 Issue dateTitleTopic
ML24016A11330 January 2024Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants
ML23279A00417 January 2024Amendment No. 194 to Remove Combined License Appendix C
ML23317A20722 December 2023Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448Shutdown Margin
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
ML23311A2457 November 2023Pre-Submittal Meeting on November 7, 2023 - License Amendment Request to Revise the Ultimate Heat Sink Mission Time (Slides)Safe Shutdown
Ultimate heat sink
Mission time
ML23268A0577 November 2023Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003)Probabilistic Risk Assessment
Fire Protection Program
ML23263A98512 October 2023Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing
ML23283A0478 October 2023Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request
ML23283A0458 October 2023E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request
ML23093A0281 August 2023Issuance of Amendments Nos. 220 and 203, Regarding Use of Accident Tolerant Fuel Lead Test AssembliesSafe Shutdown
Shutdown Margin
Mission time
Anticipated operational occurrence
Probabilistic Risk Assessment
Coatings
Cyber Security
Surveillance Frequency Control Program
Severe Accident Management Guideline
Fuel cladding
Fire Protection Program
ML23158A01831 July 2023Issuance of Amendments Nos. 219 and 202, Regarding Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490Unanalyzed Condition
Boric Acid
Shutdown Margin
Surveillance Frequency Control Program
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Unidentified leakage
ML23158A20819 July 2023LAR-23-005 U/4 Amd 189 Timing of TS Effectiveness Prior to Initial Criticality Amendment
ML23115A14915 June 2023Issuance of Amendments No. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring MethodologyAnticipated operational occurrence
Surveillance Frequency Control Program
ML23150A08030 May 2023Acceptance Review - Vogtle Units 1 and 2 - Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023)
ML23048A0681 March 2023Summary of February 13, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc. Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2
ML23013A21813 January 2023Amendment No. 189 to License NPF-91 - Tech Spec Limiting Conditions for Operability Req for Auto Depressurization System Stage 4 Flow Paths Prior to Initial Criticality
ML22279A01222 November 2022Attachment Amendment 187 U4 (LAR-22-003)Boric Acid
Fire Protection Program
ML22116A0845 July 2022Issuance of Amendment Nos. 215 and 198, Regarding Revision to Technical Specification 3.7.2, Main Steam Isolation Valves (Msivs)Safe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Incorporated by reference
Tornado Missile Protection
Surveillance Frequency Control Program
Earthquake
ML22069A00427 April 2022Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed ValvesHigh Radiation Area
Incorporated by reference
Surveillance Frequency Control Program
Exemption Request
ML21349A5182 February 2022Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS LeakageSurveillance Frequency Control Program
Pressure Boundary Leakage
Fire Protection Program
ML21344A00326 January 2022Issuance of Amendments Regarding Revision to Use Beacon Power Distribution Monitoring SystemShutdown Margin
Surveillance Frequency Control Program
ML21316A0555 January 20221 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163Nondestructive Examination
ML21314A1507 December 2021Issuance of Amendment Nos. 210 and 193, Regarding Revision to Technical Specification 3.3.5, 4.16 (Kilovolt) Kv (Engineered Safety Feature) Esf Bus Loss of Power (LOP) Instrumentation (EPID L 2021-LLA-0054Anticipated operational occurrence
Surveillance Frequency Control Program
Nonconservative Technical Specifications
ML21270A08618 November 2021Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative ControlsHigh Radiation Area
Fire Protection Program
ML21217A09121 September 2021SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization PositionsFLEX
Minimum staff
Fire Protection Program
ML21225A55331 August 2021August 13,2021, Public Meeting Summary with Southern Nuclear Operating Regarding Proposed LAR to Revise Technical Specifications Related to Reactor Trip System & Engineered Safety Feature Actuation System Instrumentation for Vogtle 1&2 (L-2Anticipated operational occurrence
ML21167A31530 July 2021Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated PositionUltimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Recently irradiated fuel
Fire Protection Program
