MONTHYEARML21319A3542021-11-29029 November 2021 Acceptance of the Hermes Non-Power Test Reactor Construction Permit Application for Kairos Power LLC Project stage: Acceptance Review ML22024A4922022-01-10010 January 2022 Hermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1 Project stage: Request ML22198A0012022-01-19019 January 2022, 25 January 2022 Summary of 21Jan2022 Phone Conversation W City of Oak Ridge Public Works Project stage: Request ML22028A0022022-02-0202 February 2022 Kairos Hermes Environmental Audit Plan Project stage: Other ML22041A3372022-02-0303 February 2022 Kairos Power LLC, Transmittal of Responses-to NRC Questions 2.3-1 and 2.3-2 on the Hermes Preliminary Safety Analysis Report Project stage: Request ML21364A0132022-02-0808 February 2022 Kairos Power LLC - Application for Construction Permit for Hermes Test Reactor Project stage: Other ML22040A3362022-02-0909 February 2022 Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Request ML22040A3382022-02-0909 February 2022 Kairos Power LLC, Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Other ML22042A0952022-02-10010 February 2022 Kairos Power LLC, Transmittal of Changes to Hermes Construction Permit Application Project stage: Request ML21204A0392022-02-15015 February 2022 Federal Register Notice of Intent to Conduct Scoping and Prepare an EIS - Kairos Hermes CP Review Project stage: Request ML22039A2262022-02-17017 February 2022 Audit Plan for the Kairos Hermes Preliminary Safety Analysis Report (PSAR) Section 6.3 Decay Heat Removal System - February 2022 Project stage: Other ML21326A0592022-02-18018 February 2022 Kairos Hermes CP Review - Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement Project stage: Other ML22106A0002022-02-28028 February 2022 Construction and Demonstration of a Prototype Mobile Microreactor Feis: Reference for Kairos Hermes CP Application Project stage: Other ML22060A2722022-03-0101 March 2022 Kairos Power, LLC, Transmittal of Changes to Maximum Hypothetical Accident Dose Results in Hermes Construction Permit Application Project stage: Request ML22031A2892022-03-10010 March 2022 Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review Project stage: Request ML22088A2942022-03-11011 March 2022 Scoping Comment (3) from Tennessee Historical Commission Kairos Hermes CP Application Review Project stage: Other ML22089A1662022-04-0808 April 2022 Kairos Power LLC - Hermes Construction Permit Preliminary Safety Analysis Report I&C Repor (Chapter 7) Audit Plan (Cac/Epid No. 000955/05007513/L-2021-NEW-0011) Project stage: Other ML22169A0092022-04-12012 April 2022 NPS Scoping Comments on Kairos Test Reactor Project stage: Request ML22107A0062022-04-17017 April 2022 Oak Ridge Reservation Annual Site Environmental Report 2017: Reference for Kairos Hermes CP Application Project stage: Other ML22115A2042022-04-22022 April 2022 Kairos Power, LLC, Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes Environmental Report Project stage: Request ML22117A2152022-04-22022 April 2022, 27 April 2022 Kairos Power LLC, Transmittal of Supplemental Information for NRC Information Need HCUL-10 for the Hermes Environmental Review Project stage: Request ML22117A2182022-04-27027 April 2022 Kairos Power LLC, Transmittal of Changes to Hermes Environmental Report Resulting from NRC Environmental Review Audit Project stage: Request ML22110A0182022-05-0505 May 2022 Kairos Power LLC, Summary of March 23, 2022, Public Outreach Meeting on the Proposed Kairos Hermes Test Reactor with Designated Period for Receipt of Environmental Scoping Comments Project stage: Request ML22143B0162022-05-27027 May 2022 Audit Plan for Hermes Site Characteristics PSAR Chapter 2 Project stage: Other ML22181B1572022-06-30030 June 2022 Kairos Power LLC Transmittal of Changes to Construction Permit Application Project stage: Request ML22194A0142022-08-0101 August 2022, 31 August 2022 Kairos Hermes Construction Permit Application - Issuance of Environmental Scoping Summary Report Project stage: Request ML22230D0762022-08-0505 August 2022 Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas System Project stage: Other ML22227A1802022-08-0808 August 2022 Final RAI 348 on Shutdown Rod Reliability Project stage: RAI ML22196A3872022-08-24024 August 2022 Kairos Hermes CP Review - Environmental Audit Report Project stage: Request ML22272A5932022-09-29029 September 2022 Kairos Power, LLC - Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1 Project stage: Request ML23019A3602022-11-0606 November 2022, 15 November 2022 Kairos Power LLC, Additional Information Related to Construction Permit Application - PSAR Chapter 1 Project