Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000275/1999012 | 13 September 1999 | Insp Repts 50-275/99-12 & 50-323/99-12 on 990711-0821. Noncited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support | Grab sample Internal Flooding Earthquake Fuel cladding Fire Protection Program Operability Assessment Siren |
IR 05000312/1999003 | 31 August 1999 | Insp Rept 50-312/99-03 on 990802-06.No Violations Noted. Major Areas Inspected:Decommissioning & Dismantlement Activities,Including Organization,Mgt & Cost Controls | Temporary Modification Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
IR 05000275/1999007 | 27 July 1999 | Insp Repts 50-275/99-07 & 50-323/99-07 on 990503-0714. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations & Engineering | Loop seal Probabilistic Risk Assessment |
IR 05000312/1999002 | 19 March 1999 | Insp Rept 50-312/99-02 on 990309-11.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communication & Testing & Maint | |
IR 05000275/1998016 | 16 November 1998 | Insp Repts 50-275/98-16 & 50-323/98-16 on 980913-1024.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Safe Shutdown Grab sample Enforcement Discretion Coatings |
IR 05000312/1998003 | 7 August 1998 | Insp Rept 50-312/98-03 on 980706-09.No Violations Noted. Major Areas Inspected:Review of Licensee Programs Related to SFP Safety,Status of Decommissioning,Safety Review & self-assessments & Radiological Safety Programs | High Radiation Area Scaffolding |
IR 05000275/1998011 | 22 July 1998 | Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.No Violations Noted.Major Areas Inspected:Circumstances, Potential Safety Consequences & Licensee Response & Actions Taken Re Authorization of Tagout W/O Written Procedure | |
IR 05000312/1998002 | 3 June 1998 | Insp Rept 50-312/98-02 on 980519-21.Violations Noted. Major Areas Inspected:Announced Insp of Licensee Physical Security Program | |
ML20248K630 | 3 June 1998 | Notice of Violation from Insp on 980519-21.Violation Noted:Inspector Determined That Licensee Failed to Review & Consider All Info Obtained During Background Investigation | |
IR 05000275/1998008 | 17 April 1998 | Insp Repts 50-275/98-08 & 50-323/98-05 on 980202-06,23-27 & 0302-18.No Violations Noted.Major Areas Inspected: Engineering | Safe Shutdown Boric Acid Time of Discovery Ultimate heat sink Biofouling Fire Protection Program |
ML20202C477 | 5 February 1998 | Notice of Violation from Insp on 980105-08.Violation Noted: on 971222,shipment of Scrap Metal,In Form of Auxiliary Boiler,Was Released from Rancho Seco Site W/O Having Been Surveyed | |
ML20202C498 | 5 February 1998 | Insp Rept 50-312/98-01 on 980105-08.Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls,Maint & Surveillance,Cold Weather Preparation,Decommissioning Performance & Status Review & Health Physics | Liquid penetrant |
IR 05000275/1998003 | 23 January 1998 | Insp Repts 50-275/98-03 & 50-323/98-03 on 980105-09.No Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation | Annual Radioactive Effluent Release Report |
ML20198K545 | 21 October 1997 | Notice of Violation from Insp on 970922-25.Violation Noted:On 970806,thermocouple for Spent Fuel Pool Temp Indicator Was Found to Be out-of-tolerance During Annual Calibration | |
IR 05000312/1997004 | 21 October 1997 | Insp Rept 50-312/97-04 on 970922-25.Violations Noted. Major Areas Inspected:Organization,Mgt,Cost Control,Safety Reviews,Design Changes,Mods,Decommissioning Performance & Status Review | Offsite Dose Calculation Manual Condition Adverse to Quality Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
IR 05000312/1997003 | 17 June 1997 | Insp Rept 50-312/97-03 on 970603-05.No Violations Noted. Major Areas Inspected:Records & Repts,Testing & Maint, Protected Area Barrier & Detection Aids,Assessment Aids, Alarm Station & Communication & Security System | |
IR 05000312/1997002 | 25 April 1997 | Insp Rept 50-312/97-02 on 970331-0403.No Violations Noted. Major Areas Inspected:Incremental Decommissioning Activities in Turbine Bldg,Radiation Protection,Sfp Activities & Quality Assurance | |
IR 05000312/1997001 | 21 March 1997 | Insp Repts 50-312/97-01 & 72-0011/97-01 on 970224-27.No Violations Noted.Major Areas Inspected:Licensee Planned Work Associated W/Dismantlement of Turbine Bldg & Radiological Controls Being Implemented During Work Activities | Offsite Dose Calculation Manual Coatings Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report |
IR 05000312/1996003 | 27 September 1996 | Insp Repts 50-312/96-03 & 72-0011/96-01 on 960909-12.No Violations Noted.Major Areas Inspected:Sfp & Radiological Ts,Radiological Exposure Controls & Implementation of New 10CFR49 Shipping Regulations | High Radiation Area Locked High Radiation Area |
IR 05000275/1994027 | 21 December 1994 | Insp Repts 50-275/94-27 & 50-323/94-27 on 941016-1126. Violations Noted.Major Areas Inspected:Operational Safety Verification,Plant Maint,Surveillance Observation,Plant Support Activities & in-office Review of LERs | Foreign Material Exclusion |
IR 05000312/1993006 | 2 September 1993 | Insp Rept 50-312/93-06 on 930819.No Violations or Deviations Noted.Major Areas Inspected:Licensee Employee Concerns Program | |
IR 05000312/1993004 | 11 August 1993 | Mgt Meeting Rept 50-312/93-04 on 930727.Major Areas Discussed:Status of Activities,Including Maint of Plant Equipment,Fire Protection Equipment & Plant Personnel Morale | |
PNO-V-93-013, on 930809,during pre-announced anti-nuclear demonstration,13 Protestors Illegally Entered Plant Access Gate & Immediately Taken Into Custody by Sheriff Deputies. Demonstration Related to CP Recapture Hearings for Plant | 9 August 1993 | PNO-V-93-013:on 930809,during pre-announced anti-nuclear demonstration,13 Protestors Illegally Entered Plant Access Gate & Immediately Taken Into Custody by Sheriff Deputies. Demonstration Related to CP Recapture Hearings for Plant | |
IR 05000312/1992007 | 10 December 1992 | Insp Rept 50-312/92-07 on 921110-11.No Deviations or Violations Noted.Major Areas inspected:1992 Annual Emergency Preparedness Exercise & Associated Critiques & Inspector Identified Items | |
PNO-V-92-033, on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield | 20 October 1992 | PNO-V-92-033:on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield | Earthquake |
PNO-V-91-003, on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core | 7 March 1991 | PNO-V-91-003:on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core | |
IR 05000312/1990014 | 14 November 1990 | Insp Rept 50-312/90-14 on 901003-04,09-11 & 1102.Violations Noted.Areas inspected:follow-up of Licensee Event Repts, Liquid Effluent,Solid Waste & Allegations | |
IR 05000275/1990017 | 22 October 1990 | Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-1008.Noncited Violations Noted.Major Areas Inspected:Physical Security Program | |
IR 05000312/1990011 | 31 July 1990 | Insp Rept 50-312/90-11 on 900527-0706.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Surveillance & Testing & QA | |
PNO-V-90-033, on 900726,observed Crack in Charging Pump Suction Header Piping Caused by Boric Acid Crystals on Elbow of Pump.Licensee Considers Piping Operable & to Be Repaired W/O Plant Shut Down.Inspector Monitoring Plant | 27 July 1990 | PNO-V-90-033:on 900726,observed Crack in Charging Pump Suction Header Piping Caused by Boric Acid Crystals on Elbow of Pump.Licensee Considers Piping Operable & to Be Repaired W/O Plant Shut Down.Inspector Monitoring Plant | Boric Acid |
ML20055J200 | 13 July 1990 | Notice of Violation from Insp on 900422-0609.Violations Noted:Work Order Which Provided Instructions for Replacement of Plant Turbine Driven Auxiliary Feedwater Pump Speed Governor Not Appropriate to Circumstances | |
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies | 21 September 1989 | PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies | |
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing | 21 September 1989 | PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing | |
IR 05000312/1989016 | 21 September 1989 | Enforcement Conference Rept 50-312/89-16 on 890915. Violations Noted.Major Areas Discussed:Violations Noted in Insp Rept 50-312/89-16 & Indications That Findings Represent Decrease in Mgt Commitment to Emergency Preparedness | |
IR 05000312/1989012 | 21 September 1989 | Insp Rept 50-312/89-12 on 890801-04,21-25 & 30.No Violations Noted.Major Areas Inspected:Occupational Exposure,Including Alara,Radwaste Sys,Liquid & Liquid Wastes & Radwaste Mgt & Transportation | Offsite Dose Calculation Manual |
PNO-V-89-056, on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant | 12 September 1989 | PNO-V-89-056:on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant | |
IR 05000312/1989014 | 11 September 1989 | Insp Rept 50-312/89-14 on 890828-0901.Violations Noted Re Failure to Conduct Required Semiannual Health Physics Drill & Initial Training.Major Areas Inspected:Operational Status of Emergency Preparedness Program | |
ML20247N007 | 11 September 1989 | PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom | |
PNO-V-89-053, on 890901,Golden State Energy Proposal to Purchase Rancho Seco Submitted to Util,Including MOU for Purchase of Plant,Power Sale Agreement & Interim Operation & Maint of Facility & Rate Structure.Vote Expected on 890907 | 5 September 1989 | PNO-V-89-053:on 890901,Golden State Energy Proposal to Purchase Rancho Seco Submitted to Util,Including MOU for Purchase of Plant,Power Sale Agreement & Interim Operation & Maint of Facility & Rate Structure.Vote Expected on 890907 | |
PNO-V-89-050, on 890823,util Announced That Board of Directors Would Meet on 890825 Re Proposed Golden State Energy Purchase of Plant.Key Issues Listed,Including MOU Addressing Power Sale Agreement | 23 August 1989 | PNO-V-89-050:on 890823,util Announced That Board of Directors Would Meet on 890825 Re Proposed Golden State Energy Purchase of Plant.Key Issues Listed,Including MOU Addressing Power Sale Agreement | |
ML20246C400 | 15 August 1989 | Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 | |
IR 05000312/1989010 | 10 August 1989 | Insp Rept 50-312/89-10 on 890603-0721.No Violations Noted. Major Areas Inspected:Areas of Operational Safety Verification,Health Physics & Security Observations,Maint, Surveillance & Testing & QA & Followup Items | Shutdown Margin |
ML20246Q030 | 10 August 1989 | Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods | |
PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage | 8 August 1989 | PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage | Earthquake |
ML20245E966 | 31 July 1989 | Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program | |
PNO-V-89-044, on 890720,util Board Voted by 4-1 Vote to Enter Exclusive Negotiations W/Quadrex Corp for Possible Sale of Plant.Key Milestone Dates Listed.Board Maintained That Several Key Issues Must Be Addressed Before Voting on Sale | 21 July 1989 | PNO-V-89-044:on 890720,util Board Voted by 4-1 Vote to Enter Exclusive Negotiations W/Quadrex Corp for Possible Sale of Plant.Key Milestone Dates Listed.Board Maintained That Several Key Issues Must Be Addressed Before Voting on Sale | |
IR 05000312/1989008 | 11 July 1989 | Insp Rept 50-312/89-08 on 890422-0602.No Violations or Deviations Noted.Two non-cited Violations Discussed.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations & ESF Sys Walkdown | Moisture barrier |
IR 05000312/1989011 | 6 July 1989 | Insp Rept 50-312/89-11 on 890629-30.No Violations Noted. Major Areas Inspected:Licensee Radiochemical Analyses to Verify Accuracy of Measurements of Radionuclides in Release Tank Water & Sediment from Effluent Discharge Point | |
PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred | 5 July 1989 | PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred | Earthquake |
PNO-V-89-039, on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul | 3 July 1989 | PNO-V-89-039:on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul |