Issue date | Title | Topic | |
---|---|---|---|
PNO-I-99-026A, on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation | 1 June 1999 | PNO-I-99-026A:on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation | |
PNO-I-99-026, on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release | 19 May 1999 | PNO-I-99-026:on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release | |
PNO-I-97-072, on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test | 24 November 1997 | PNO-I-97-072:on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test | Stroke time |
PNO-I-97-061, on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued | 23 September 1997 | PNO-I-97-061:on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued | |
PNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR | 22 August 1997 | PNO-I-97-053:on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR | |
PNO-I-97-019, on 970401,declared Unusual Event at Pilgrim Nuclear Power Station,Due to Inability to Provide Offsite Electrical Power to Safety Related Electrical Busses.Loss of Offsite Electrical Power Resulted from Faults on Lines | 2 April 1997 | PNO-I-97-019:on 970401,declared Unusual Event at Pilgrim Nuclear Power Station,Due to Inability to Provide Offsite Electrical Power to Safety Related Electrical Busses.Loss of Offsite Electrical Power Resulted from Faults on Lines | High winds |
PNO-I-93-066, on 931207,licensee Security Representative in Technical Support Ctr Notified NRC Region I That Actual Demonstration Taking Place in Downtown Plymonth.No Other Interference W/Exercise Activities Identified | 7 December 1993 | PNO-I-93-066:on 931207,licensee Security Representative in Technical Support Ctr Notified NRC Region I That Actual Demonstration Taking Place in Downtown Plymonth.No Other Interference W/Exercise Activities Identified | |
PNO-I-93-066A, demonstration to Protest Inadequacy of Plant Emergency Plan Ended About 2:00 Pm.Three Stink Bombs Introduced Into Media Center Ventilation Sys,But Did Not Interrupt Activities.No Other Untoward Occurrences Reported | 7 December 1993 | PNO-I-93-066A:demonstration to Protest Inadequacy of Plant Emergency Plan Ended About 2:00 Pm.Three Stink Bombs Introduced Into Media Center Ventilation Sys,But Did Not Interrupt Activities.No Other Untoward Occurrences Reported | |
PNO-I-93-052, on 930910,lightning Strike in Switchyard Resulted in Loss of Both 345 Kv Supply Lines to Site.Reactor Tripped as Expected.All Sys Responded as Designed,Offsite Power Reestablished within 11 Minutes | 10 September 1993 | PNO-I-93-052:on 930910,lightning Strike in Switchyard Resulted in Loss of Both 345 Kv Supply Lines to Site.Reactor Tripped as Expected.All Sys Responded as Designed,Offsite Power Reestablished within 11 Minutes | |
PNO-I-91-046, on 910626,irradiated Fuel Bundle Became Degrappled from Refuel Bridge Handling Device.Caused by Grapple Mechanism Failure to Unlatch Fuel Bundle.All Fuel Movement Operations Secured | 26 June 1991 | PNO-I-91-046:on 910626,irradiated Fuel Bundle Became Degrappled from Refuel Bridge Handling Device.Caused by Grapple Mechanism Failure to Unlatch Fuel Bundle.All Fuel Movement Operations Secured | |
PNO-I-90-095, on 901031,radioactive Matl Transported Offsite as Nonradioactive Matl | 1 November 1990 | PNO-I-90-095:on 901031,radioactive Matl Transported Offsite as Nonradioactive Matl | |
PNO-I-90-076, on 900902,licensee Initiated Manual Reactor Scram to Preclude Anticipated Automatic Scram Due to Increasing Reactor Vessel Water Level.Licensee Established Multidisciplinary Analysis Team to Evaluate Reactor Scram | 5 September 1990 | PNO-I-90-076:on 900902,licensee Initiated Manual Reactor Scram to Preclude Anticipated Automatic Scram Due to Increasing Reactor Vessel Water Level.Licensee Established Multidisciplinary Analysis Team to Evaluate Reactor Scram | Reactor Vessel Water Level |
