PNO-I-99-026A, on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation1 June 1999PNO-I-99-026A:on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation
PNO-I-99-026, on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release19 May 1999PNO-I-99-026:on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release
PNO-I-97-072, on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test24 November 1997PNO-I-97-072:on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance TestStroke time
PNO-I-97-061, on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued23 September 1997PNO-I-97-061:on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued
PNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR22 August 1997PNO-I-97-053:on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR
PNO-I-97-019, on 970401,declared Unusual Event at Pilgrim Nuclear Power Station,Due to Inability to Provide Offsite Electrical Power to Safety Related Electrical Busses.Loss of Offsite Electrical Power Resulted from Faults on Lines2 April 1997PNO-I-97-019:on 970401,declared Unusual Event at Pilgrim Nuclear Power Station,Due to Inability to Provide Offsite Electrical Power to Safety Related Electrical Busses.Loss of Offsite Electrical Power Resulted from Faults on LinesHigh winds
PNO-I-93-066, on 931207,licensee Security Representative in Technical Support Ctr Notified NRC Region I That Actual Demonstration Taking Place in Downtown Plymonth.No Other Interference W/Exercise Activities Identified7 December 1993PNO-I-93-066:on 931207,licensee Security Representative in Technical Support Ctr Notified NRC Region I That Actual Demonstration Taking Place in Downtown Plymonth.No Other Interference W/Exercise Activities Identified
PNO-I-93-066A, demonstration to Protest Inadequacy of Plant Emergency Plan Ended About 2:00 Pm.Three Stink Bombs Introduced Into Media Center Ventilation Sys,But Did Not Interrupt Activities.No Other Untoward Occurrences Reported7 December 1993PNO-I-93-066A:demonstration to Protest Inadequacy of Plant Emergency Plan Ended About 2:00 Pm.Three Stink Bombs Introduced Into Media Center Ventilation Sys,But Did Not Interrupt Activities.No Other Untoward Occurrences Reported
PNO-I-93-052, on 930910,lightning Strike in Switchyard Resulted in Loss of Both 345 Kv Supply Lines to Site.Reactor Tripped as Expected.All Sys Responded as Designed,Offsite Power Reestablished within 11 Minutes10 September 1993PNO-I-93-052:on 930910,lightning Strike in Switchyard Resulted in Loss of Both 345 Kv Supply Lines to Site.Reactor Tripped as Expected.All Sys Responded as Designed,Offsite Power Reestablished within 11 Minutes
PNO-I-91-046, on 910626,irradiated Fuel Bundle Became Degrappled from Refuel Bridge Handling Device.Caused by Grapple Mechanism Failure to Unlatch Fuel Bundle.All Fuel Movement Operations Secured26 June 1991PNO-I-91-046:on 910626,irradiated Fuel Bundle Became Degrappled from Refuel Bridge Handling Device.Caused by Grapple Mechanism Failure to Unlatch Fuel Bundle.All Fuel Movement Operations Secured
PNO-I-90-095, on 901031,radioactive Matl Transported Offsite as Nonradioactive Matl1 November 1990PNO-I-90-095:on 901031,radioactive Matl Transported Offsite as Nonradioactive Matl
PNO-I-90-076, on 900902,licensee Initiated Manual Reactor Scram to Preclude Anticipated Automatic Scram Due to Increasing Reactor Vessel Water Level.Licensee Established Multidisciplinary Analysis Team to Evaluate Reactor Scram5 September 1990PNO-I-90-076:on 900902,licensee Initiated Manual Reactor Scram to Preclude Anticipated Automatic Scram Due to Increasing Reactor Vessel Water Level.Licensee Established Multidisciplinary Analysis Team to Evaluate Reactor ScramReactor Vessel Water Level
PNO-I-90-053, on 900703,util Declared Unusual Event Following 900702 Tripping of Recirculation Pump Motor Generator Due to Generator Lockout.Reactor Power Reduced to Approx 30% & Reactor Scram Initiated.Commonwealth of Ma Notified3 July 1990PNO-I-90-053:on 900703,util Declared Unusual Event Following 900702 Tripping of Recirculation Pump Motor Generator Due to Generator Lockout.Reactor Power Reduced to Approx 30% & Reactor Scram Initiated.Commonwealth of Ma Notified
ML20247C97118 July 1989PNO-89-059:on 890718,reactor Manually Tripped from 50% Power After Loss of Air Ejectors Caused Decreased Condenser Vacuum Condition.Cause of Failure Not Immediately Evident,However Air Ejectors Shifted Due to Slightly Degraded Vacuum
PNO-I-89-049, on 890626,WT Russell Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Third NRC Approval Point in Licensee Power Ascension Test Program.Testing Activities Scheduled for Next Phase26 June 1989PNO-I-89-049:on 890626,WT Russell Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Third NRC Approval Point in Licensee Power Ascension Test Program.Testing Activities Scheduled for Next Phase
ML20245D00719 June 1989PNS-I-89-009:on 890619,unidentified Male Scaled Outer Fence Around Plant & Chained to Outside of Protected Area Fence. Individual Arrested.Individual Claimed to Be Part of Massachusetts Public Interest Research Group
PNO-I-89-027, on 890412,RCIC Injection Valves Unexpectedly Opened During Testing of Sys Logic.Discharge Check Valve Failure Also Allowed Feedwater Backleakage,Contaminating Five Workers Slightly.Augmented Insp Team Dispatched13 April 1989PNO-I-89-027:on 890412,RCIC Injection Valves Unexpectedly Opened During Testing of Sys Logic.Discharge Check Valve Failure Also Allowed Feedwater Backleakage,Contaminating Five Workers Slightly.Augmented Insp Team Dispatched
ML20248H9316 April 1989PNS-I-89-002:on 890405,telephone Call Received by Licensee, Indicating That Bomb Was on Site.Security Force Responded by Implementing Bomb Threat Contingency Procedure.Nothing Suspicious Found.Threat Considered to Be Hoax
PNO-I-89-016, on 890303,JM Allan Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Second Approval Point in Power Ascension Test Program. Testing Activities for Next Phase Stated3 March 1989PNO-I-89-016:on 890303,JM Allan Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Second Approval Point in Power Ascension Test Program. Testing Activities for Next Phase Stated
PNO-I-89-010, on 890221,startup Transformer Tripped & Locked Out on Ground Differential Relay Actuation.Licensee Investigating Cause.Decay Heat Minimal & Reactor Water Temp Decreased About 1 F in First 3 H After Loss of Power21 February 1989PNO-I-89-010:on 890221,startup Transformer Tripped & Locked Out on Ground Differential Relay Actuation.Licensee Investigating Cause.Decay Heat Minimal & Reactor Water Temp Decreased About 1 F in First 3 H After Loss of Power
PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process9 November 1988PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process
PNO-I-88-058, on 880527,util Mgt Halted Performance of General Maint at Facility.Licensee self-assessment Completed on 880526 Identified Maint Program Weaknesses.Addl Maint Tasks Being Reviewed on case-by-case Basis27 May 1988PNO-I-88-058:on 880527,util Mgt Halted Performance of General Maint at Facility.Licensee self-assessment Completed on 880526 Identified Maint Program Weaknesses.Addl Maint Tasks Being Reviewed on case-by-case Basis
PNO-I-88-019, on 880211,fire in Contaminated Area of Machine Shop Discovered.Fire Identified as Burning Insulation from heat-treating Machine Being Used on Valve Disc in Shop.Fire Extinguished.No Spread of Contamination from Area Occurred12 February 1988PNO-I-88-019:on 880211,fire in Contaminated Area of Machine Shop Discovered.Fire Identified as Burning Insulation from heat-treating Machine Being Used on Valve Disc in Shop.Fire Extinguished.No Spread of Contamination from Area Occurred
PNO-I-87-105B, on 871112,offsite Power Reestablished to Vital & Nonvital Buses Via Backfeeding Through Main & Auxiliary Transformers After Loss of Power.Loss of Power Possibly Caused by Icing in Switchyard.Switchyard Sprayed13 November 1987PNO-I-87-105B:on 871112,offsite Power Reestablished to Vital & Nonvital Buses Via Backfeeding Through Main & Auxiliary Transformers After Loss of Power.Loss of Power Possibly Caused by Icing in Switchyard.Switchyard Sprayed
PNO-I-87-106, NRC Dispatched Augmented Insp Team to Facility to Commence Insp on 871115.Insp Will Focus on Sequence of Events & Licensees Response Re 871112 Loss of Offsite Power. Team Expected Onsite 871115-2013 November 1987PNO-I-87-106:NRC Dispatched Augmented Insp Team to Facility to Commence Insp on 871115.Insp Will Focus on Sequence of Events & Licensees Response Re 871112 Loss of Offsite Power. Team Expected Onsite 871115-20
PNO-I-87-105A, as of 871112,offsite Power Remained Unavailable to Site.Personnel Shutdown Emergency Diesel Generator B Due to Problem W/Transformer C,Resulting in Another Shutdown Cooling Isolation.Switchyards Sprayed12 November 1987PNO-I-87-105A:as of 871112,offsite Power Remained Unavailable to Site.Personnel Shutdown Emergency Diesel Generator B Due to Problem W/Transformer C,Resulting in Another Shutdown Cooling Isolation.Switchyards Sprayed
PNO-I-87-105, on 871112,plant Experienced Complete Loss of Offsite Power.Cause Associated W/Switchyard Icing Due to Adverse Weather Conditions.Licensee Continuing to Determine Cause of Loss of Offsite Power.Ice & Salt Being Removed12 November 1987PNO-I-87-105:on 871112,plant Experienced Complete Loss of Offsite Power.Cause Associated W/Switchyard Icing Due to Adverse Weather Conditions.Licensee Continuing to Determine Cause of Loss of Offsite Power.Ice & Salt Being Removed
PNO-I-87-104A, on 871108,normally Locked High Radiation Barrier Leading to Refueling Floor Was Found W/Locking Mechanism Taped Over.Info Serves as Update to PNO-I-87-104, Discussing Licensee Decision to Stop Work at Plant10 November 1987PNO-I-87-104A:on 871108,normally Locked High Radiation Barrier Leading to Refueling Floor Was Found W/Locking Mechanism Taped Over.Info Serves as Update to PNO-I-87-104, Discussing Licensee Decision to Stop Work at Plant
PNO-I-87-104, on 871107 & 08,util Identified Potential Breach of Security Vital Area Barrier & Series of Radiological Problems.Ongoing Maint & Mod Work Onsite Suspended.Licensee Presently Evaluating Situation9 November 1987PNO-I-87-104:on 871107 & 08,util Identified Potential Breach of Security Vital Area Barrier & Series of Radiological Problems.Ongoing Maint & Mod Work Onsite Suspended.Licensee Presently Evaluating SituationHydrostatic
Locked High Radiation Area
PNO-I-87-095, on 871015,State of Ma Atty General Jm Shannon Filed Petition Requesting Order to Show Cause Why Plant Should Not Remain Closed Until Full Adjudicatory Hearing Resolves Issues Re GE Mark I Containment & Evacuation Plans16 October 1987PNO-I-87-095:on 871015,State of Ma Atty General Jm Shannon Filed Petition Requesting Order to Show Cause Why Plant Should Not Remain Closed Until Full Adjudicatory Hearing Resolves Issues Re GE Mark I Containment & Evacuation Plans