stage: Request ML23019A3612022-11-15015 November 2022 Kairos Power LLC, Additional Information Related to Construction Permit Application - PSAR Chapter 1 Project stage: Other ML22329A0112022-11-16016 November 2022 Deis Public Meeting Transcript for Kairos Hermes Construction Permit Application Project stage: Meeting ML22311A5532022-11-16016 November 2022 Kairos Hermes NRC Staff Presentation at Nov 16 Public Meeting on the Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor Project stage: Request ML22342B2822022-12-0808 December 2022 Kairos Power LLC, Transmittal of Reponses to NRC Question on Hermes Preliminary Safety Analysis Report Project stage: Request ML22353A6252022-12-19019 December 2022 Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapter 6 and Response to NRC Question on Dhrs Testing Project stage: Request ML23055A6722023-02-24024 February 2023, 28 February 2023 Kairos Power LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 2 Project stage: Request ML23031A1652023-03-21021 March 2023 Kairos Attendance List Project stage: Request ML23031A1602023-03-21021 March 2023 Summary of Public Meeting for the Draft Environmental Impact Statement for the Kairos Hermes Test Reactor Construction Permit Application ML23151A7432023-05-31031 May 2023 Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 Project stage: Request ML23158A2662023-06-13013 June 2023 Transmittal of Safety Evaluation for Hermes Construction Permit Application Project stage: Approval ML23158A2652023-06-13013 June 2023 Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes Non-Power Test Reactor Project stage: Request ML23158A2682023-06-13013 June 2023 Safety Evaluation for Hermes Construction Permit Application Project stage: Approval ML23181A1072023-07-18018 July 2023 Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis Report Project stage: Meeting ML23353A0692024-01-0505 January 2024 Kairos Power, LLC-Hermes 2-Environmental Report Audit Plan Project stage: Other 2022-03-11
[Table View] |
Hermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1ML22024A492 |
Person / Time |
---|
Site: |
Hermes |
---|
Issue date: |
01/10/2022 |
---|
From: |
NRC |
---|
To: |
|
---|
References |
---|
Download: ML22024A492 (3) |
|
|
---|
Category:E-Mail
MONTHYEARML23332A0012023-11-28028 November 2023 Public Summary of November 7 Tribal Consultation Response Letter to the NRC ML23317A3682023-11-0606 November 2023 Hermes CP Doc - (External_Sender) Construction of Kairos Power, LLC, Hermes Non-Power Test Reactor, Ettp - Project SHPO0001832 ML23305A0502023-11-0101 November 2023 NRR E-mail Capture - Response to Kairos Request for Non-Public Documents Related to Security ML23307A0552023-11-0101 November 2023 Hermes CP Doc - (External_Sender) Construction of Kairos Power, LLC, Hermes Non-Power Test Reactor, Ettp - Project SHPO0001832 ML23274A0062023-10-0101 October 2023 Hermes CP Doc - Public Summary of Sep 14 Meeting with Consulting Tribe NRC-2021-0193, Written Statement from the City of Oak Ridge Tennessee for the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application2023-09-22022 September 2023 Written Statement from the City of Oak Ridge Tennessee for the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application ML23268A3602023-09-12012 September 2023 Request to Speak Letter from the City of Oak Ridge, Tennessee at the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application ML23226A1722023-08-10010 August 2023 NRR E-mail Capture - Hermes Construction Permit Application Mandatory Hearing Resource Estimate ML23185A0042023-07-0404 July 2023 Hermes CP Doc - Submittal of Supplemental Information from Kairos Power_Redacted (8).pdf ML23180A2982023-06-29029 June 2023 Hermes CP Doc - Public Summary of 6-27-23 Email from Consulting Tribe ML23180A2992023-06-29029 June 2023 Hermes CP Doc - FW Email Summary of the April 20 Kairos Submittal ML23177A1972023-06-26026 June 2023 Hermes CP Doc - Public Summary of 6-12-23 Letter from Consulting Tribe ML23173A0082023-06-21021 June 2023 Hermes CP Doc - Re Consultation Summaries from June 2023 Meetings with Consulting Tribe ML23160A2872023-06-0909 June 2023 Hermes CP Doc - General and Accident Analysis Audit Reports-Hermes Construction Permit PSAR (Docket Number 05007513) ML23157A3302023-06-0606 June 2023 Hermes CP Doc - Hermes CP Audit Questions 82-86 and 92-94 for Preliminary Safety Analysis Report Section 4.5 and Chapter 13 ML23157A3312023-06-0606 June 2023 Hermes CP Doc - Hermes CP Audit Questions 87-91 for Preliminary Safety Analysis Report Section 4.5 and Chapter 13 ML23139A2702023-05-19019 May 2023 Hermes CP Doc - Presentation for the 5-22-2023 Pre-Submittal Meeting on Kairos Power Fuel Qualification Supporting the Hermes Operating License Application ML23138A4032023-05-18018 May 2023 Hermes CP Doc - NRC General Audit Questions-Reactor Fuel, Reactor Vessel, Thermal Hydraulic Design, Reactor Coolant System ML23132A3262023-05-12012 May 2023 Hermes CP Doc - NRC Follow-up Emails to Federally Recognized Tribes Re Hermes CP Deis ML23129A7722023-05-0808 May 2023 Hermes CP Doc - Consultation Update for THC and Tdoa Re Kairos Hermes Test Reactor, Oak Ridge, Tn (Project SHPO0001832) ML23122A2922023-05-0202 May 2023 Hermes CP Doc - NRC Follow-Up Emails to Federally Recognized Tribes Re Hermes CP Deis ML23122A2932023-05-0202 May 2023 Hermes CP Doc - NRC Email to THC - Consultation Update Re - Kairos Hermes CP Review ML23115A4802023-04-25025 April 2023 NRR E-mail Capture - Hermes Audit Reports ML23064A0022023-03-0505 March 2023 Hermes CP Doc - Information Related to Government to Government Consultations - Section 106 of the National Historic Preservation Act ML23065A0582023-03-0202 March 2023 NRR E-mail Capture - Preliminary Hermes Construction Permit Application SE Appendix ML23058A2262023-02-27027 February 2023 NRR E-mail Capture - (External_Sender) Re Transmittal of NRC Staff Draft Safety Evaluation Regarding Kairos Power Graphite Materials Qualification Topical Report ML23065A0102023-02-0707 February 2023 NRR E-mail Capture - Remaining Preliminary Chapters of Hermes Construction Permit Application SE ML23036A0002023-02-0202 February 2023 Hermes CP Doc - (External_Sender) Re (External) Kairos Hermes Environmental Review ML23052A1272023-02-0101 February 2023 Hermes SE Chapter 4 - (External_Sender) Proprietary Check ML23031A0362023-01-31031 January 2023 Hermes CP Doc - Consultation Summary ML23006A1112023-01-14014 January 2023 Hermes PSAR General Audit Questions PSAR Section 6.3 ML23019A0502023-01-13013 January 2023 NRR E-mail Capture - General Audit Questions for Hermes PSAR Chapter 2 (Site Characteristics) ML23017A0812023-01-10010 January 2023 Email with Preliminary Chapters of Hermes SE ML23005A1072023-01-0202 January 2023 Hermes PSAR General Audit Question 1.3.9 Regarding 10 CFR 50.34(a)(8) ML23058A2252022-12-23023 December 2022 NRR E-mail Capture - (External_Sender) Re Transmittal of NRC Staff Draft Safety Evaluation Regarding Kairos Power Metallic Material Qualification Topical Report ML23006A1122022-12-16016 December 2022 Hermes SE Chapter 4 - Benjamin Beasley Has Invited You to Work Together in SE Text for Proprietary Review ML23006A1102022-12-16016 December 2022 Hermes SE Chapter 6 - Benjamin Beasley Has Invited You to Work Together in SE Text for Prop Review ML22297A1582022-10-18018 October 2022 Email W Elizabeth Toombs - Kairos Cultural Resource Reports Follow Up ML22242A2042022-08-30030 August 2022 Hermes CP Doc - (External_Sender) (External) Follow-up from NRC-NPS Teams Meeting on Aug 23 ML22220A2992022-08-0808 August 2022 Hermes CP Doc - NRC Final Request for Additional Information 339 for Hermes Construction Permit Application Regarding Inspection of Vessel Internals and the Natural Circulation Flow Path ML22227A1922022-08-0808 August 2022 Final RAI 350 for Air Ingress Into the Primary Heat Transport System ML22227A1802022-08-0808 August 2022 Final RAI 348 on Shutdown Rod Reliability ML22230D0762022-08-0505 August 2022 Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas System ML22224A2402022-07-29029 July 2022 Hermes CP Application General Audit Question on Load Combinations ML23150A2512022-07-19019 July 2022 NRR E-mail Capture - Questions on the Tritium Management System (Tms), Pebble Handling and Storage System (Phss), and Spent Fuel Cooling System (Sfcs) for the General Audit ML22196A0032022-07-14014 July 2022 Hermes CP Doc - Confirmation of Plateau Utility Numbers ML22204A0042022-07-0606 July 2022 Kairos Hermes CP Review - Email from J. Davis to Elizabeth Toombs Cherokee Nation ML22175A1502022-06-24024 June 2022 Hermes CP Doc - Kairos Hermes CP General Audit Question 5.1-13 ML22167A2012022-06-16016 June 2022 Hermes CP Doc - Transmittal of Hermes CP SE Section 3.2 ML22166A3242022-06-0909 June 2022 Hermes CP Doc - Follow-up Questions on the Inert Gas System for the General Audit 2023-09-22
[Table view] |
Text
From: Beasley, Benjamin Sent: Monday, January 10, 2022 1:39 PM To: Darrell Gardner
Subject:
Preliminary questions on the Hermes PSAR, email #1
Dear Mr. Gardner,
By letter dated September 29, 2021, Kairos submitted an application and PSAR for the Hermes test reactor. Based on the review of the PSAR, the NRC staff has developed preliminary questions to support the NRC staffs review of the application.
PSAR Request Request / Question Chapter Number Please submit the representative hourly meteorological data referenced in Section 2.3.3 so that it can be docketed along with the application. This 2.3-1 should be provided in a text file in Regulatory Guide 1.23 format by email, optical disk or other mode. Please coordinate with a project manager on the mode used.
2.3 Meteorology In Section 2.3.4 Kairos states that the short-term dispersion modelling uses ARCON96 with the atmospheric dispersion methodology as outlined in the 2.3-2 KP-FHR mechanistic source term topical report. NRC staff requests that Kairos provide the site-specific inputs and assumptions used to run the ARCON96 model and provide the ARCON96 input and output files.
FEMA flood insurance study (FIS) data:
The Hermes test reactor site is approximately 3 miles upstream from the confluence of the Clinch River and Poplar Creek. In Table 2.4-2, Kairos provided FIS flood elevations at the confluence and applied those FIS flood elevations to the Hermes test reactor site. The NRC staff checked the FIS 2.4-1 data and found there is no FIS data covering the Hermes site in the Poplar Creek watershed. In the PSAR, no illustration is provided for how the FIS flood elevations at the confluence are transferred to the Hermes site.
Please provide information describing how the flood elevation shown in Table 2.4-2 was developed for the Hermes site.
Dam Failure Information:
2.4 Hydrology 2.4-2 In Section 2.4.2.2, Kairos references TVA evaluations of dam safety from 1991 and 2014. Are there more recent evaluations by TVA regarding the safety of Norris and Melton Hill dams? If so, please provide them.
In the PSAR, the design basis flood appears to be supported by two references:
- Reference 2, BARGE, Flood Hazard Evaluation for Y-12 (Bear Creek) and K-25 (Poplar Creek). 2015.
2.4-3
- Reference 6, Tennessee Valley Authority, Flood Analysis for Department of Energy Y-12, ORNL, and K-25 Plants, TVA. 1991.
The staff requests that Kairos submit those two references on the docket.
Section 2.5.3 of the application relies on the information of Clinch River Early Site Permit applications earthquake catalog, which ends in 2013. An 2.5-1 updated (2013 - 2021) earthquake catalog should be provided to demonstrate that the assumptions and conclusions in the CRN PSHA remain valid.
For Section 2.5.4.3, how does Kairos intend to determine that the 2.5-2 foundation rock shows no evidence of karstic dissolution?
2.5 Geology, Seismology, Geologic cross-section A-A (Figure 2.5-2) appears to be missing the Geotechnical Mascot Dolomite, which is shown on the map (Figure 2.5-1) but not in the 2.5-3 Engineering cross-section. Provide a new cross-section that includes all geologic units shown on the surface and encountered in the subsurface.
Geologic cross-section B-B (Figure 2.5-3) shows the Mascot Dolomite appearing to dip to the northwest. However, geologic maps of the site show all units at the site location dipping to the southeast (see Geologic Map of 2.5-4 the Elverton Quadrangle, Tennessee Geological Survey, 2015). Please confirm the correct dip direction of the Mascot Dolomite and provide a new cross-section that shows the correct dip if needed.
Please review the questions for proprietary information and tell me of your conclusion. If there is no proprietary information, this email will be placed into ADAMS as a public document. If there is proprietary information, a non-public record will be created.
If Kairos would like clarification of the preliminary questions, please propose times to discuss them. If Kairos would like to discuss possible responses to the preliminary questions, a public meeting will be scheduled. If there is a need to discuss proprietary information, a portion or all of the meeting may be closed.
In some instances, preliminary questions may support future requests for additional information (RAIs). Kairos will be advised of the need for RAIs by separate correspondence.
If you have any questions or need clarifications on the preliminary questions, please do not hesitate to contact me.
Ben Beasley
~~~~~~~~~~~
Benjamin Beasley Senior Project Manager Advanced Reactor Licensing Branch Office of Nuclear Reactor Regulation 301-415-2062 Benjamin.Beasley@nrc.gov