043, Enclosed Is the Annual Material Balance Report in Electronic Format for Maine Yankee Atomic Power Company (RIS-YNV) for the Period July 18, 2005
- RA-05-168, J.W. Tuffey Letter Dated September 20, 2005 Regarding Indian Point
- RA-06-0067, Annual Radioactive Effluent Release Report - Report 29
- RA-07-0012, Inservice Inspection Program Third Interval, First Period, Refueling Outage 15 Owner'S Activity Report
- RA-07-023, Sea Turtle Incidental Take Report 2007-1
- RA-07-030, Sea Turtle Incidental Take Report 2007-2
- RA-07-036, Additional Information Supporting the Relief Request Associated with the Third Inservice Inspection (ISI) Interval and the Second Containment Inservice Inspection (Cisi) Interval
- RA-07-038, Response Letter to Mr. Vanderhoef on 3/14/07 - RA Action Item 07-038
- RA-07-079, Submittal of Program Plan Associated with the Third Inservice Inspection (ISI) Interval and the Second Containment Inspection (Cisi) Interval
- RA-07-090, Response to Lisa Rainwater Letter Dated May 2, 2007
- RA-07-261, Response to Alliance for a Clean Environment 12/22/2007 Letter Concerning for the Alliance for a Clean Environment Possible Construction of a Trash-to-Ethanol Plant Approximately One Mile from Limerick Nuclear Plant
- RA-08-001, Non-Routine Operating Report of Important Environmental Event
- RA-08-002, Amergen Energy Co, LLC and Exelon Generation Co, LLC - Response to Request for Additional Information Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requ
- RA-08-0029, Additional Extension to Complete Corrective Actions for NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
- RA-08-004, Technical Specification Change Request No. 348 - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR)
- RA-08-006, Submittal of Exelon Generation Company, LLC and Amergen Energy Company, LLC Quality Assurance Topical Report, NO-AA-10, Revision 80
- RA-08-008, Commitment Clarifications Related to the Aging Management Program for the Drywell Shell, Associated with Amergen'S License Renewal Application
- RA-08-011, Response to Request for Additional Information - Exelon/Amergen Application to Revise Technical Specifications Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement..
- RA-08-0116, Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System
- RA-08-013, Company, Llc/Amergen Energy Company, LLC - 60-Day Response to NRC Bulletin 2007-01, Security Officer Attentiveness
- RA-08-015, Maine Yankee Independent Spent Fuel Storage Installation Estimated Dose Report, Annual Radiological Environmental Operating Report and Annual Radioactive Effluent Release Report for 2007
- RA-08-017, Independent Spent Fuel Storage Facility, Annual Radioactive Effluent Release Report for 2007
- RA-08-021, Emergen'S Response to Request for Additional Information Re Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements
- RA-08-022, Commitment Change Summary Report - 2007
- RA-08-024, Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.
- RA-08-025, Puglisi, Linda - Town of Cortlandt Letter Dated 01/28/08 Regarding Entergy Civil Penalty
- RA-08-030, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report
- RA-08-032, RA-08-032, M. Elie, Westchester Citizen'S Awareness Network - Letter Dated 2/4/08 Regarding the Indian Point Licensee Renewal Hearing Process
- RA-08-032, Transmittal of Oyster Creek, Annual Radioactive Effluent Release Report for 2007
- RA-08-033, County of Rockland Letter Dated 2/8/08 Regarding Entergy Civil Penalty
- RA-08-041, Submittal of Changes to Technical Specifications Bases
- RA-08-042, Transmittal of Annual Radiological Environmental Operating Report - 2007
- RA-08-045, Response to Draft Request for Additional Information - Amergen Application to Revise Technical Specifications Regarding Secondary Containment Operability Requirements During Refueling
- RA-08-046, Independent Spent Fuel Storage Installation Quality Assurance Program - Revisions 31 and 32
- RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I
- RA-08-050, 10 CFR 50.46 Annual Report
- RA-08-056, Supplement to: License Amendment Request to Change Technical Specification Unit Staff Qualifications - Education and Experience Eligibility Requirements for Licensed Operators
- RA-08-057, Unit 1, Application for Approval of License Transfers
- RA-08-060, Transmittal of Supplemental Response - Amergen Application to Revise Technical Specifications Secondary Containment Operability Requirements During Refueling
- RA-08-061, Sea Turtle Incidental Take Reports 2008-1 and 2008-2
- RA-08-062, Response to Request for Additional Information Concerning Technical Specification Change Request No. 348 - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR)
- RA-08-063, Response to Request for Additional Information - Technical Specification Change Request No. 374 - Revision to Mechanical Snubber Functional Testing Requirements
- RA-08-064, Issuance of Core Operating Limits Report for Cycle 21, Revision 3
- RA-08-068, Amergen Energy Company, LLC, Response to the Request for Additional Information Regarding Resolution of NRC Bulletin 2007-01, Security Officer Attentiveness.