ML21068A08230 July 2021Issuance of Amendment Nos. 206 and 189, Regarding a License Amendment Request for a Risk-Informed Resolution to GSI-191Ultimate heat sink
Probabilistic Risk Assessment
Coatings
Surveillance Frequency Control Program
Large early release frequency
Exemption Request
Maintenance Rule Program
NL-21-0379, Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions27 April 2021Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization PositionsFLEX
ML21095A08719 April 2021Non-Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values
ML19346E46330 January 2020Issuance of Amendments Nos. 202 and 185 Regarding End State Revision from Hot Shutdown to Cold Shutdown for Several Technical SpecificationsAnticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
ML19337C32229 January 2020Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Pressure Boundary Leakage
Fire Protection Program
ML19312A05419 November 2019Figure 3.4.16-1 - Reactor Coolant Dose Equivalent I-131 Reactor Coolant Specific Activity Limit Versus Percent of Rated Thermal Power with the Reactor Coolant Specific Activity
ML19046A08824 June 2019Issuance of Amendments Request for TS Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidated Line Item
ML19064A77426 April 2019Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff TablesFire Protection Program
ML18304A39411 January 2019Issuance of Amendment Nos. 198 and 181, Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing BasisSafe Shutdown
High winds
Ultimate heat sink
Mission time
Tornado Missile
Probabilistic Risk Assessment
Tornado Generated Missile
Tornado Missile Protection
Large early release frequency
Tornado Missile Risk Evaluator
Earthquake
Fuel cladding
ML18263A03929 October 2018Issuance of Amendments to Extend the Containment Type a Leak Rate Test Frequency to 15 Years and Type C Leak Rate Test Frequency to 75 Months (CAC Nos. MG0240 and MG0241; EPID L-2017-LLA-0295)High winds
Internal Flooding
Probabilistic Risk Assessment
Coatings
Multiple Spurious Operation
Aging Management
Moisture barrier
ML18180A06210 August 2018Issuance of Amendment Nos. 196 and 179 Regarding Application of the Seismic Probabilistic Risk Assessment Into the Previously Approved 10 CFR.50.69. Categorization ProcessSafe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Cyber Security
Large early release frequency
Earthquake
ML18183A07326 July 2018Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293)Health Physics Network
High winds
ML18123A51431 May 2018Amendment 124 - Vogtle Electric Generating Plant Unit 3 COLR and Consistency Changes (LAR-18-006)
ML18123A51531 May 2018Amendment 123 - Vogtle Electric Generating Plant Unit 4 COLR and Consistency Changes (LAR-18-006)
ML18075A10229 March 2018Amendment - Vogtle Electric Generating Plant Unit 4 LAR 17-027
ML18075A10029 March 2018Amendment - Vogtle Electric Generating Plant Unit 3 LAR 17-027
ML18012A0687 February 2018Issuance of Amendments Regarding Changes to Surveillance Requirement 3.3.1.3 (CAC Nos. MF9745 and MF9746; EPID L-2017-LLA-0231)Anticipated operational occurrence
Surveillance Frequency Control Program
ML17214A5462 October 2017Issuance of Amendments Regarding the Adoption of TSTF-547, Revision 1, Clarification of Rod Position RequirementsShutdown Margin
Surveillance Frequency Control Program
ML17213A13319 September 2017Issuance of Amendments Regarding Changes to Technical Specification 3.7.9 to Support Nuclear Service Cooling Water Transfer Pump RepairsSafe Shutdown
Ultimate heat sink
ML17198B6335 September 2017Issuance of Amendments Regarding Technical Specification Requirements for Unavailable Barriers (TSTF-427)Time of Discovery
High winds
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Turbine Missile
ML17186A27631 August 2017Issuance of Amendments Regarding the Control Room Ventilation System Surveillance Requirements TSTF-522, Rev. 0Surveillance Frequency Control Program
ML15127A6698 August 2017Issuance of Amendment Nos. 188 and 171, Implementation of NEI 06-09, Risk Informed Technical Specifications Initiative 4B, Risk Managed Technical Specification GuidelinesSafe Shutdown
High Radiation Area
Ultimate heat sink
Mission time
Stroke time
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Cyber Security
Functionality Assessment
FLEX
Surveillance Frequency Control Program
Large early release frequency
Offsite Circuit
Backfit
ML17152A21830 June 2017Southern Nuclear Fleet - Issuance of Amendments Regarding the Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (CAC Nos. MF8176 - MF8181)High Radiation Area
Squib
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program