PNO-V-87-032, on 870422,small Stones in Bottom Hemispherical Head of Hot Leg Side of Steam Generator 1 Discovered.Work Activities in Steam Generators Suspended Until Primary Side of Steam Generators 1 & 2 Inspected

From kanterella
(Redirected from PNO-V-87-032)
Jump to navigation Jump to search
PNO-V-87-032:on 870422,small Stones in Bottom Hemispherical Head of Hot Leg Side of Steam Generator 1 Discovered.Work Activities in Steam Generators Suspended Until Primary Side of Steam Generators 1 & 2 Inspected
ML20209D384
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/23/1987
From: Richards S, Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
References
PNO-V-87-032, PNO-V-87-32, NUDOCS 8704290259
Download: ML20209D384 (1)


PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-V-87-32 Date: 04/23/87 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by Region V staff on this date.

FACILITY: Arizona Nuclear Power Project Emergency Classification Palo Verde Unit 3 Notification of Unusual Event DOCKET N0. 50-530 Alert Site Area Emergency General Emergency X Not Applicable

SUBJECT:

FOREIGN MATERIAL FOUND IN STEAM GENERATOR At about 3:00 pm on April 22, 1987, with the unit in Mode 5 and preparing to perform selccted preventive tube plugging in the steam generators, a worker found a number of small stones in the bottom hemispherical head of the hot leg side of No. 1 Steam Generator. Scaffolding and a wooden platform had recently been erected in the hot leg side in preparation for the tube plugging activity. Similar platforms and scaffolding w:re also erected in the cold leg side, as well as on both sides of the No. 2 Steam Generator. The licensee has suspended all work activities in the steam generators until the primary side of both steam generators can be inspected. Dams were installed in the hot and cold legs close to the steam generator on April 18, prior to scaffold and platform erection, to prevent material from inadvertently entering into the reactor coolant system piping. The licensee's investigation into whether the foreign material tas unintentionally brought into the steam generator, or whether it was a deliberate act, is currently ongoing. The resident inspector is witnessing the licensee's insp;ction of the primary side of the steam generators.

Unit 3 recently completed initial fuel load and initial criticality is scheduled for July 1987.

This information is current as of 2:00 pm PDT, April 23, 1987.

CONTACT: R. Zimennan, Sr. S. Richards (602)386-5760 (415)943-3853 DISTRIBUTION H St. NNBB Phillips U $E/W Willste Air Rights Ff8 Mail:

Chairman Zech EDO NRR IE NMSS ADM:DMB Comm. Roberts PA OIA RES 00T:Trans Only Comm. Asselstine MPA AE0D Comm. Bernthal OGC Comm. Carr Regions: