PNO-V-93-013, on 930809,during pre-announced anti-nuclear demonstration,13 Protestors Illegally Entered Plant Access Gate & Immediately Taken Into Custody by Sheriff Deputies. Demonstration Related to CP Recapture Hearings for Plant | 9 August 1993 | PNO-V-93-013:on 930809,during pre-announced anti-nuclear demonstration,13 Protestors Illegally Entered Plant Access Gate & Immediately Taken Into Custody by Sheriff Deputies. Demonstration Related to CP Recapture Hearings for Plant | |
PNO-V-92-033, on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield | 20 October 1992 | PNO-V-92-033:on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield | Earthquake |
PNO-V-91-003, on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core | 7 March 1991 | PNO-V-91-003:on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core | |
PNO-V-90-033, on 900726,observed Crack in Charging Pump Suction Header Piping Caused by Boric Acid Crystals on Elbow of Pump.Licensee Considers Piping Operable & to Be Repaired W/O Plant Shut Down.Inspector Monitoring Plant | 27 July 1990 | PNO-V-90-033:on 900726,observed Crack in Charging Pump Suction Header Piping Caused by Boric Acid Crystals on Elbow of Pump.Licensee Considers Piping Operable & to Be Repaired W/O Plant Shut Down.Inspector Monitoring Plant | Boric Acid |
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies | 21 September 1989 | PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies | |
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing | 21 September 1989 | PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing | |
PNO-V-89-056, on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant | 12 September 1989 | PNO-V-89-056:on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant | |
ML20247N007 | 11 September 1989 | PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom | |
PNO-V-89-053, on 890901,Golden State Energy Proposal to Purchase Rancho Seco Submitted to Util,Including MOU for Purchase of Plant,Power Sale Agreement & Interim Operation & Maint of Facility & Rate Structure.Vote Expected on 890907 | 5 September 1989 | PNO-V-89-053:on 890901,Golden State Energy Proposal to Purchase Rancho Seco Submitted to Util,Including MOU for Purchase of Plant,Power Sale Agreement & Interim Operation & Maint of Facility & Rate Structure.Vote Expected on 890907 | |
PNO-V-89-050, on 890823,util Announced That Board of Directors Would Meet on 890825 Re Proposed Golden State Energy Purchase of Plant.Key Issues Listed,Including MOU Addressing Power Sale Agreement | 23 August 1989 | PNO-V-89-050:on 890823,util Announced That Board of Directors Would Meet on 890825 Re Proposed Golden State Energy Purchase of Plant.Key Issues Listed,Including MOU Addressing Power Sale Agreement | |
PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage | 8 August 1989 | PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage | Earthquake |
PNO-V-89-044, on 890720,util Board Voted by 4-1 Vote to Enter Exclusive Negotiations W/Quadrex Corp for Possible Sale of Plant.Key Milestone Dates Listed.Board Maintained That Several Key Issues Must Be Addressed Before Voting on Sale | 21 July 1989 | PNO-V-89-044:on 890720,util Board Voted by 4-1 Vote to Enter Exclusive Negotiations W/Quadrex Corp for Possible Sale of Plant.Key Milestone Dates Listed.Board Maintained That Several Key Issues Must Be Addressed Before Voting on Sale | |
PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred | 5 July 1989 | PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred | Earthquake |
PNO-V-89-039, on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul | 3 July 1989 | PNO-V-89-039:on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul | |
PNO-V-89-036, on 890620,SMUD Voted 3-2 to Allow 10 Days for Qualified Private Bidders to Submit Proposals to Take Over Facility.Conditions Imposed on Bidders Listed.Existing Quadrex Proposal Withdrawn | 21 June 1989 | PNO-V-89-036:on 890620,SMUD Voted 3-2 to Allow 10 Days for Qualified Private Bidders to Submit Proposals to Take Over Facility.Conditions Imposed on Bidders Listed.Existing Quadrex Proposal Withdrawn | |
PNO-V-89-035, on 890619,licensee Announced That D Keuter Had Been Appointed New Site Manager & Jr Shetler as Deputy Site Manager.Licensee Recognizes That Organizational Changes Subj to NRC Approval | 20 June 1989 | PNO-V-89-035:on 890619,licensee Announced That D Keuter Had Been Appointed New Site Manager & Jr Shetler as Deputy Site Manager.Licensee Recognizes That Organizational Changes Subj to NRC Approval | |
PNO-V-89-034, on 890615,offer to Assume Financial & Technical Responsibility for Plant Announced.Plant Presently in Cold Shutdown W/Activities Continuing Towards off-loading Reactor Core in Oct 1989 | 16 June 1989 | PNO-V-89-034:on 890615,offer to Assume Financial & Technical Responsibility for Plant Announced.Plant Presently in Cold Shutdown W/Activities Continuing Towards off-loading Reactor Core in Oct 1989 | |
PNO-V-89-033C, on 890609,plant Reached Cold Shutdown in Preparation for Reinstalling Refueling Bridge Into Reactor Bldg.Bridge Removed for Refurbishment/Mod.Reduction in Force of Nonessential Contractor Personnel in Progress | 12 June 1989 | PNO-V-89-033C:on 890609,plant Reached Cold Shutdown in Preparation for Reinstalling Refueling Bridge Into Reactor Bldg.Bridge Removed for Refurbishment/Mod.Reduction in Force of Nonessential Contractor Personnel in Progress | |
PNO-V-89-033B, on 890608,licensee Continuing Cooldown of Plant.Ceo Nuclear,J Firlit,Announced Resignation.Work Force Reductions Initiated Which Will Initially Involve Approx 420 Nonessential Contractor Clerical & Crafts Personnel | 8 June 1989 | PNO-V-89-033B:on 890608,licensee Continuing Cooldown of Plant.Ceo Nuclear,J Firlit,Announced Resignation.Work Force Reductions Initiated Which Will Initially Involve Approx 420 Nonessential Contractor Clerical & Crafts Personnel | |
PNO-V-89-033, on 890606,voters Defeated Measure K,Encouraging Util to Cease Operating Facility.Util Board Previously Announced That Plant Would Be Shutdown If Measure K Defeated.Safe Shutdown Plan Implemented | 7 June 1989 | PNO-V-89-033:on 890606,voters Defeated Measure K,Encouraging Util to Cease Operating Facility.Util Board Previously Announced That Plant Would Be Shutdown If Measure K Defeated.Safe Shutdown Plan Implemented | Safe Shutdown |
PNO-V-89-033A, on 890607,util Shut Down Plant & Entered Hot Shutdown Due to Voter Defeat of Measure K.Util Continuing to Implement Contingency Plan to Remove Plant from Svc. Reductions in Site Work Force Under Consideration | 7 June 1989 | PNO-V-89-033A:on 890607,util Shut Down Plant & Entered Hot Shutdown Due to Voter Defeat of Measure K.Util Continuing to Implement Contingency Plan to Remove Plant from Svc. Reductions in Site Work Force Under Consideration | |
PNO-V-89-030, on 890518,airborne Process Monitors for Reactor Bldg Stack,Auxiliary Bldg Stack & Auxiliary Bldg Grade Level Vent Inoperable.Caused by Computer Controlled Svc Air Purge Valves in Open Position.Possibly Caused by Software Errors | 19 May 1989 | PNO-V-89-030:on 890518,airborne Process Monitors for Reactor Bldg Stack,Auxiliary Bldg Stack & Auxiliary Bldg Grade Level Vent Inoperable.Caused by Computer Controlled Svc Air Purge Valves in Open Position.Possibly Caused by Software Errors | Grab sample |
PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred | 3 April 1989 | PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred | Earthquake |
PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants | 23 March 1989 | PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants | |
ML20196B688 | 30 November 1988 | PNS-V-88-006:on 881126,licensee Received Telcon Alleging That Nonlicensed Equipment Operator Observed Using Illegal Drugs.Individual Submitted to Urinalysis Test & Showed Positive for Marijuana.Individual Terminated on 881130 | Fitness for Duty |
PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process | 9 November 1988 | PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process | |
PNO-V-88-059, on 881024,licensee Determined That Reactor Coolant Unidentified Leakage Was 1.06 Gpm.Leakage Could Not Be Reduced.Reactor Was Shut Down.No Entry Inside Shield Permitted.Repair Method to Be Determined Upon Next Entry | 25 October 1988 | PNO-V-88-059:on 881024,licensee Determined That Reactor Coolant Unidentified Leakage Was 1.06 Gpm.Leakage Could Not Be Reduced.Reactor Was Shut Down.No Entry Inside Shield Permitted.Repair Method to Be Determined Upon Next Entry | |
