ML23019A361
| ML23019A361 | |
| Person / Time | |
|---|---|
| Site: | Hermes File:Kairos Power icon.png |
| Issue date: | 11/15/2022 |
| From: | Hastings P Kairos Power |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| Shared Package | |
| ML23019A360 | List: |
| References | |
| KP?NRC? 2211?001 | |
| Download: ML23019A361 (1) | |
Text
KPNRC2211001 KairosPowerLLC www.kairospower.com 707WTowerAve,SuiteA 5201HawkingDrSE,UnitA 2115RexfordRd,Suite325 Alameda,CA94501 Albuquerque,NM87106 Charlotte,NC28211 November15,2022 DocketNo.507513 USNuclearRegulatoryCommission ATTN:DocumentControlDesk Washington,DC205550001
Subject:
KairosPowerLLC AdditionalInformationRelatedtoConstructionPermitApplication-PSARChapter1
References:
- 1. Letter,KairosPowerLLCtoDocumentControlDesk,SubmittalofthePreliminary SafetyAnalysisReportfortheKairosPowerFluorideSaltCooled,HighTemperature NonPowerReactor(Hermes),Revision1,September29,2022(ML22272A594)
- 2. AuditPlan,NuclearRegulatoryCommission,PlanforaGeneralAuditoftheHermes ConstructionPermitApplication,February10,2022(ML22049A336.)
InSeptember2022,KairosPowersubmittedRevision1ofthePreliminarySafetyAnalysisReport(PSAR)
(Reference1)aspartoftheConstructionPermitApplication(CPA)fortheHermesnonpowerreactor.
ThislettertransmitsacopyofaletterfromtheUSDepartmentofEnergy(DOE)toKairosPower regardingcontractdiscussionsforthemanagementofspentnuclearfuelandhighlevelwaste.The informationinEnclosure1isprovidedtoaddressNRCfeedbackreceivedonPSARChapter1inthe GeneralAudit(Reference2).KairosPowerrequestsNRCconsiderationofthisinformationaspartofthe continuedreviewoftheHermesCPA.
Ifyouhaveanyquestionsorneedanyadditionalinformation,pleasecontactDarrellGardnerat gardner@kairospower.comor(704)7691226.
Sincerely, PeterHastings,PE VicePresident,RegulatoryAffairsandQuality
Enclosure:
LetterfromDOEtoKairosPower xc(w/enclosure):
WilliamJessup,Chief,NRRAdvancedReactorLicensingBranch BenjaminBeasley,ProjectManager,NRRAdvancedReactorLicensingBranch EdwardHelvenston,ProjectManager,NRRAdvancedReactorLicensingBranch SamuelCuadradodeJesus,ProjectManager,NRRAdvancedReactorLicensingBranch MatthewHiser,ProjectManager,NRRAdvancedReactorLicensingBranch