Acceptance Review - Vogtle Units 1 and 2 - Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023)
ML23150A080
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/30/2023
From: Turner Z
Plant Licensing Branch II
To: Pournaras D
Southern Nuclear Operating Co
References
EPID L-2023-LLA-0061, EPID L-2023-LLR-0023
Download: ML23150A080 (1)


Text

1 Zach Turner From:

Zach Turner Sent:

Tuesday, May 30, 2023 8:59 AM To:

Pournaras, DeLisa S.

Cc:

Ed Miller; John Lamb; ACCHAMBE@southernco.com; KGLOWERY@southernco.com

Subject:

Acceptance Review-Vogtle, Units 1 and 2-Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDS L-2023-LLA-0061 and L-2023-LLR-0023)

DeLisa,

ByletterdatedMay1,2023(AgencywideDocumentsAccessandManagementSystem(ADAMS)AccessionNo.

ML23121A267),SouthernNuclearOperatingCompany(SNC,thelicensee)submittedalicenseamendmentrequestand areliefrequestforVogtleElectricGeneratingPlant(Vogtle),Units1and2.

TheproposedchangewouldreviseTechnicalSpecification(TS)3.4.14,RCSPressureIsolationValve(PIV)Leakageand SurveillanceRequirement(SR)3.4.14.1toonlyrequiretestingatthefrequenciesspecifiedintheInserviceTesting PrograminaccordancewiththeAmericanSocietyofMechanicalEngineers(ASME)CodeforOperationandMaintenance (OM)ofNuclearPowerPlants.ThiswouldeffectivelyremovePIVtestingat18month,ninemonth,andeventbased frequenciestoconformwiththeASMEOM2yeartestingonapplicableVogtlePIVs.Additionally,SNCproposedan alternativetotherequirementsofASMEOMCodeSectionISTC3522,CategoryCCheckValves,andSubsectionISTC 3630(a)underSectionISTC3630,LeakageRateforOtherThanContainmentIsolationValves,forapplicableVogtle PIVstoallowtestingtobeconductedataperformancebasedfrequency,asspecifiedinNuclearEngineeringInstitute 9401,Revision3A.

ThepurposeofthisemailistoprovidetheresultsoftheU.S.NuclearRegulatoryCommission(NRC)staffsacceptance reviewofthisamendmentandreliefrequest.Theacceptancereviewwasperformedtodetermineifthereissufficient technicalinformationinscopeanddepthtoallowtheNRCstafftocompleteitsdetailedtechnicalreview.The acceptancereviewisalsointendedtoidentifywhethertheapplicationhasanyreadilyapparentinformation insufficienciesinitscharacterizationoftheregulatoryrequirementsorthelicensingbasisoftheplant.

ConsistentwithSection50.90ofTitle10oftheCodeofFederalRegulations(10CFR),anapplicationforanamendment toalicense(includingthetechnicalspecifications)mustfullydescribethechangesrequested,andfollowingasfaras applicable,theformprescribedfororiginalapplications.Section50.34of10CFRaddressesthecontentoftechnical informationrequired.Thissectionstipulatesthatthesubmittaladdressthedesignandoperatingcharacteristics,unusual ornoveldesignfeatures,andprincipalsafetyconsiderations.

Additionally,pursuanttoSections50.55a(z)(1)and50.55a(z)(2)ofTitle10oftheCodeofFederalRegulations(10CFR),

theapplicantshalldemonstratethattheproposedalternativeswouldprovideanacceptablelevelofqualityandsafety, orthatcompliancewiththespecifiedrequirementsofSection50.55awouldresultinhardshiporunusualdifficulty withoutacompensatingincreaseinthelevelofqualityorsafety.

TheNRCstaffhasreviewedyourapplicationandconcludedthatitdoesprovidetechnicalinformationinsufficientdetail toenabletheNRCstafftocompleteitsdetailedtechnicalreviewandmakeanindependentassessmentregardingthe acceptabilityoftheproposedamendmentandreliefrequestsintermsofregulatoryrequirementsandtheprotectionof publichealthandsafetyandtheenvironment.Giventhelesserscopeanddepthoftheacceptancereviewascompared tothedetailedtechnicalreview,theremaybeinstancesinwhichissuesthatimpacttheNRCstaffsabilitytocomplete thedetailedtechnicalreviewareidentifieddespitecompletionofanadequateacceptancereview.Ifadditional informationisneeded,youwillbeadvisedbyseparatecorrespondence.

2 Basedontheinformationprovidedinyoursubmittal,theNRCstaffhasestimatedthatthislicensingrequestwilltake approximately220hourstocompletethelicenseamendmentrequest,andanadditional230hourstocompletethe reliefrequest.TheNRCstaffexpectstocompletethisreviewbyApril30,2024.Ifthereareemergentcomplexitiesor challengesinourreviewthatwouldcausechangestotheinitialforecastedcompletiondateorsignificantchangesinthe forecastedhours,thereasonsforthechanges,alongwiththenewestimates,willbecommunicatedduringtheroutine interactionswiththeassignedprojectmanager.

TheseestimatesarebasedontheNRCstaffsinitialreviewoftheapplicationandtheycouldchange,duetoseveral factorsincludingrequestsforadditionalinformation,unanticipatedadditionofscopetothereview,andreviewbyNRC advisorycommitteesorhearingrelatedactivities.AdditionaldelaymayoccurifthesubmittalisprovidedtotheNRCin advanceorinparallelwithindustryprograminitiativesorpilotapplications.

Ifyouhaveanyquestions,pleasecontactmeat(301)4152258,orviaemailatzachary.turner@nrc.gov.

ZachM.Turner,ProjectManager PlantLicensingBranchII1 DivisionofOperatingReactorLicensing OfficeofNuclearReactorRegulation