RA-26-0013, Application to Revise Technical Specifications to Adopt TSTF-585, Revise LCO 3.0.3 to Require Managing Risk, and TSTF-597, Eliminate LCO 3.0.3 Mode 2 Requirement12 February 2026
RA-25-0248, Application to Revise Technical Specifications to Adopt TSTF-585, Revise LCO 3.0.3 to Require Managing Risk12 February 2026
RA-26-0021, Inservice Inspection (ISI) Owners Activity Report for Refueling Outage C2R273 February 2026
RA-26-0015, Duke Energy Progress, LLC, Steam Generator Tube Inspection Report Consistent with TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Implementation29 January 2026
RA-25-0280, Supplement to License Amendment Request to Adopt the Full Spectrum Loss of Coolant Accident Methodology and Axiom Fuel Cladding Topical Reports8 January 2026
RA-25-0156, Of DPC-NE-3001-P, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology22 December 2025
RA25-055, 2024 Regulatory Commitment Change Summary Report18 December 2025
RA-25-0263, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2 December 2025
RA-25-0264, Proposed Alternative for Acceptance of Through-wall Flaw in a Service Water System Valve Body17 November 2025
RA-25-0243, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Timing30 October 2025
RA-21-0015, Duke Energy Carolinas, Llc., License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits30 October 2025
RA-25-0128, Snubber Program Plan Revision, AD-EG-CNS-1618, Revision 7, Catawba Nuclear Station Snubber Program Plan29 October 2025
RA-24-0247, AP1000 Combined License Application Departure Report Update and Annual Final Safety Analysis Report (FSAR) Update23 October 2025
RA25-049, Post Examination Submittal Letter (LAS 2025)10 October 2025
RA-25-0210, Team Electric Plant, Units 1 and 2 - Notice of Intent to Pursue Subsequent License Renewal9 October 2025
RA-24-0273, License Amendment Request to Revise Technical Specifications to Use Online Monitoring Methodology9 October 2025
RA-25-0237, Subsequent License Renewal Application Supplement 21 October 2025
RA-18-0089, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors30 September 2025
RA-25-0227, Cycle 27 Core Operating Limits Report, Revision 030 September 2025
RA-19-0085, License Amendment Request to Revise Technical Specifications to Adopt Risk-Inormed Completion Times TST-505, Revision 2, Provide RIsk-Informed Extended Completion Times - RITSTF Initiative 4b and TSTF-591, Revision 0.30 September 2025
RA-25-0197, Cycle 25 Core Operating Limits Report (Colr), Revision 222 September 2025
RA-25-0217, Core Operating Limits Report (COLR) for Unit 2 Cycle 28 Reload Core4 September 2025
RA-25-0213, Unit Number 2, Subsequent License Renewal Application Responses to Requests for Additional Information (RAI) and Requests for Confirmation of Information (RCI)4 September 2025
RA-25-0200, Subsequent License Renewal Application Supplement 128 August 2025
RA-25-0205, Independent Spent Fuel Storage Installation - Registration of Use of Spent Fuel Casks26 August 2025
RA-25-0216, Duke Energy Brunswick Emergency Plan Annex25 August 2025
RA-25-0195, Response to Request for Confirmation of Information (RCI) Regarding Proposed Exemptions from 10 CFR 50.55a(a)(3)(ii), Which Incorporates by Reference Regulatory Guide 1.147, Revision 21, for Code Case N-921, and 10 CFR 50.55a(y)21 August 2025
RA-25-0209, Independent Spent Fuel Storage Installation (ISFSI) - Loaded Spent Nuclear Fuel Into NAC-MAGNASTOR Dry Cask Storage Systems (Model No. Magnastor) as Controlled by Certificate of Compliance Number 1031, Amendment Number 721 August 2025
RA25-030, Registration of Use of a Cask to Store Spent Fuel20 August 2025
RA-25-0075, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies19 August 2025
RA-25-0176, Refuel 30 (M1 R30) Inservice Inspection (ISI) Report18 August 2025
RA-25-0014, License Amendment Request to Adopt the Full Spectrum Loss of Coolant Accident Methodology and Axiom Fuel Cladding Topical Reports and Associated 10 CFR 50.46 Exemption Request for Use of Axiom Fuel Cladding18 August 2025
RA25-029, Registration of Use of a Cask to Store Spent Fuel13 August 2025
RA-25-0196, Magnastor ISFSI Cask Registration7 August 2025
RA-25-0181, (Mns), Report of Changes to Duke Energy McGuire Emergency Plan Annex30 July 2025
RA25-028, Registration of Use of a Cask to Store Spent Fuel30 July 2025
RA-25-0064, Proposed Alternative for Inservice Testing Interval Code of Record24 July 2025
RA25-027, Registration of Use of a Cask to Store Spent Fuel23 July 2025
RA25-026, Registration of Use of a Cask to Store Spent Fuel17 July 2025
RA-25-0170, Registration for Use of General License Spent Fuel Cask Numbers 182, 183, and 18416 July 2025
RA25-025, Registration of Use of a Cask to Store Spent Fuel16 July 2025
RA-25-0178, Independent Spent Fuel Storage Installation - Supplement to Registration of Use of Spent Fuel Casks2 July 2025
RA25-024, Registration of Use of a Cask to Store Spent Fuel1 July 2025
RA25-009, Post-Outage Inservice Inspection (ISI) Summary Report27 June 2025
RA25-023, Registration of Use of a Cask to Store Spent Fuel26 June 2025
RA25-036, Cycle 21 Core Operating Limits Report26 June 2025
RA-25-0160, Registration for Use of General License Spent Fuel Casks18 June 2025
RA-25-0144, Registration for Use of General License Spent Fuel Cask Numbers 180 and 18112 June 2025
RA-25-0153, EAL Technical Basis Document, Revision 7, and EAL Wallchart, Revision 512 June 2025
RA-25-0157, Registration of Spent Fuel Storage Casks11 June 2025