Letter Sequence RAI |
---|
|
|
MONTHYEARML21319A3542021-11-29029 November 2021 Acceptance of the Hermes Non-Power Test Reactor Construction Permit Application for Kairos Power LLC Project stage: Acceptance Review ML22024A4922022-01-10010 January 2022 Hermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1 Project stage: Request ML22041A3372022-02-0303 February 2022 Kairos Power LLC, Transmittal of Responses-to NRC Questions 2.3-1 and 2.3-2 on the Hermes Preliminary Safety Analysis Report Project stage: Request ML21364A0132022-02-0808 February 2022 Kairos Power LLC - Application for Construction Permit for Hermes Test Reactor Project stage: Other ML22040A3382022-02-0909 February 2022 Kairos Power LLC, Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Other ML22040A3362022-02-0909 February 2022 Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Request ML22039A2262022-02-17017 February 2022 Audit Plan for the Kairos Hermes Preliminary Safety Analysis Report (PSAR) Section 6.3 Decay Heat Removal System - February 2022 Project stage: Other ML22089A1662022-04-0808 April 2022 Kairos Power LLC - Hermes Construction Permit Preliminary Safety Analysis Report I&C Repor (Chapter 7) Audit Plan (Cac/Epid No. 000955/05007513/L-2021-NEW-0011) Project stage: Other ML22143B0162022-05-27027 May 2022 Audit Plan for Hermes Site Characteristics PSAR Chapter 2 Project stage: Other ML22230D0762022-08-0505 August 2022 Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas System Project stage: Other ML22227A1802022-08-0808 August 2022 Final RAI 348 on Shutdown Rod Reliability Project stage: RAI ML23158A2662023-06-13013 June 2023 Transmittal of Safety Evaluation for Hermes Construction Permit Application Project stage: Approval ML23158A2682023-06-13013 June 2023 Safety Evaluation for Hermes Construction Permit Application Project stage: Approval ML23181A1072023-07-18018 July 2023 Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis Report Project stage: Meeting 2022-02-09
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24247A1602024-09-0303 September 2024 Kairos - Hermes 2 Docs - Final Environmental Assessment and Finding of No Significant Impact for Kairos Hermes 2 Test Reactors in Oak Ridge, Tennessee ML24246A0142024-08-28028 August 2024 NRR E-mail Capture - Regarding DG-5071 Target Set Identification and Development for Nuclear Power Reactors Access ML24206A0842024-07-24024 July 2024 NPS Draft EA Response - Hermes 2 ML24206A0862024-07-24024 July 2024 Construction of Kairos Power, LLC, Hermes 2 Non-Power Test Reactor, Ettp - Project SHPO0004436 ML24193A2442024-07-11011 July 2024 Transmittal Email for the Summary Report for the Regulatory Audit of the Hermes 2 Preliminary Safety Analysis Report ML24180A1392024-06-28028 June 2024 Kairos - Hermes 2 Docs - Advanced Safety Evaluation for Hermes 2 ML24166A2222024-06-14014 June 2024 Kairos - Hermes 2 Docs - FW FW (External) Re Fw Kairos Power Test Reactor NRC ML24138A1562024-05-17017 May 2024 Kairos - Hermes 2 Docs - Preliminary Chapter 5 of Hermes 2 SE to ACRS ML24138A2072024-05-17017 May 2024 Kairos - Hermes 2 Docs - Preliminary Chapter 13 of Hermes 2 SE to ACRS ML24137A2662024-05-15015 May 2024 Kairos - Hermes 2 Docs - Preliminary Chapter 9 of Hermes 2 SE to ACRS ML24135A2602024-05-14014 May 2024 Transmittal Email for Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report ML24136A0682024-05-10010 May 2024 Kairos - Hermes 2 Docs - Preliminary Chapters (2 & 3) of Hermes 2 SE to ACRS ML24116A1622024-04-25025 April 2024 Kairos - Hermes 2 Docs - Draft Environmental Assessment and Finding of No Significant Impact for Kairos Hermes 2 Test Reactors in Oak Ridge, Tennessee ML24114A2802024-04-23023 April 2024 Kairos - Hermes 2 Docs - Preliminary Chapter of Hermes 2 SE to ACRS ML24114A2822024-04-23023 April 2024 Kairos - Hermes 2 Docs - Preliminary Chapter of Hermes 2 SE ML24113A2722024-04-22022 April 2024 Kairos - Hermes 2 Docs - Preliminary Chapter of Hermes 2 SE ML24105A0002024-04-14014 April 2024 Kairos - Hermes 2 Docs - Environmental Audit Summary Report for Hermes 2 ML24103A1762024-04-12012 April 2024 Transmittal Email from NRC to Kairos Power LLC, Request for Confirmation of Information for the Hermes 2 Preliminary Safety Analysis Report ML24095A2922024-04-0404 April 2024 Kairos - Hermes 2 Docs - Preliminary Chapter of Hermes 2 SE ML24080A4502024-03-20020 March 2024 Kairos - Hermes 2 Docs - FW Kairos Power Test Reactor NRC ML24074A3712024-03-14014 March 2024 Kairos - Hermes 2 Docs - Preliminary Chapters of Hermes 2 SE ML24072A3162024-03-12012 March 2024 Kairos - Hermes 2 Docs - FW Transmittal of Responses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report (Courtesy Copy) ML24059A3892024-02-28028 February 2024 Kairos - Hermes 2 Docs - Feb 28 2024 Ipac Updated Species List_ Tennessee Ecological Services Field Office (1).pdf ML24057A3872024-02-26026 February 2024 Hermes 2 General Audit Questions 5.2-13, 5.2-14, and 5.2-15 ML24057A4222024-02-26026 February 2024 Kairos - Hermes 2 Docs - RCI Confirmation Message ML24051A2352024-02-20020 February 2024 Kairos - Hermes 2 Docs - FW HC-1 Status ML24051A2412024-02-20020 February 2024 Kairos - Hermes 2 Docs - Quick Question ML24046A1732024-02-15015 February 2024 Hermes 2 General Audit Question 9.3-1 ML24043A2172024-02-12012 February 2024 Hermes 2 General Audit Questions 5.2-10, 5.2-11, and 5.2-12 ML24206A0872024-02-0707 February 2024 Prshpo Section 106 Initiation Response - Hermes 2 ML24033A1812024-02-0202 February 2024 Hermes 2 General Audit Questions 5.2-6, 5.2-7, 5.2-8, and 5.2-9 ML24030A9732024-01-30030 January 2024 Kairos - Hermes 2 Docs - RCI Preview for Hermes 2 Environmental Audit ML24024A2262024-01-24024 January 2024 Hermes 2 General Audit Question 13.1-11 ML24002B1392024-01-0202 January 2024 Hermes 2 General Audit Questions 2.5-2, 2.5-3, 4.3-2, 4.3-3, 4.5-1, 5.1-1, 5.1-2, 5.1-3, 5.2-2, 5.2-3, 5.2-4, 5.2-5, 6.3-1, 9.1-1, 9.1-2, 9.6-1, 13.1-7 Through 10, TR-1, TR-2, TR-3 ML23346A0162023-12-11011 December 2023 Hermes 2 General Audit Questions 3.5-1, 4.3-1, 5.2-1, 7.4-1, 9.8-1, 11.1-1, 13.1-1 Through 13.1-6, 13.2-1, 14.1-1, and 14.1-2 ML23338A2352023-12-0404 December 2023 Hermes 2 General Audit Questions 7.1-2, 7.1-3, 7.1-4, 7.1-5, and 7.2-3 ML23332A0012023-11-28028 November 2023 Public Summary of November 7 Tribal Consultation Response Letter to the NRC ML23324A1172023-11-20020 November 2023 Hermes 2 General Audit Questions 2.1-1, 2.1-2, 2.2-1 Through 4, 2.5-1, 7.1-1, 7.2-1, and 7.2-2 ML23317A3682023-11-0606 November 2023 Hermes CP Doc - (External_Sender) Construction of Kairos Power, LLC, Hermes Non-Power Test Reactor, Ettp - Project SHPO0001832 ML23307A0552023-11-0101 November 2023 Hermes CP Doc - (External_Sender) Construction of Kairos Power, LLC, Hermes Non-Power Test Reactor, Ettp - Project SHPO0001832 ML23305A0502023-11-0101 November 2023 NRR E-mail Capture - Response to Kairos Request for Non-Public Documents Related to Security ML23304A2092023-10-31031 October 2023 Hermes 2 General Audit Questions 1.3-1 and 13.1-1 ML23296A2202023-10-13013 October 2023 Hermes 2 General Audit Questions 1.5-1 and 1.5-2 ML23276B3992023-10-0303 October 2023 Email to Kairos Providing the Hermes 2 General Audit Plan ML23274A0062023-10-0101 October 2023 Hermes CP Doc - Public Summary of Sep 14 Meeting with Consulting Tribe ML23268A3602023-09-12012 September 2023 Request to Speak Letter from the City of Oak Ridge, Tennessee at the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application ML23226A1722023-08-10010 August 2023 NRR E-mail Capture - Hermes Construction Permit Application Mandatory Hearing Resource Estimate ML23185A0042023-07-0404 July 2023 Hermes CP Doc - Submittal of Supplemental Information from Kairos Power_Redacted (8).pdf ML23180A2982023-06-29029 June 2023 Hermes CP Doc - Public Summary of 6-27-23 Email from Consulting Tribe ML23180A2992023-06-29029 June 2023 Hermes CP Doc - FW Email Summary of the April 20 Kairos Submittal 2024-09-03
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24135A2632024-05-14014 May 2024 Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report ML24103A1782024-04-12012 April 2024 Request for Confirmation of Information for Hermes 2 PSAR ML23006A1112023-01-14014 January 2023 Hermes PSAR General Audit Questions PSAR Section 6.3 ML22227A1922022-08-0808 August 2022 Final RAI 350 for Air Ingress Into the Primary Heat Transport System ML22227A1802022-08-0808 August 2022 Final RAI 348 on Shutdown Rod Reliability ML22224A2402022-07-29029 July 2022 Hermes CP Application General Audit Question on Load Combinations 2024-05-14