PNO-V-88-058, on 881014,reactor Tripped from Phase Imbalance on 6.9 Kv Power to Four Operating Reactor Coolant Pumps.Grid Disturbance,Which Affected Startup & Auxiliary Transformer Power Sources on One Offsite Power Line,Possible Initiator | 14 October 1988 | PNO-V-88-058:on 881014,reactor Tripped from Phase Imbalance on 6.9 Kv Power to Four Operating Reactor Coolant Pumps.Grid Disturbance,Which Affected Startup & Auxiliary Transformer Power Sources on One Offsite Power Line,Possible Initiator | |
PNO-V-88-048, on 880717,unit Manually Tripped & Natural Cooldown Commenced as Result of Ground Fault in 12 Kv non- Vital Buses.Event Investigation Team Formed to Determine Location & Cause of Ground Fault | 18 July 1988 | PNO-V-88-048:on 880717,unit Manually Tripped & Natural Cooldown Commenced as Result of Ground Fault in 12 Kv non- Vital Buses.Event Investigation Team Formed to Determine Location & Cause of Ground Fault | |
PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley | 27 June 1988 | PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley | Earthquake |
PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities | 13 June 1988 | PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities | Earthquake |
PNO-V-88-036, on 880607,voters Voted on Two Measures Re Future Operations of Plant.Measure B,Which Required Immediate Shutdown of Plant,Failed to Pass.Measure C,Which Will Continue Plant Operations on Trial Basis,Passed | 8 June 1988 | PNO-V-88-036:on 880607,voters Voted on Two Measures Re Future Operations of Plant.Measure B,Which Required Immediate Shutdown of Plant,Failed to Pass.Measure C,Which Will Continue Plant Operations on Trial Basis,Passed | |
PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends | 9 May 1988 | PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends | |
PNO-V-88-030, on 880504,reactor Tripped & Leak Discoverd on Letdown Cooler a Relief Valve.Util Conducting post-trip Review to Determine Cause of Trip & Confirm Source of Leak | 4 May 1988 | PNO-V-88-030:on 880504,reactor Tripped & Leak Discoverd on Letdown Cooler a Relief Valve.Util Conducting post-trip Review to Determine Cause of Trip & Confirm Source of Leak | |
PNO-V-88-029, on 880429,SMUD Released Info Re Potential Agreement W/Duke Power Co (DPC) Under Which DPC Employee Would Become Chief Executive Officer,Nuclear,Reporting to New Rancho Seco Mgt Committee.Meeting Planned on 880509 | 29 April 1988 | PNO-V-88-029:on 880429,SMUD Released Info Re Potential Agreement W/Duke Power Co (DPC) Under Which DPC Employee Would Become Chief Executive Officer,Nuclear,Reporting to New Rancho Seco Mgt Committee.Meeting Planned on 880509 | |
PNO-V-88-024, util Received Final Authorization from NRR to Restart Facility on 880330.Enhanced Operational Readiness Insp Team & Resident Insp Staff Observing Reactor Startup Which Will Require 6-10 H to Complete | 30 March 1988 | PNO-V-88-024:util Received Final Authorization from NRR to Restart Facility on 880330.Enhanced Operational Readiness Insp Team & Resident Insp Staff Observing Reactor Startup Which Will Require 6-10 H to Complete | |
PNO-V-88-023, on 880323,undervoltage Attachment of CRD Breaker Failed to Operate.Interference of Undervoltage Attachment Trip Lever W/Exterior Label Plate,Noted. Investigation Continuing | 24 March 1988 | PNO-V-88-023:on 880323,undervoltage Attachment of CRD Breaker Failed to Operate.Interference of Undervoltage Attachment Trip Lever W/Exterior Label Plate,Noted. Investigation Continuing | |
PNO-V-88-021, on 880315,leak of About 100 Gpm Occurred from Downstream Pressure Relief Valve While Opening Upstream Isolation Valve.Approx 650 Gallons of Water Released.No Radioactivity Released.Investigation Underway | 16 March 1988 | PNO-V-88-021:on 880315,leak of About 100 Gpm Occurred from Downstream Pressure Relief Valve While Opening Upstream Isolation Valve.Approx 650 Gallons of Water Released.No Radioactivity Released.Investigation Underway | Packing leak |
