ML20206R693

From kanterella
Jump to navigation Jump to search
PNS-I-86-010:on 860630,United Plant Guard Workers Union of America Local 540,representing Contract Security Force,Voted to Strike.Contingency Security Force Called in & Regular Security Force Members Escorted Off Site
ML20206R693
Person / Time
Site: Pilgrim
Issue date: 07/01/1986
From: Keimig R, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNS-I-86-010, PNS-I-86-10, NUDOCS 8607070205
Download: ML20206R693 (1)


Text

_ . - - - ..

, DCS: 50-443/860701 Data: July 1, 1986 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNS-I-86-10 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without veri-fication or evaluation, and is basically all that is known by the Region I staff on this dato.

Facility: Boston Edison Company Licensee Emergency Classification:

Pilgrim Nuclear Power Station Notification of Unusual Event Plymouth, Massachusetts Alert (D/N 50-293) Site Area Emergency General Emergency X Not Applicable Subjtet: STRIKE BY CONTRACT SECURITY FORCE On Junn 30, 1986, at approximately 8:00 p.m., the licensee notified Region I that the Unitid Plant Guard Workers Union of America Local 540, representing the contract securi-ty force (Globe Security System), had voted to strike. The strike vote followed the union's failure to accept a new labor contract. The potential for a strike had been anticipated and a contingency force, consisting of licensee and Globe security supervisory personnel from other sites, was called in. The contingency force had previously been trained in accordance with the Pilgrim Security Training and Qualifica-tion Plan.

Tha regular security force members were escorted off site, and all vital areas were inspected. No problems were encountered. Orderly picket lines have been established at all three plant gates. Boston Edison is in the process of obtaining an injunction to limit pickets. Some Boston Edison union personnel, including reactor operators, are h::noring the picket lines. Boston Edison will use management personnel to fill in for missing union workers as was done during the recently concluded strike by licensee employees. Three resident inspectors are currently onsite. Another vote, at the request of the union, has been scheduled for 2:00 p.m., today.

This information is current as of 10:00 a.m., July 1, 1986.

Tha Commonwealth of Massachusetts has been informed.

CONTACT: G. C. Smith R. R. Keimig 488-1263 488-1255  ;

DISTRIBUTION:  !

H. St. MNBB Phillips E/W W111ste Mail: ADM:DMB Chainnon Zech EDO NRR IE NMSS DOT:Trans only PA OIA RES l Conan. Bernthal MPA AE0D Coasn. Roberts ELD Cosen. Asselstine ACRS Air Rights INP0M8.

SECY SP NSACJ1F-CA PDR Regional Offices __ TMI Resident Section 1:]4 I RI Resident Office s:po Licensee:

8607070205 860701

PDR I&E PNS-I-86-010 PDR gt\ 0lI