PNO-I-90-053, on 900703,util Declared Unusual Event Following 900702 Tripping of Recirculation Pump Motor Generator Due to Generator Lockout.Reactor Power Reduced to Approx 30% & Reactor Scram Initiated.Commonwealth of Ma Notified | 3 July 1990 | PNO-I-90-053:on 900703,util Declared Unusual Event Following 900702 Tripping of Recirculation Pump Motor Generator Due to Generator Lockout.Reactor Power Reduced to Approx 30% & Reactor Scram Initiated.Commonwealth of Ma Notified | |
ML20247C971 | 18 July 1989 | PNO-89-059:on 890718,reactor Manually Tripped from 50% Power After Loss of Air Ejectors Caused Decreased Condenser Vacuum Condition.Cause of Failure Not Immediately Evident,However Air Ejectors Shifted Due to Slightly Degraded Vacuum | |
PNO-I-89-049, on 890626,WT Russell Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Third NRC Approval Point in Licensee Power Ascension Test Program.Testing Activities Scheduled for Next Phase | 26 June 1989 | PNO-I-89-049:on 890626,WT Russell Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Third NRC Approval Point in Licensee Power Ascension Test Program.Testing Activities Scheduled for Next Phase | |
ML20245D007 | 19 June 1989 | PNS-I-89-009:on 890619,unidentified Male Scaled Outer Fence Around Plant & Chained to Outside of Protected Area Fence. Individual Arrested.Individual Claimed to Be Part of Massachusetts Public Interest Research Group | |
PNO-I-89-027, on 890412,RCIC Injection Valves Unexpectedly Opened During Testing of Sys Logic.Discharge Check Valve Failure Also Allowed Feedwater Backleakage,Contaminating Five Workers Slightly.Augmented Insp Team Dispatched | 13 April 1989 | PNO-I-89-027:on 890412,RCIC Injection Valves Unexpectedly Opened During Testing of Sys Logic.Discharge Check Valve Failure Also Allowed Feedwater Backleakage,Contaminating Five Workers Slightly.Augmented Insp Team Dispatched | |
ML20248H931 | 6 April 1989 | PNS-I-89-002:on 890405,telephone Call Received by Licensee, Indicating That Bomb Was on Site.Security Force Responded by Implementing Bomb Threat Contingency Procedure.Nothing Suspicious Found.Threat Considered to Be Hoax | |
PNO-I-89-016, on 890303,JM Allan Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Second Approval Point in Power Ascension Test Program. Testing Activities for Next Phase Stated | 3 March 1989 | PNO-I-89-016:on 890303,JM Allan Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Second Approval Point in Power Ascension Test Program. Testing Activities for Next Phase Stated | |
PNO-I-89-010, on 890221,startup Transformer Tripped & Locked Out on Ground Differential Relay Actuation.Licensee Investigating Cause.Decay Heat Minimal & Reactor Water Temp Decreased About 1 F in First 3 H After Loss of Power | 21 February 1989 | PNO-I-89-010:on 890221,startup Transformer Tripped & Locked Out on Ground Differential Relay Actuation.Licensee Investigating Cause.Decay Heat Minimal & Reactor Water Temp Decreased About 1 F in First 3 H After Loss of Power | |
PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process | 9 November 1988 | PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process | |
PNO-I-88-058, on 880527,util Mgt Halted Performance of General Maint at Facility.Licensee self-assessment Completed on 880526 Identified Maint Program Weaknesses.Addl Maint Tasks Being Reviewed on case-by-case Basis | 27 May 1988 | PNO-I-88-058:on 880527,util Mgt Halted Performance of General Maint at Facility.Licensee self-assessment Completed on 880526 Identified Maint Program Weaknesses.Addl Maint Tasks Being Reviewed on case-by-case Basis | |
