MONTHYEARML17068A1632017-03-0202 March 2017 NIST Center for Neutron Research Test Reactor - Request for Changes to Technical Specifications to Allow Low Power Testing Project stage: Request ML17068A1642017-03-0202 March 2017 NIST Center for Neutron Research - Statement of No Significant Hazard Resulting from License Amendment Request Dated 03/02/2017 Project stage: Request ML17097A2432017-03-29029 March 2017 Marked-up Version of the License Amendment Request of the Nbsr Technical Specifications Project stage: Request ML17153A1722017-05-25025 May 2017 NIST - Supplement for Request for Changes to Nbsr Technical Specifications to Allow Low Power Testing Project stage: Request ML17318A6952017-11-16016 November 2017 National Institute of Standards and Technology, Request for Additional Information of License Amendment Request for the Renewed Facility License No. TR-5 for the National Bureau of Standards Test Reactor (CAC No. 000955) Project stage: RAI ML17324A4412017-11-17017 November 2017 Supplement for Request for Changes to Nbsr Technical Specifications to Allow Low Power Testing Project stage: Request ML17328A5042017-11-20020 November 2017 Supplement for Request for Changes to Nbsr Technical Specifications to Allow Low Power Testing Project stage: Request ML17335A3692017-12-0101 December 2017 Supplemental Information National Institute of Standards and Technology Request for Additional Information of License Amendment Request for the Renewed Facility License No. R-5 for the National Bureau of Standards Test Reactor Project stage: Supplement ML17292A0622017-12-15015 December 2017 National Institute of Standards and Technology, Amendment No. 11 to the Renewed Facility License No. TR-5 for the National Bureau of Standards Reactor (CAC No. 000955) Project stage: Other ML18010A5622018-02-0202 February 2018 Aerotest Radiography and Research Reactor - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18054A2022018-02-21021 February 2018 Response to Request for Holding Information from Public Disclosure Project stage: Request ML18066A0802018-02-28028 February 2018 Submittal of Response to Request for Holding Information from Public Disclosure Project stage: Request ML18074A1112018-04-0202 April 2018 Request for Withholding Information from Public Disclosure Response to Request to Aerotest Operations, Inc. to Supplement the License Renewal Application Project stage: Withholding Request Acceptance ML21272A3762021-09-29029 September 2021 Kairos Power, LLC - Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes) Project stage: Request ML21306A1322021-10-31031 October 2021 Kairos Power LLC Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes) Project stage: Request ML21319A3542021-11-29029 November 2021 Acceptance of the Hermes Non-Power Test Reactor Construction Permit Application for Kairos Power LLC Project stage: Acceptance Review ML22024A4922022-01-10010 January 2022 Hermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1 Project stage: Request ML22028A0022022-02-0202 February 2022 Kairos Hermes Environmental Audit Plan Project stage: Other ML22041A3372022-02-0303 February 2022 Kairos Power LLC, Transmittal of Responses-to NRC Questions 2.3-1 and 2.3-2 on the Hermes Preliminary Safety Analysis Report Project stage: Request ML21364A0132022-02-0808 February 2022 Kairos Power LLC - Application for Construction Permit for Hermes Test Reactor Project stage: Other ML22040A3362022-02-0909 February 2022 Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Request ML22040A3382022-02-0909 February 2022 Kairos Power LLC, Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Other ML22039A2262022-02-17017 February 2022 Audit Plan for the Kairos Hermes Preliminary Safety Analysis Report (PSAR) Section 6.3 Decay Heat Removal System - February 2022 Project stage: Other ML22089A1662022-04-0808 April 2022 Kairos Power LLC - Hermes Construction Permit Preliminary Safety Analysis Report I&C Repor (Chapter 7) Audit Plan (Cac/Epid No. 000955/05007513/L-2021-NEW-0011) Project stage: Other ML22143B0162022-05-27027 May 2022 Audit Plan for Hermes Site Characteristics PSAR Chapter 2 Project stage: Other ML22230D0762022-08-0505 August 2022 Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas System Project stage: Other ML22227A1802022-08-0808 August 2022 Final RAI 348 on Shutdown Rod Reliability Project stage: RAI ML22286A1672022-10-17017 October 2022 Atomic Alchemy Inc Preliminary Safety Analysis Report Pre-Submittal Audit Plan Project stage: Other ML23093A0272023-04-0404 April 2023 Atomic Alchemy, Inc., PSAR Secondary Pre-Submittal Audit Plan Project stage: Other ML23158A2682023-06-13013 June 2023 Safety Evaluation for Hermes Construction Permit Application Project stage: Approval ML23158A2662023-06-13013 June 2023 Transmittal of Safety Evaluation for Hermes Construction Permit Application Project stage: Approval ML24284A1712023-07-14014 July 2023 NRC-002B - Kairos Power LLC, Construction Permit Application - General Information (July 14, 2023) Project stage: Other ML23195A1252023-07-14014 July 2023 Enclosure 3: Environmental Report H2-ER-0000001, Rev. 0 Project stage: Request ML23181A1072023-07-18018 July 2023 Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis Report Project stage: Meeting ML23237B4652023-09-11011 September 2023 FRN: General Notice. Acceptance for Docketing of the Kairos Power LLC Hermes 2 Test Reactor Construction Permit Project stage: Request ML23290A0302023-10-17017 October 2023 Atomic Alchemy Inc PSAR Tertiary Pre-Submittal Audit Plan Project stage: Other ML23353A0692024-01-0505 January 2024 Kairos Power, LLC-Hermes 2-Environmental Report Audit Plan Project stage: Other 2022-10-17
[Table View] |
Text
From:
Beasley, Benjamin Sent:
Monday, January 10, 2022 1:39 PM To:
Darrell Gardner
Subject:
Preliminary questions on the Hermes PSAR, email #1
Dear Mr. Gardner,
By letter dated September 29, 2021, Kairos submitted an application and PSAR for the Hermes test reactor. Based on the review of the PSAR, the NRC staff has developed preliminary questions to support the NRC staffs review of the application.
