PNO-I-87-105B, on 871112,offsite Power Reestablished to Vital & Nonvital Buses Via Backfeeding Through Main & Auxiliary Transformers After Loss of Power.Loss of Power Possibly Caused by Icing in Switchyard.Switchyard Sprayed

From kanterella
Jump to navigation Jump to search
PNO-I-87-105B:on 871112,offsite Power Reestablished to Vital & Nonvital Buses Via Backfeeding Through Main & Auxiliary Transformers After Loss of Power.Loss of Power Possibly Caused by Icing in Switchyard.Switchyard Sprayed
ML20236P723
Person / Time
Site: Pilgrim
Issue date: 11/13/1987
From: Abraham K, Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNO-I-87-105B, NUDOCS 8711180132
Download: ML20236P723 (2)


___ _ _ _ _ _ _ _ __

DCS No: 50293871113 Date: 11/13/87 .

-PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL' OCCURRENCE--PNO-I-87-1058.

This preliminary notification constitutes EARLY notice of events of.POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region I staff on this date.

Facility: Boston Edison Company Licensee Emergency Classification:

Pilgrim Nuclear Power Sta. Notification of Unusual Event Plymouth, MA _ _ Alert DN 50-293 Site Area Emergency General Emergency X Not Applicable

Subject:

LOSS OF 0FFSITE POWER (UPDATE)

At around 11:15 p.m., 11/12/87, offsite power was reestablished to vital and non-vital

' buses via back-feeding through the main and auxiliary transformers. As of 7:00 a.m., -

11/13/87, the A Emergency Diesel Generator (EDG) is still running supplying power to its associated vital bus and the B EDG is being prepared for testing. Thus far, the licensee has identified no equipment damage associated with the loss of power. The loss of power on 11/12/87 is still believed to be associated with icing in the switchyard.

The weather conditions have stabilized. The licensee has completed spray down of the switchyard and insulators and has completed troubleshooting of the startup transformer with no problems identified.

During the event, moderator temperature trended down from approxin.ately 183 F to 170 F.

Control room temperature reached approximately 90 F.

Two resident inspectors and a Region I Section Chief remained onsite monitoring licensee actions until offsite power was reestablished and offsite power reliability was verified. Two additional resident inspectors and a Section Chief are in the area and available to the site.

' A temporary air compressor has been moved onsite and is available to tie into the plant air system t'o provide a backup to the installed essential and nonessential plant systems if required.

The Commonwealth of Massachusetts has been updated on the plant status as of 12:25 a.m., 11/13/87.

There has been significant media interest in the event. Region I partially manned the incident response center throughout the event until 4:00 a.m on 11/13/87.

CONTACT: J. Wiggins K. Abraham (PAO) 488-1224 488-1330 O',

8711180132 871113 PDR ILE g[

PNO-I-87-10bB PDR

~

m , ,

i

' DISTRIBUTION' N :-

lHfst. *-

MNBB- Phillips E/W Willste Mail: ADM:DMB L- Chairman Zech EDO NRR NMSS DOT:Trans only Comm. Roberts PA . DIA RES OGC- AE00 NRC Ops Crt k..Comm.Bernthal-Comm'. Carr

! .Comm. Rogers

^ACRS Air Rights INP0----

'SECY .SP NSAC----

CA PDR. Regional Offices TMI Resident Section RI Resident Office Licensee:

(R actor Licensees)

. Region I Form 83 (Rev. August 1987) l l