[Table view] |
Text
From:
Beasley, Benjamin To:
"gardner@kairospower.com"; "peebles@kairospower.com"; "Jim Tomkins"; "Martin Bryan" Cc:
Cuadrado de Jesus, Samuel; Helvenston, Edward; Schmidt, Jeffrey
Subject:
Final RAI 348 on Shutdown Rod Reliability and Defense in Depth Date:
Monday, August 08, 2022 4:54:00 PM Darrell, Drew, Jim, and Marty,
The Request for Additional Information (RAI) below was transmitted as draft on August 2, 2022. Part 2 of the RAI was clarified to indicate that qualification testing plans are desired.
This RAI is now final. You stated in the clarification call that you expect to respond to this request within 30 days of August 2, 2022.
- Regards, Ben
~~~~~~~~~~~
Benjamin Beasley Senior Project Manager Advanced Reactor Licensing Branch 1 Office of Nuclear Reactor Regulation 301-415-2062 Benjamin.Beasley@nrc.gov REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION
Issue Date: 8/2/2022 Hermes Construction Permit Application
Kairos Power, LLC
Dockets: 05007513--Hermes Non-Power Test Reactor
EPIDS: L-2021-NEW-0011
RAI 348 QUESTION 408 Section 50.34 of Title 10 of the Code of Federal Regulations (10 CFR 50.34), "Contents of applications; technical information," provides requirements for information to be provided in a Construction Permit (CP). 10 CFR 50.34(a)(4) states that a CP shall contain a preliminary analysis and evaluation of structures, systems, and components (SSCs) to determine margins of safety during normal operations and transient conditions and the adequacy of SSCs provided for prevention and mitigation of the consequences of accidents.
As given in the Kairos topical report on principal design criteria for the KP-FHR, criterion 29,
which is referenced in the Hermes Preliminary Safety Analysis Report (PSAR), states, "The protection and reactivity control systems shall be designed to assure an extremely high probability of accomplishing their safety-functions in the event of anticipated operational occurrences." For the Hermes test reactor "anticipated operational occurrences is replaced by postulated events" per PSAR Section 3.1.
NUREG-1537, Part 2, Section 4.2.2, "Control Rods," states that the staff should determine that reasonable assurance exists that the scram features designed for this reactor will perform as necessary to ensure fuel integrity and to protect the health and safety of the public.
Preliminary Safety Analysis Report Section 13.1.10.1, "Recriticality and Unprotected Events" states, "Unprotected events, or events where reactor shutdown is not achievable, are excluded from the design basis." In addition, Section 13.1.10.1 states, "The RCSS [reactivity control and shutdown system] is designed with sufficient independence, diversity, and redundancy from detection and actuation to element insertion to ensure reactor shutdown when necessary."
To reach a reasonable assurance finding that the RCSS has sufficient reliability to preclude unprotected events, the staff is requesting additional information regarding the following:
- 1. Please describe any instrumentation and control design features which provide defense-in-depth or reduce the probability of a common cause failure to preclude an unprotected event.
- 2. What mechanical qualification testing of the RCSS system will be performed to ensure element insertion, including the insertion of the shutdown elements into the pebble bed and control elements into the graphite reflector?
- 3. If control and shutdown elements (beyond the assumed highest worth stuck element) fail to insert, partially insert, or suffer neutron absorber loss (e.g., through the loss of element cladding integrity), are other means of reactivity control available to mitigate postulated events? If other means are not available, please describe how there is sufficient diversity or reliability to justify excluding unprotected events from the design basis.