Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis Report
ML23181A107
Person / Time
Site: Hermes
Issue date: 07/18/2023
From: Cuadrado De Jesus S
NRC/NRR/DANU/UAL1
To: Jessup W
Office of Nuclear Reactor Regulation
References
EPID L-2021-NEW-0011
Download: ML23181A107 (1)


Text

July 18, 2023 MEMORANDUM TO: William Jessup, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM: Samuel Cuadrado, Project Manager /RA/

Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF AUGUST 25 AND 30, 2022, PUBLIC MEETINGS ON THE KAIROS HERMES PRELIMINARY SAFETY ANALYSIS REPORT (EPID NO. L-2021-NEW-0011)

Meeting Information:

Applicant: Kairos Power, LLC (Kairos)

Docket/Project No.(s): 05007513 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)

Accession Nos.: ML22227A186 and ML22238A338 Meeting Attendees: See the enclosure for a list of meeting attendees.

Meeting Summary:

On August 25 and 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) staff held partially closed meetings via webinar with Kairos. The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meetings in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ADAMS Accession No. ML21180A271). The purpose of the meetings was to discuss the NRCs safety review of the Kairos Hermes test reactor construction permit application. Specifically, the staff provided clarification to Kairos for the following requests for additional information (RAIs):

  • RAI 339, on inspection of vessel internals and the natural circulation flow path (ML22220A299)
  • RAI 350, on air ingress into the primary heat transport system (ML22227A192)

CONTACT: Samuel Cuadrado, NRR/DANU/UAL1 301-415-2946

W. Jessup 2 During the meetings, Kairos discussed its draft responses to the three RAIs. The NRC staff provided clarification and was able to identify a few areas of the responses in need of additional detail. Kairos understood the clarifications provided and took action to incorporate the additional detail into its formal responses. Kairos also noted several changes that would be made to the PSAR. The NRC staff concluded that Kairos was on a satisfactory path to provide adequate responses to the RAIs in a timely manner. Kairos submitted its formal responses to RAIs 339 and 348 on August 31, 2022, (ML22243A247) and to RAI 350 on September 1, 2022, (ML22252A149), as originally expected (within 30 days of issuance of the RAIs).

No regulatory decisions were made as a result of this meeting.

Docket No. 05007513

Enclosure:

List of Attendees

W. Jessup 3

SUBJECT:

SUMMARY

OF AUGUST 25 AND 30, 2022, PUBLIC MEETINGS ON THE KAIROS HERMES PRELIMINARY SAFETY ANALYSIS REPORT (EPID NO. L-2021-NEW-0011)

DATE: JULY 18, 2023 DISTRIBUTION:

PUBLIC RidsNrrDanuUal1 Resource RidsNrrDanu Resource WJessup, NRR MHiser, NRR EHelvenston, NRR ADAMS Accession Number: ML23181A107 NRC-001 OFFICE NRR/DANU/UAL1/PM NRR/DANU/UAL1/BC NRR/DANU/UAL1/PM NAME SCuadrado WJessup SCuadrado DATE 7/18/2023 7/18/2023 7/18/2023 OFFICIAL RECORD COPY

List of Attendees Name Organization Ben Beasley U.S. Nuclear Regulatory Commission (NRC)

Meg Audrain NRC Alex Chereskin NRC Stephen Philpott NRC Ed Helvenston NRC Jeff Schmidt NRC Samuel Cuadrado NRC Darrell Gardner Kairos Power LLC Drew Peebles Kairos Power LLC Jim Tomkins Kairos Power LLC Chong Chen Kairos Power LLC Gus Merwin Kairos Power LLC Jordan Hagaman Kairos Power LLC Ka-Yen Kairos Power LLC Nicole Schlichting Kairos Power LLC Michael Ellet Kairos Power LLC Delaney Simmons Kairos Power LLC Quan Zhou Kairos Power LLC Tim Drzewiecki Kairos Power LLC Anthonie Cilliers Kairos Power LLC Ian Gifford TerraPower Michael Montecalvo TerraPower Paul Ouellette Engineering Planning and Management, Inc.

Brandon Hartle X-Energy Steve Vaughn X-Energy Brandon Norris X-Energy