EPID - L-2021-NEW-0011, Hermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1 (Approved, Closed) 29 November 2021 - 18 July 2023 | |
---|---|
Request for: - NEW Approved, Closed | |
Initiation
Results Other: ML21364A013, ML22039A226, ML22040A338, ML22088A294, ML22089A166, ML22106A000, ML22107A006, ML22143B016, ML22230D076, ML23019A361 | |
From: | |
MONTHYEARML21319A3542021-11-29029 November 2021
[table view]Title: Acceptance of the Hermes Non-Power Test Reactor Construction Permit Application for Kairos Power LLC ML22024A4922022-01-10010 January 2022 Title: Hermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1 ML22198A0012022-01-19019 January 2022, 25 January 2022 Title: Summary of 21Jan2022 Phone Conversation W City of Oak Ridge Public Works ML22041A3372022-02-0303 February 2022 Title: Kairos Power LLC, Transmittal of Responses-to NRC Questions 2.3-1 and 2.3-2 on the Hermes Preliminary Safety Analysis Report ML21364A0132022-02-0808 February 2022 Title: Kairos Power LLC - Application for Construction Permit for Hermes Test Reactor ML22040A3382022-02-0909 February 2022 Title: Kairos Power LLC, Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application ML22040A3362022-02-0909 February 2022 Title: Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application ML22042A0952022-02-10010 February 2022 Title: Kairos Power LLC, Transmittal of Changes to Hermes Construction Permit Application ML22039A2262022-02-17017 February 2022 Title: Audit Plan for the Kairos Hermes Preliminary Safety Analysis Report (PSAR) Section 6.3 Decay Heat Removal System - February 2022 ML22106A0002022-02-28028 February 2022 Title: Construction and Demonstration of a Prototype Mobile Microreactor Feis: Reference for Kairos Hermes CP Application ML22060A2722022-03-0101 March 2022 Title: Kairos Power, LLC, Transmittal of Changes to Maximum Hypothetical Accident Dose Results in Hermes Construction Permit Application ML22031A2892022-03-10010 March 2022 Title: Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review ML22088A2942022-03-11011 March 2022 Title: Scoping Comment (3) from Tennessee Historical Commission Kairos Hermes CP Application Review ML22089A1662022-04-0808 April 2022 Title: Kairos Power LLC - Hermes Construction Permit Preliminary Safety Analysis Report I&C Repor (Chapter 7) Audit Plan (Cac/Epid No. 000955/05007513/L-2021-NEW-0011) ML22169A0092022-04-12012 April 2022 Title: NPS Scoping Comments on Kairos Test Reactor ML22107A0062022-04-17017 April 2022 Title: Oak Ridge Reservation Annual Site Environmental Report 2017: Reference for Kairos Hermes CP Application ML22115A2042022-04-22022 April 2022 Title: Kairos Power, LLC, Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes Environmental Report ML22117A2152022-04-22022 April 2022, 27 April 2022 Title: Kairos Power LLC, Transmittal of Supplemental Information for NRC Information Need HCUL-10 for the Hermes Environmental Review ML22117A2182022-04-27027 April 2022 Title: Kairos Power LLC, Transmittal of Changes to Hermes Environmental Report Resulting from NRC Environmental Review Audit ML22110A0182022-05-0505 May 2022 Title: Kairos Power LLC, Summary of March 23, 2022, Public Outreach Meeting on the Proposed Kairos Hermes Test Reactor with Designated Period for Receipt of Environmental Scoping Comments ML22143B0162022-05-27027 May 2022 Title: Audit Plan for Hermes Site Characteristics PSAR Chapter 2 ML22181B1572022-06-30030 June 2022 Title: Kairos Power LLC Transmittal of Changes to Construction Permit Application ML22194A0142022-08-0101 August 2022, 31 August 2022 Title: Kairos Hermes Construction Permit Application - Issuance of Environmental Scoping Summary Report ML22230D0762022-08-0505 August 2022 Title: Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas System ML22227A1802022-08-0808 August 2022 Title: Final RAI 348 on Shutdown Rod Reliability ML22196A3872022-08-24024 August 2022 Title: Kairos Hermes CP Review - Environmental Audit Report ML22272A5932022-09-29029 September 2022 Title: Kairos Power, LLC - Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1 ML23019A3602022-11-0606 November 2022, 15 November 2022 Title: Kairos Power LLC, Additional Information Related to Construction Permit Application - PSAR Chapter 1 ML23019A3612022-11-15015 November 2022 Title: Kairos Power LLC, Additional Information Related to Construction Permit Application - PSAR Chapter 1 ML22342B2822022-12-0808 December 2022 Title: Kairos Power LLC, Transmittal of Reponses to NRC Question on Hermes Preliminary Safety Analysis Report ML22353A6252022-12-19019 December 2022 Title: Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapter 6 and Response to NRC Question on Dhrs Testing ML23055A6722023-02-24024 February 2023, 28 February 2023 Title: Kairos Power LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 2 ML23151A7432023-05-31031 May 2023 Title: Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 ML23158A2682023-06-13013 June 2023 Title: Safety Evaluation for Hermes Construction Permit Application ML23158A2652023-06-13013 June 2023 Title: Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes Non-Power Test Reactor ML23158A2662023-06-13013 June 2023 Title: Transmittal of Safety Evaluation for Hermes Construction Permit Application ML23181A1072023-07-18018 July 2023 Title: Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis Report 2022-04-12 |