KP-NRC-2212-002 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 December 8, 2022 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Reponses to NRC Question on Hermes Preliminary Safety Analysis Report
References:
- 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), September 29, 2021 (ML21272A376))
- 2. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1, September 29, 2022 (ML22272A594)
- 3. Audit Plan, Nuclear Regulatory Commission, Plan for a General Audit of the Hermes Construction Permit Application, February 10, 2022 (ML22039A336)
In September 2021, Kairos Power submitted the Construction Permit Application (CPA) for the Hermes non-power reactor. In September 2022, Kairos Power submitted Revision 1 of the Preliminary Safety Analysis Report (PSAR) (Reference 2) as part of the CPA for the Hermes non-power reactor. This letter transmits supplemental information to Chapter 1 of the PSAR to address NRC feedback received in the General Audit (Reference 2).
During the General Audit, NRC staff asked about the schedule for completing the research and development activities listed in Section 1.3.9 of the PSAR. These activities will be completed prior to the completion of construction. The latest projected date for completion provided in Enclosure 1 to Reference 1 is December 2026.
If you have any questions or need any additional information, please contact Drew Peebles at peebles@kairospower.com or at (704) 275-5388, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on December 8, 2022 Peter Hastings, PE Vice President, Regulatory Affairs and Quality
KP-NRC-2212-002 Page 2 xc:
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch