NRC 2004-0118, October 2004 Monthly Operating Report for Point Beach, Units 1 and 2

From kanterella
Jump to navigation Jump to search
October 2004 Monthly Operating Report for Point Beach, Units 1 and 2
ML043220357
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/08/2004
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2004-0118
Download: ML043220357 (7)


Text

NMC Point Beach Nuclear Plant Committed to Nuclear Exceler_ Operated by Nuclear Management Company, LLC November 8, 2004 NRC 2004-0118 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Monthlv ODeratina Renort In accordance with Technical Specification 5.6.3, Enclosure 1 contains the Monthly Operating Report for October 2004 for the Point Beach Nuclear Plant, Units I and 2.

This letter contains no new commitments and no revisions to existing commitments.

Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region III, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW INPO Records Center 6610 Nuclear Road

  • Two Rivers, Wisconsin 54241-9516 Telephone: 920.755.2321
  • Fax: 920.755.6233

Document Control Desk Page 2 bcc: D. L. Koehl D. E. Cooper F. D. Kuester (P460)

J. G. Schweitzer K. K. Meyer B. D. Cole D. A. Weaver (P346) T. E. Ruiz E. J. Weinkam Ill (NMC)

B. T. Dungan J. Rogoff K. Kretzer (WE)

C. S. Smoker (NMC) C. D. Hill J. D. Shaw C. B. Jilek W. F. Smith K. M. Locke J. H. McCarthy File

ENCLOSURE I MONTHLY OPERATING REPORT 4 pages follow

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 11/04/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-7655 REPORTING PERIOD October - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 5,760.4 245,906.3
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 745.0: 5,722.7 242,319.4
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 381,554.5 2,879,748.0 112,774,060.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 11/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-7655 REPORTING PERIOD: October/2004 (Month/Year)

TYPEMETHD OFCAUSE/CORRECTIVE NO. DATE F: FORCED UORTRS O REASON (1) SHUTTING S: SCHEDULED (HO ) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A r I

~rf1 (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 1 average daily power for the month of October was 512.2 MWe.

There were no LERs issued in October for Unit 1.

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 11/04/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-7655 REPORTING PERIOD October - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7,244.9 240,592.6
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 745.0 7,209.9 .237,446.7
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) . 352,856.5. 3,698,352.0 112,199,433.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 11/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-7655 REPORTING PERIOD: October/2004 (Month/Year)

TYPE METHOD OF CAUSE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS S: SCHEDULED (H URS)DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A -.1 (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of October was 473.6 MWe.

There were no LERs issued in October for Unit 2.

Reduction in power on October 8, 2004, to accommodate for corrective maintenance on 345kV Line 151 and on October 23, 2004, for scheduled maintenance on 345kV Line Q303.