NRC 2002-0034, April 2002 Monthly Operating Report for Point Beach, Units 1 & 2

From kanterella
Jump to navigation Jump to search
April 2002 Monthly Operating Report for Point Beach, Units 1 & 2
ML021340524
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/03/2002
From: Webb T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC 2002-0034
Download: ML021340524 (6)


Text

Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 Committed to Nuclear Excellen> Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0034 GL 97-02 May 03, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of April 2002.

Sincerely, T. J. Webb Regulatory Affairs Manager KML Attachment cc: J. D. Loock, PSCW NRC Region III NRC Senior Resident Inspector NRC Project Manager

--c"4

- Docket 50-266 and 50-301 NRC-2002-0034 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)

To Document Control Desk (NRC)

Dated May 03, 2002 Re: Monthly Operating Report - April 2002

OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 05/02/02 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6,420 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES
2. REPORTING PERIOD: April - 2002
3. LICENSED THERMAL POWER (MWT): 1,518.5
4. NAMEPLATING RATING (GROSS MWE): 537.7
5. DESIGN ELECTRICAL RATING (NET MWE): 515.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 530.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 510.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): n/a
10. REASONS FOR RESTRICTIONS, (IF ANY):

n/a THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 719.0 2,879.0 275,974.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,879.0 226,488.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ONLINE 719.0 2,879.0 222,973.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,091,081.0 4,357,162.0 318,359,613.0
17. GROSS ELECTRICAL ENERGY GENERATED 379,740.0 1,514,260.0 108,056,360.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 363,661.0 1,451,271.5 103,026,791.5
19. UNIT SERVICE FACTOR 100.0% 100.0% 80.8%
20. UNIT AVAILABILITY FACTOR 100.0% 100.0% 81.1%
21. UNIT CAPACITY FACTOR (USING MDC NET) 99.2% 98.8% 76.3%
22. UNIT CAPACITY FACTOR (USING DER NET) 98.2% 97.9% 74.8%
23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 4.4%

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 05/02/02 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: April 2002 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 1 average daily power for the month of March was 500.4 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 05/02/02 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6,420 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES
2. REPORTING PERIOD: April - 2002
3. LICENSED THERMAL POWER (MWT): 1,518.5
4. NAMEPLATING RATING (GROSS MWE): 537.7
5. DESIGN ELECTRICAL RATING (NET MWE): 515.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 532.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): n/a
10. REASONS FOR RESTRICTIONS, (IF ANY):

n/a THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 719.0 2,879.0 260,759.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 286.6 2,385.9 220,167.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ONLINE 284.4 2,372.7 217,226.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 424,563.0 3,539,519.0 313,587,936.0
17. GROSS ELECTRICAL ENERGY GENERATED 149,230.0 1,236,500.0 106,964,540.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 141,924.0 1,183,401.5 101,966,908.5
19. UNIT SERVICE FACTOR 39.6% 82.4% 83.3%
20. UNIT AVAILABILITY FACTOR 39.6% 82.4% 83.4%
21. UNIT CAPACITY FACTOR (USING MDC NET) 38.6% 80.3% 79.7%
22. UNIT CAPACITY FACTOR (USING DER NET) 38.3% 79.8% 78.4%
23. UNIT FORCED OUTAGE RATE 0.0% 2.9% 2.2%

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETIER DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 05/02/02 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: April 2002 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS 3 04/12/02 S 432.4 C 1 (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 2 average daily power for the month of March was 197.8 MWe.

Licensee Event Report (LER) 301/2002-001-00, Completion Of Nuclear Plant Shutdown Required By LCO 3.5.2 Required Action B.1, was submitted to the NRC for the Unit 2 shutdown on Feb. 22, 2002.

There were no Significant Operating Events.