- RA-08-069, Unit 1, Application for Approval of License Transfers - Response to Request for Additional Information
- RA-08-075, Sea Turtle Incidental Take Reports 2008-3, 2008-4, and 2008-5, OCNGS Reached 50% of Annual Incidental Take Limit of Eight for Kemp'S Ridley as Established in National Marine Fisheries Service 2005 Biological Opinion
- RA-08-076, Request Approval of Change to Exelon Generation Company, LLC, and Amergen Energy Company, LLC, Quality Assurance Topical Report
- RA-08-086, Sea Turtle Incidental Take Report 2008-6
- RA-08-087, Response to Draft Request for Additional Information - Amergen Application to Revise Technical Specifications Regarding Secondary Containment Operability Requirements During Refueling (Tscr 338)
- RA-08-088, Annual Sea Turtle Incidental Take Report for 2008
- RA-08-091, Submittal of Revised Bases Page - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR)
- RA-08-097, Secondary Containment Capability Test
- RA-08-099, Independent Spent Fuel Storage Installation - Annual Report
- RA-08-100, Special Report for Inoperability of Turbine Building High Range Radioactive Noble Gas Monitor
- RA-08-106, Issuance of the Oyster Creek Core Operating Limits Report for Cycle 22, Revision 4
- RA-08-107, Unit 1, 2008 Annual Report -Guarantees of Payment of Deferred Premiums
- RA-08-114, NRC Response to D. Lochbaum Regarding Current Condition of Oyster Creek Drywell and Associated 2.0 Factor of Safety Margin
- RA-08-114, NRC Response to J. Tauro - Grandmothers, Mothers, and More for Energy Safety (Grammes) Regarding Oyster Creek
- RA-08-115, Request for NRC Written Consent to Proposed Amendments to Trust Agreement the Merger of Amergen Energy Company, LLC Into Its Parent, Exelon Generation Company, LLC
- RA-08-116, Unit 1 - Notification of Expected Date of Transfer of Nuclear Units to Exelon Generation Company, LLC
- RA-08-191, RA 08-191, Response to D. Lochbaum Regarding Beaver Valley Generic Letter 2008-01
- RA-09-001, Brunswick, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2- Semiannual 10 CFR 26 Fitness for Duty Program Data for the Period of July 1, 2008 Through December 31, 2008
- RA-09-001, Redacted - Maine Yankee - Submittal of the Defueled Safety Analysis Report Revision 22
- RA-09-002, Biennial Decommissioning Funding Status Report
- RA-09-003, Maineyankee ISFSI - Submittal of Changes to Emergency Plan Under 50.54(q)
- RA-09-003, Onsite Property Insurance Coverage
- RA-09-004, Submittal of Evidence of Guarantee of Payment of Deferred Premiums
- RA-09-005, NRC Service List Correspondence
- RA-09-006, License Termination Plan, Rev. 5
- RA-09-008, Maine Yankee - Decommissioning Funding Assurance Status Report - 10 CFR 50.75
- RA-09-009, 10 CFR 54.21(b) Annual Amendment to Oyster Creek Generating Station License Renewal Application
- RA-09-011, Submittal of Analytical Evaluation in Accordance with IWB-3134(b)
- RA-09-012, Maine Yankee Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report and Annual Radioactive Effluent Release Report for 2008
- RA-09-015, Proposed Relief Request to the Requirements of 10 CFR 50.55a Concerning Reactor Pressure Vessel Circumferential Shell Welds
- RA-09-016, Request for Exemptions from Physical Security Requirements
- RA-09-016, Supplement to License Amendment Request for: Oyster Creek Technical Specification Change Request No. 336, Three Mile Island Unit 1 Technical Specification Change Request No. 330, Deletion of Technical Specification Requirements for Review
- RA-09-017, Crystal River, Unit 3, Request for Exemptions from Physical Security Requirements
- RA-09-017, Letter from Exelon, Subj: Request for Exemption from 10 CFR 50, Fire Protection of Safe Shutdown Capability
- RA-09-017, Oyster Creek, Request for Exemption from 10 CFR 50, Appendix R, Section Iii.G., Fire Protection of Safe Shutdown Capability (Phase 1)
- RA-09-018, Letter from Exelon, Subj: Request for Exemption from 10 CFR 50, Fire Protection of Safe Shutdown Capability
- RA-09-018, Oyster Creek - Request for Exemption from 10 CFR 50, Appendix R, Section Iii.G, Fire Protection of Safe Shutdown Capability (Phase 2)
- RA-09-018, Shearon Harris, Unit 1, Request for Exemptions from Physical Security Requirements
- RA-09-019, Oyster Creek Nuclear Generating Station (Ocgns) - Refueling Outage 22 (1 R22) Inservice Inspection (ISI) Summary Report and Attachments
- RA-09-019, Request for Exemptions from Physical Security Requirements
- RA-09-020, NRC Correspondence Distribution List Update
- RA-09-028, Physical Security Plan for Maine Yankee Independent Fuel Storage Installation
- RA-09-029, Oyster Creek, Supplement to License Amendment Request Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action, and Clarification of
- RA-09-029, Supplement to License Amendment Request Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action, and Clarification of A..
- RA-09-033, Oyster Creek Nuclear Generation Station - Annual Radioactive Effluent Release Report for 2008
- RA-09-033, Physical Security Plan for Maine Yankee Independent Fuel Storage Installation