Committed to Nuclear Excellene Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0061 GL 97-02 July 11, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 DOCKETS 50-266 AND 50-301 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 MONTHLY OPERATING REPORTS Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of June 2003.

Sincerely, Attachment cc: J. D. Loock, PSCW NRC Regional Administrator NRC Resident Inspector NRC Project Manager

, '2q 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 07/02/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,343.0 235,942.4
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 720.0 4,343.0 232,401.5
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 366,566.5 2,215,812.5 107,767,121.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 7/02/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: June 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUT1ING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F Administrative 5. Other (Explain)

G. Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit I average daily power for the month of June was 509.1 MWe.

Fish intrusion on 6/30/2003, reduced power to 95%

There was one LER on Unit I in the month of June, LER 266/2003-001 Degraded Grid Voltage Relays.

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 07/02/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,297.0 230,050.1
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 720.0 4,255.4 227,021.1
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 368,435.5 2,153,594.5 106,941,398.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 7/02/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: June 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSEICORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F Administrative 5. Other (Explain)

G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 2 average daily power for the month of June was 511.8 MWe.

Fish Intrusion on 6/30, reduced power to 91%

There was one LER on Unit 2 in the month of June, LER 266/2003-001 Degraded Grid Voltage Relays

Text

Committed to Nuclear Excellene Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0061 GL 97-02 July 11, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 DOCKETS 50-266 AND 50-301 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 MONTHLY OPERATING REPORTS Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of June 2003.

Sincerely, Attachment cc: J. D. Loock, PSCW NRC Regional Administrator NRC Resident Inspector NRC Project Manager

, '2q 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 07/02/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,343.0 235,942.4
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 720.0 4,343.0 232,401.5
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 366,566.5 2,215,812.5 107,767,121.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 7/02/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: June 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUT1ING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F Administrative 5. Other (Explain)

G. Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit I average daily power for the month of June was 509.1 MWe.

Fish intrusion on 6/30/2003, reduced power to 95%

There was one LER on Unit I in the month of June, LER 266/2003-001 Degraded Grid Voltage Relays.

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 07/02/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,297.0 230,050.1
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 720.0 4,255.4 227,021.1
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 368,435.5 2,153,594.5 106,941,398.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 7/02/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: June 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSEICORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F Administrative 5. Other (Explain)

G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 2 average daily power for the month of June was 511.8 MWe.

Fish Intrusion on 6/30, reduced power to 91%

There was one LER on Unit 2 in the month of June, LER 266/2003-001 Degraded Grid Voltage Relays