PNO-I-87-090, on 870926-27,util Scheduled to Start Reloading Fuel Into Core of Plant.Plant Shutdown Since Apr 1986 for Maint & Program Improvements.Licensee Required to Obtain NRC Approval Before Restart of Reactor25 September 1987PNO-I-87-090:on 870926-27,util Scheduled to Start Reloading Fuel Into Core of Plant.Plant Shutdown Since Apr 1986 for Maint & Program Improvements.Licensee Required to Obtain NRC Approval Before Restart of Reactor
ML20238D8598 September 1987PNS-I-87-015:on 870905,four Males Found in Owner Controlled Area Adjacent to Protected Area Barrier.Individuals Arrested & Charged W/Trespassing.No Indication Found That Protected Area Perimeter Barrier Breached by IndividualsContraband
PNO-I-87-069, corrects & Updates Info Contained in 870728 PNO-I-87-068 Re 870727 Apparent Contamination of Worker W/ Radium.Licensee Subsequently Determined That Worker Contaminated w/Pm-147.Clean-up Will Be Performed by Worker30 July 1987PNO-I-87-069:corrects & Updates Info Contained in 870728 PNO-I-87-068 Re 870727 Apparent Contamination of Worker W/ Radium.Licensee Subsequently Determined That Worker Contaminated w/Pm-147.Clean-up Will Be Performed by Worker
PNO-I-87-068, on 870727,contractor Worker Found to Be Radioactively Contaminated W/Radium.Caused by Worker Attempt to Remove Radium from Watch Dial.Licensee Decontaminated Worker & Furnished Other Health Physics Assistance28 July 1987PNO-I-87-068:on 870727,contractor Worker Found to Be Radioactively Contaminated W/Radium.Caused by Worker Attempt to Remove Radium from Watch Dial.Licensee Decontaminated Worker & Furnished Other Health Physics Assistance
PNO-I-87-003, on 861224,health Physics Technician Found Dead at Residence.On 870127,cause Determined to Be drug-related. Facility Drug Surveillance Increased & Fitness for Duty Policy Revised21 January 1987PNO-I-87-003:on 861224,health Physics Technician Found Dead at Residence.On 870127,cause Determined to Be drug-related. Facility Drug Surveillance Increased & Fitness for Duty Policy RevisedFitness for Duty
PNO-I-86-092, on 861119 All Offsite Power Lost.Caused by Heavy Storm & High Winds in Site Vicinity.Onsite Available Diesel Fuel Supplies Sufficient to Operate Diesels in Excess of 100 H19 November 1986PNO-I-86-092:on 861119 All Offsite Power Lost.Caused by Heavy Storm & High Winds in Site Vicinity.Onsite Available Diesel Fuel Supplies Sufficient to Operate Diesels in Excess of 100 HHigh winds
ML20214F52019 November 1986Updated PNO-I-86-092A:on 861119,offsite Power Supplies Restored.Cause Not Determined.Monthly Full Load Surveillance of Diesel Generators Performed to Remove Carbon Deposits. Investigation Continuing
ML20212N99127 August 1986PNS-I-86-014:on 860826,bomb Threat Received at Util.Bomb Search Procedures & Enhanced Security Measures Immediately Implemented.Search Yielded Negative Reults.Fbi & Commonwealth of Ma Notified
ML20212N55825 August 1986PNS-I-86-013:on 860824,Boston Globe Newspaper Received Bomb Threat Re Plants.Police Notified & Bomb Search Procedures Instituted W/Negative Results
PNO-I-86-057, projected Startup Date Extended to Early 1987 for Performance of Three Addl Tasks Re Fire Protection Mods, Installation of Primary Containment Structure Enhancements & Reactor Refueling.Plant Shut Down Since 86041225 July 1986PNO-I-86-057:projected Startup Date Extended to Early 1987 for Performance of Three Addl Tasks Re Fire Protection Mods, Installation of Primary Containment Structure Enhancements & Reactor Refueling.Plant Shut Down Since 860412
ML20199L8842 July 1986PNS-I-86-010A:on 860701,strike by Contract Security Force Ended.Other Licensee Employees Honoring Picket Line Expected to Return to Work on Next Regular Shift.Licensee Will Continue 24 H Coverage of Security Program W/Mgt
ML20206R6931 July 1986PNS-I-86-010:on 860630,United Plant Guard Workers Union of America Local 540,representing Contract Security Force,Voted to Strike.Contingency Security Force Called in & Regular Security Force Members Escorted Off Site
PNO-I-86-038A, on 860515,operations,maint & Clerical Workers Went on Strike When Contract Expired.Mgt Personnel W/Senior Reactor Licenses Manning Control Room Watches on 12-h Shifts.Work Activities Canceled for Several Days16 May 1986PNO-I-86-038A:on 860515,operations,maint & Clerical Workers Went on Strike When Contract Expired.Mgt Personnel W/Senior Reactor Licenses Manning Control Room Watches on 12-h Shifts.Work Activities Canceled for Several Days
PNO-I-86-038, on 860515,current Contract W/Local Unions Will Expire & Strike of Operators,Maint Personnel & Clerical Staff May Occur.Unions Recommend Rejection of Util Proposal. Plant Shut Down Since 860412 Containment Isolation Occurred15 May 1986PNO-I-86-038:on 860515,current Contract W/Local Unions Will Expire & Strike of Operators,Maint Personnel & Clerical Staff May Occur.Unions Recommend Rejection of Util Proposal. Plant Shut Down Since 860412 Containment Isolation Occurred
PNO-I-86-037, on 860501,approx 80 Laborers Staged Wildcat Walkout in Response to Disciplinary Action Against Worker. Striking Laborers Fired.Rock Throwing Reported.Plant Currently Shut Down for Maint Outage6 May 1986PNO-I-86-037:on 860501,approx 80 Laborers Staged Wildcat Walkout in Response to Disciplinary Action Against Worker. Striking Laborers Fired.Rock Throwing Reported.Plant Currently Shut Down for Maint Outage
PNO-I-86-028, on 860411,controlled Shutdown Initiated to Investigate Three Leaking Valves in LPCI Portion of RHR Sys. During Shutdown,Reactor Scrammed at Low Power When MSIVs Closed.Caused by Faulty Reactor Mode Switch14 April 1986PNO-I-86-028:on 860411,controlled Shutdown Initiated to Investigate Three Leaking Valves in LPCI Portion of RHR Sys. During Shutdown,Reactor Scrammed at Low Power When MSIVs Closed.Caused by Faulty Reactor Mode Switch
PNO-I-86-026, on 860404,reactor Scrammed During Shutdown for Repair of Leaking RHR Valve.Caused by Unexpected Closing of MSIV Valves Due to Reactor Mode Switch Problem.Cooldown Effected by Releasing Steam Into HPCI Sys7 April 1986PNO-I-86-026:on 860404,reactor Scrammed During Shutdown for Repair of Leaking RHR Valve.Caused by Unexpected Closing of MSIV Valves Due to Reactor Mode Switch Problem.Cooldown Effected by Releasing Steam Into HPCI Sys
ML20137Z1603 October 1985PNS-I-85-013A:on 850928,insp Team Conducted Review on Licensee Investigative/Followup Actions & Independent Evaluation to Determine Probable Cause of Damaged Spent Fuel Handling Equipment.No Evidence of Attempted Sabotage
PNO-I-85-071A, on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage27 September 1985PNO-I-85-071A:on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered DamageHigh winds
ML20133A82027 September 1985PNS-I-85-013:on 850927,bent Mast on Refueling Bridge Over Spent Fuel Pool Discovered.Cause Unknown.No Fuel Damage Apparent.Licensee Conducting Tests & Insp to Assure Operability