PSAR Chapter Request Number Request / Question 2.3 Meteorology 2.3-1 Please submit the representative hourly meteorological data referenced in Section 2.3.3 so that it can be docketed along with the application. This should be provided in a text file in Regulatory Guide 1.23 format by email, optical disk or other mode. Please coordinate with a project manager on the mode used.
2.3-2 In Section 2.3.4 Kairos states that the short-term dispersion modelling uses ARCON96 with the atmospheric dispersion methodology as outlined in the KP-FHR mechanistic source term topical report. NRC staff requests that Kairos provide the site-specific inputs and assumptions used to run the ARCON96 model and provide the ARCON96 input and output files.
2.4 Hydrology 2.4-1 FEMA flood insurance study (FIS) data:
The Hermes test reactor site is approximately 3 miles upstream from the confluence of the Clinch River and Poplar Creek. In Table 2.4-2, Kairos provided FIS flood elevations at the confluence and applied those FIS flood elevations to the Hermes test reactor site. The NRC staff checked the FIS data and found there is no FIS data covering the Hermes site in the Poplar Creek watershed. In the PSAR, no illustration is provided for how the FIS flood elevations at the confluence are transferred to the Hermes site.
Please provide information describing how the flood elevation shown in Table 2.4-2 was developed for the Hermes site.
2.4-2 Dam Failure Information:
In Section 2.4.2.2, Kairos references TVA evaluations of dam safety from 1991 and 2014. Are there more recent evaluations by TVA regarding the safety of Norris and Melton Hill dams? If so, please provide them.
2.4-3 In the PSAR, the design basis flood appears to be supported by two references:
Reference 2, BARGE, Flood Hazard Evaluation for Y-12 (Bear Creek) and K-25 (Poplar Creek). 2015.
Reference 6, Tennessee Valley Authority, Flood Analysis for Department of Energy Y-12, ORNL, and K-25 Plants, TVA. 1991.
The staff requests that Kairos submit those two references on the docket.
2.5 Geology, Seismology, Geotechnical Engineering 2.5-1 Section 2.5.3 of the application relies on the information of Clinch River Early Site Permit applications earthquake catalog, which ends in 2013. An updated (2013 - 2021) earthquake catalog should be provided to demonstrate that the assumptions and conclusions in the CRN PSHA remain valid.
2.5-2 For Section 2.5.4.3, how does Kairos intend to determine that the foundation rock shows no evidence of karstic dissolution?
2.5-3 Geologic cross-section A-A (Figure 2.5-2) appears to be missing the Mascot Dolomite, which is shown on the map (Figure 2.5-1) but not in the cross-section. Provide a new cross-section that includes all geologic units shown on the surface and encountered in the subsurface.
2.5-4 Geologic cross-section B-B (Figure 2.5-3) shows the Mascot Dolomite appearing to dip to the northwest. However, geologic maps of the site show all units at the site location dipping to the southeast (see Geologic Map of the Elverton Quadrangle, Tennessee Geological Survey, 2015). Please confirm the correct dip direction of the Mascot Dolomite and provide a new cross-section that shows the correct dip if needed.
Please review the questions for proprietary information and tell me of your conclusion. If there is no proprietary information, this email will be placed into ADAMS as a public document. If there is proprietary information, a non-public record will be created.
If Kairos would like clarification of the preliminary questions, please propose times to discuss them. If Kairos would like to discuss possible responses to the preliminary questions, a public meeting will be scheduled. If there is a need to discuss proprietary information, a portion or all of the meeting may be closed.
In some instances, preliminary questions may support future requests for additional information (RAIs). Kairos will be advised of the need for RAIs by separate correspondence.
If you have any questions or need clarifications on the preliminary questions, please do not hesitate to contact me.
Ben Beasley
~~~~~~~~~~~
Benjamin Beasley Senior Project Manager Advanced Reactor Licensing Branch Office of Nuclear Reactor Regulation 301-415-2062 Benjamin.Beasley@nrc.gov