ML20147H084 | 1 March 1988 | PNS-V-88-001:on 880229,plant Notified of Bomb Threat. Licensee Conducted Routine Search,Found Three Suspicious Packages.Packages Examined & Found to Be Innocuous | |
PNO-V-88-017, on 880301,util Certified That All Prerequisites for non-nuclear Heatup of Plant to Normal Operating Test Temp & Pressure Completed.Reactor Criticality Scheduled for 880320 | 1 March 1988 | PNO-V-88-017:on 880301,util Certified That All Prerequisites for non-nuclear Heatup of Plant to Normal Operating Test Temp & Pressure Completed.Reactor Criticality Scheduled for 880320 | |
PNO-V-88-016, on 880224,RK Byrne Recommended Closure of Plant to Board of Directors at 880224 Meeting.Recommendation Will Be Considered by Board for Action on 880303.Licensee Continuing Loss of Offsite Power Testing | 25 February 1988 | PNO-V-88-016:on 880224,RK Byrne Recommended Closure of Plant to Board of Directors at 880224 Meeting.Recommendation Will Be Considered by Board for Action on 880303.Licensee Continuing Loss of Offsite Power Testing | |
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | 16 February 1988 | PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | |
PNO-V-88-011, on 880208,fire Occurred in Annunciator Control Cabinet B During Cold Shutdown.Cause of Fire Not Yet Determined.Cabinets a & B Electronically Isolated.All Testing Temporarily Suspended.No Loss of DHR Occurred | 9 February 1988 | PNO-V-88-011:on 880208,fire Occurred in Annunciator Control Cabinet B During Cold Shutdown.Cause of Fire Not Yet Determined.Cabinets a & B Electronically Isolated.All Testing Temporarily Suspended.No Loss of DHR Occurred | |
PNO-V-88-010, on 880207,licensee Inadvertently Drained Approx 1,100 Gallons of Slightly Contaminated Borated Water from Borated Water Storage Tank During Testing.Testing Suspended Until Investigation & Further Corrective Action Completed | 8 February 1988 | PNO-V-88-010:on 880207,licensee Inadvertently Drained Approx 1,100 Gallons of Slightly Contaminated Borated Water from Borated Water Storage Tank During Testing.Testing Suspended Until Investigation & Further Corrective Action Completed | |
PNO-V-88-008, on 880203,unplanned Start of Bruce Gm Diesel Generator a Occurred.Caused by Failure to Position Generator Control Switch While Performing Loss of Offsite Power Test. Further Startup Testing Suspended | 4 February 1988 | PNO-V-88-008:on 880203,unplanned Start of Bruce Gm Diesel Generator a Occurred.Caused by Failure to Position Generator Control Switch While Performing Loss of Offsite Power Test. Further Startup Testing Suspended | |
PNO-V-88-009, on 880204,individual May Have Received 458 Rem Exposure to Back of Left Knee from 43 Uci Co-60.Caused by Individual Welding on Dhr.Licensee Investigating Matter & Will Inform Region V of Results | 4 February 1988 | PNO-V-88-009:on 880204,individual May Have Received 458 Rem Exposure to Back of Left Knee from 43 Uci Co-60.Caused by Individual Welding on Dhr.Licensee Investigating Matter & Will Inform Region V of Results | |
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named | 2 February 1988 | PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named | |
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure | 4 January 1988 | PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure | |
PNO-V-87-084, on 871216,licensee Induced Unexpected Load Transient on One safety-related Diesel Generator During Loss of Offsite Power Test.Dhr & Control Units Unaffected.Cause Being Investigated | 16 December 1987 | PNO-V-87-084:on 871216,licensee Induced Unexpected Load Transient on One safety-related Diesel Generator During Loss of Offsite Power Test.Dhr & Control Units Unaffected.Cause Being Investigated | |
PNO-V-87-083, on 871213,reactor Tripped.Caused by Loss of Feed Water Pump 1-1.Cause of Trip Under Investigation. Variety of Maint Activities to Be Performed Before Restart | 14 December 1987 | PNO-V-87-083:on 871213,reactor Tripped.Caused by Loss of Feed Water Pump 1-1.Cause of Trip Under Investigation. Variety of Maint Activities to Be Performed Before Restart |