PNO-I-88-019, on 880211,fire in Contaminated Area of Machine Shop Discovered.Fire Identified as Burning Insulation from heat-treating Machine Being Used on Valve Disc in Shop.Fire Extinguished.No Spread of Contamination from Area Occurred | 12 February 1988 | PNO-I-88-019:on 880211,fire in Contaminated Area of Machine Shop Discovered.Fire Identified as Burning Insulation from heat-treating Machine Being Used on Valve Disc in Shop.Fire Extinguished.No Spread of Contamination from Area Occurred | |
PNO-I-87-105B, on 871112,offsite Power Reestablished to Vital & Nonvital Buses Via Backfeeding Through Main & Auxiliary Transformers After Loss of Power.Loss of Power Possibly Caused by Icing in Switchyard.Switchyard Sprayed | 13 November 1987 | PNO-I-87-105B:on 871112,offsite Power Reestablished to Vital & Nonvital Buses Via Backfeeding Through Main & Auxiliary Transformers After Loss of Power.Loss of Power Possibly Caused by Icing in Switchyard.Switchyard Sprayed | |
PNO-I-87-106, NRC Dispatched Augmented Insp Team to Facility to Commence Insp on 871115.Insp Will Focus on Sequence of Events & Licensees Response Re 871112 Loss of Offsite Power. Team Expected Onsite 871115-20 | 13 November 1987 | PNO-I-87-106:NRC Dispatched Augmented Insp Team to Facility to Commence Insp on 871115.Insp Will Focus on Sequence of Events & Licensees Response Re 871112 Loss of Offsite Power. Team Expected Onsite 871115-20 | |
PNO-I-87-105A, as of 871112,offsite Power Remained Unavailable to Site.Personnel Shutdown Emergency Diesel Generator B Due to Problem W/Transformer C,Resulting in Another Shutdown Cooling Isolation.Switchyards Sprayed | 12 November 1987 | PNO-I-87-105A:as of 871112,offsite Power Remained Unavailable to Site.Personnel Shutdown Emergency Diesel Generator B Due to Problem W/Transformer C,Resulting in Another Shutdown Cooling Isolation.Switchyards Sprayed | |
PNO-I-87-105, on 871112,plant Experienced Complete Loss of Offsite Power.Cause Associated W/Switchyard Icing Due to Adverse Weather Conditions.Licensee Continuing to Determine Cause of Loss of Offsite Power.Ice & Salt Being Removed | 12 November 1987 | PNO-I-87-105:on 871112,plant Experienced Complete Loss of Offsite Power.Cause Associated W/Switchyard Icing Due to Adverse Weather Conditions.Licensee Continuing to Determine Cause of Loss of Offsite Power.Ice & Salt Being Removed | |
PNO-I-87-104A, on 871108,normally Locked High Radiation Barrier Leading to Refueling Floor Was Found W/Locking Mechanism Taped Over.Info Serves as Update to PNO-I-87-104, Discussing Licensee Decision to Stop Work at Plant | 10 November 1987 | PNO-I-87-104A:on 871108,normally Locked High Radiation Barrier Leading to Refueling Floor Was Found W/Locking Mechanism Taped Over.Info Serves as Update to PNO-I-87-104, Discussing Licensee Decision to Stop Work at Plant | |
PNO-I-87-104, on 871107 & 08,util Identified Potential Breach of Security Vital Area Barrier & Series of Radiological Problems.Ongoing Maint & Mod Work Onsite Suspended.Licensee Presently Evaluating Situation | 9 November 1987 | PNO-I-87-104:on 871107 & 08,util Identified Potential Breach of Security Vital Area Barrier & Series of Radiological Problems.Ongoing Maint & Mod Work Onsite Suspended.Licensee Presently Evaluating Situation | Hydrostatic Locked High Radiation Area |
