PNO-V-86-046, on 860721,two Seismic Events Occurred in Mammoth Lakes Area.Largest Event Measured 6.2 on Richter Scale & Second Measured 4.4.First Event Not Felt at Diablo Canyon.Second Event Triggered Teratec Recording

From kanterella
Jump to navigation Jump to search
PNO-V-86-046:on 860721,two Seismic Events Occurred in Mammoth Lakes Area.Largest Event Measured 6.2 on Richter Scale & Second Measured 4.4.First Event Not Felt at Diablo Canyon.Second Event Triggered Teratec Recording
ML20207J559
Person / Time
Site: Diablo Canyon, Rancho Seco, 05000000
Issue date: 07/21/1986
From: Mendonca M, Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
References
PNO-V-86-046, PNO-V-86-46, NUDOCS 8607290165
Download: ML20207J559 (1)


[. Cd b

/

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-V-86-46 Date 07/21/86 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification er evaluation and is basically all that is known by Region V staff on this date.

FACILITY: PACIFIC CAS & ELECTRIC COMPANY Emergency Classification DIABLO CANYON UNITS 1 & 2 Notification of Unusual Event DOCKET NOS. 50-275/323 Alert Site Area Emergency SACRAMENTO MUNICIPAL UTILITY DISTRICT General Emergency RANCHO SECO XX Not Applicable DOCKET NO. 50-312

SUBJECT:

SEISMIC EVENTS IN MAMMOTH LAKES AREA As a part of a series of seismic events that began 7/20/86, two seismic events occurred on 7/21/86 in the Mammoth lakes area. The location was east of Lake Crowley and about 15 miles northwest of Bishop, California (37.5' N and ll8.4'W). The largest event occurred at 0508 PDT on 7/21/86 and measured 6.2; the second occurred at 0744 PDT measuring 4.4 magnitude. The location was greater than 50 miles from any nuclear power plant.

The first event was not felt at Diablo Canyon; however, the second, smaller event did trigger the very sensitive nontechnical specification Terater, recording instrumentation.

The technical specification required recorders did not trigger. The licensee is analyzing

'the data.

Naither event was felt in the Rancho Seco Control Room and recording instrumentation did not trigger.

Diablo Canyon Unit 1 is currently at 72% power and Unit 2 is at 100%. Rancho Seco is in cold shutdown.

This information is current as of 1000 PDT, July 21, 1986.

CONTACT: M. Mendonca, RV L. Miller, Jr.

FTS 463-3720 FTS 463-8369 DISTRIBUTION H-St. /I 2 7 MNBB /NPhillips lW E/W /'2fWillste/ % Air Rights / 2cf Mail:

Chairman Zech EDO NRR IE NMSS ADM:DMB PA OIA RES DOT:Trans Only Ccmm. Bernthal MPA AEOD Coirm. Roberts ELD gy gg_ pg _ y,-

Comm. Asselstine Regions:MF / , /

SECY INP02

  • 2/ NSAC 2:/ 2-ACRS Licensee : /GE- 7: 5s,5m up- U T CA (Reactor Licensees)' REGION V: FORM 211 PDR' Resident Inspector _ (Revised 3/14/83) p c. - 7: 2r O PDR b~