PNO-I-87-095, on 871015,State of Ma Atty General Jm Shannon Filed Petition Requesting Order to Show Cause Why Plant Should Not Remain Closed Until Full Adjudicatory Hearing Resolves Issues Re GE Mark I Containment & Evacuation Plans | 16 October 1987 | PNO-I-87-095:on 871015,State of Ma Atty General Jm Shannon Filed Petition Requesting Order to Show Cause Why Plant Should Not Remain Closed Until Full Adjudicatory Hearing Resolves Issues Re GE Mark I Containment & Evacuation Plans | |
PNO-I-87-090, on 870926-27,util Scheduled to Start Reloading Fuel Into Core of Plant.Plant Shutdown Since Apr 1986 for Maint & Program Improvements.Licensee Required to Obtain NRC Approval Before Restart of Reactor | 25 September 1987 | PNO-I-87-090:on 870926-27,util Scheduled to Start Reloading Fuel Into Core of Plant.Plant Shutdown Since Apr 1986 for Maint & Program Improvements.Licensee Required to Obtain NRC Approval Before Restart of Reactor | |
ML20238D859 | 8 September 1987 | PNS-I-87-015:on 870905,four Males Found in Owner Controlled Area Adjacent to Protected Area Barrier.Individuals Arrested & Charged W/Trespassing.No Indication Found That Protected Area Perimeter Barrier Breached by Individuals | Contraband |
PNO-I-87-069, corrects & Updates Info Contained in 870728 PNO-I-87-068 Re 870727 Apparent Contamination of Worker W/ Radium.Licensee Subsequently Determined That Worker Contaminated w/Pm-147.Clean-up Will Be Performed by Worker | 30 July 1987 | PNO-I-87-069:corrects & Updates Info Contained in 870728 PNO-I-87-068 Re 870727 Apparent Contamination of Worker W/ Radium.Licensee Subsequently Determined That Worker Contaminated w/Pm-147.Clean-up Will Be Performed by Worker | |
PNO-I-87-068, on 870727,contractor Worker Found to Be Radioactively Contaminated W/Radium.Caused by Worker Attempt to Remove Radium from Watch Dial.Licensee Decontaminated Worker & Furnished Other Health Physics Assistance | 28 July 1987 | PNO-I-87-068:on 870727,contractor Worker Found to Be Radioactively Contaminated W/Radium.Caused by Worker Attempt to Remove Radium from Watch Dial.Licensee Decontaminated Worker & Furnished Other Health Physics Assistance | |
PNO-I-87-003, on 861224,health Physics Technician Found Dead at Residence.On 870127,cause Determined to Be drug-related. Facility Drug Surveillance Increased & Fitness for Duty Policy Revised | 21 January 1987 | PNO-I-87-003:on 861224,health Physics Technician Found Dead at Residence.On 870127,cause Determined to Be drug-related. Facility Drug Surveillance Increased & Fitness for Duty Policy Revised | Fitness for Duty |
PNO-I-86-092, on 861119 All Offsite Power Lost.Caused by Heavy Storm & High Winds in Site Vicinity.Onsite Available Diesel Fuel Supplies Sufficient to Operate Diesels in Excess of 100 H | 19 November 1986 | PNO-I-86-092:on 861119 All Offsite Power Lost.Caused by Heavy Storm & High Winds in Site Vicinity.Onsite Available Diesel Fuel Supplies Sufficient to Operate Diesels in Excess of 100 H | High winds |
ML20214F520 | 19 November 1986 | Updated PNO-I-86-092A:on 861119,offsite Power Supplies Restored.Cause Not Determined.Monthly Full Load Surveillance of Diesel Generators Performed to Remove Carbon Deposits. Investigation Continuing | |
ML20212N991 | 27 August 1986 | PNS-I-86-014:on 860826,bomb Threat Received at Util.Bomb Search Procedures & Enhanced Security Measures Immediately Implemented.Search Yielded Negative Reults.Fbi & Commonwealth of Ma Notified | |
ML20212N558 | 25 August 1986 | PNS-I-86-013:on 860824,Boston Globe Newspaper Received Bomb Threat Re Plants.Police Notified & Bomb Search Procedures Instituted W/Negative Results | |
PNO-I-86-057, projected Startup Date Extended to Early 1987 for Performance of Three Addl Tasks Re Fire Protection Mods, Installation of Primary Containment Structure Enhancements & Reactor Refueling.Plant Shut Down Since 860412 | 25 July 1986 | PNO-I-86-057:projected Startup Date Extended to Early 1987 for Performance of Three Addl Tasks Re Fire Protection Mods, Installation of Primary Containment Structure Enhancements & Reactor Refueling.Plant Shut Down Since 860412 | |
ML20199L884 | 2 July 1986 | PNS-I-86-010A:on 860701,strike by Contract Security Force Ended.Other Licensee Employees Honoring Picket Line Expected to Return to Work on Next Regular Shift.Licensee Will Continue 24 H Coverage of Security Program W/Mgt | |
ML20206R693 | 1 July 1986 | PNS-I-86-010:on 860630,United Plant Guard Workers Union of America Local 540,representing Contract Security Force,Voted to Strike.Contingency Security Force Called in & Regular Security Force Members Escorted Off Site | |
PNO-I-86-038A, on 860515,operations,maint & Clerical Workers Went on Strike When Contract Expired.Mgt Personnel W/Senior Reactor Licenses Manning Control Room Watches on 12-h Shifts.Work Activities Canceled for Several Days | 16 May 1986 | PNO-I-86-038A:on 860515,operations,maint & Clerical Workers Went on Strike When Contract Expired.Mgt Personnel W/Senior Reactor Licenses Manning Control Room Watches on 12-h Shifts.Work Activities Canceled for Several Days | |
PNO-I-86-038, on 860515,current Contract W/Local Unions Will Expire & Strike of Operators,Maint Personnel & Clerical Staff May Occur.Unions Recommend Rejection of Util Proposal. Plant Shut Down Since 860412 Containment Isolation Occurred | 15 May 1986 | PNO-I-86-038:on 860515,current Contract W/Local Unions Will Expire & Strike of Operators,Maint Personnel & Clerical Staff May Occur.Unions Recommend Rejection of Util Proposal. Plant Shut Down Since 860412 Containment Isolation Occurred | |
PNO-I-86-037, on 860501,approx 80 Laborers Staged Wildcat Walkout in Response to Disciplinary Action Against Worker. Striking Laborers Fired.Rock Throwing Reported.Plant Currently Shut Down for Maint Outage | 6 May 1986 | PNO-I-86-037:on 860501,approx 80 Laborers Staged Wildcat Walkout in Response to Disciplinary Action Against Worker. Striking Laborers Fired.Rock Throwing Reported.Plant Currently Shut Down for Maint Outage | |
PNO-I-86-028, on 860411,controlled Shutdown Initiated to Investigate Three Leaking Valves in LPCI Portion of RHR Sys. During Shutdown,Reactor Scrammed at Low Power When MSIVs Closed.Caused by Faulty Reactor Mode Switch | 14 April 1986 | PNO-I-86-028:on 860411,controlled Shutdown Initiated to Investigate Three Leaking Valves in LPCI Portion of RHR Sys. During Shutdown,Reactor Scrammed at Low Power When MSIVs Closed.Caused by Faulty Reactor Mode Switch | |
PNO-I-86-026, on 860404,reactor Scrammed During Shutdown for Repair of Leaking RHR Valve.Caused by Unexpected Closing of MSIV Valves Due to Reactor Mode Switch Problem.Cooldown Effected by Releasing Steam Into HPCI Sys | 7 April 1986 | PNO-I-86-026:on 860404,reactor Scrammed During Shutdown for Repair of Leaking RHR Valve.Caused by Unexpected Closing of MSIV Valves Due to Reactor Mode Switch Problem.Cooldown Effected by Releasing Steam Into HPCI Sys | |
ML20137Z160 | 3 October 1985 | PNS-I-85-013A:on 850928,insp Team Conducted Review on Licensee Investigative/Followup Actions & Independent Evaluation to Determine Probable Cause of Damaged Spent Fuel Handling Equipment.No Evidence of Attempted Sabotage | |
PNO-I-85-071A, on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage | 27 September 1985 | PNO-I-85-071A:on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage | High winds |
ML20133A820 | 27 September 1985 | PNS-I-85-013:on 850927,bent Mast on Refueling Bridge Over Spent Fuel Pool Discovered.Cause Unknown.No Fuel Damage Apparent.Licensee Conducting Tests & Insp to Assure Operability |