Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23150A080 | 30 May 2023 | Acceptance Review - Vogtle Units 1 and 2 - Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) | |
ML23095A296 | 14 April 2023 | Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds (Vegp 3&4-Isi1- Alt-17) | |
ML22259A182 | 22 September 2022 | Request for Proposed Inservice Testing Alternative ALT-VR-01 | Incorporated by reference |
ML22118A076 | 13 May 2022 | Cover Letter for Vogtle Electric Generating Plant, Units 3 and 4 Request for Alternative Requirements for Inservice Test Interval Code Edition (VEGP 3&4-IST-ALT-01R2) | Incorporated by reference |
ML22021A001 | 24 January 2022 | Relief Request for Proposed Alternative Requirements for the Repair of Reactor Vessel Head Penetrations for the Fourth 10-Year Inservice Inspection Interval, VEGP-ISI-ALT-04-05, Version 1.0 | Non-Destructive Examination |
ML21154A212 | 3 June 2021 | Enclosure 1 - Vogtle Electric Generating Plant (VEGP) Unit 3 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1): Alternative Requirements for ASME Section III Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16) | Non-Destructive Examination Liquid penetrant Through-Wall Leak |
ML21154A213 | 3 June 2021 | Enclosure 2 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14162(VEGP 3-ALT-16) | Reverse polarity |
ND-21-0392, Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16) | 3 June 2021 | Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16) | Reverse polarity |
ML21040A165 | 9 February 2021 | (Vegp), Units 3 and 4, Revision to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2): Alternative Requirements for ASME Section XI Examination Coverage of Weldolet Branch Connection Welds | Nondestructive Examination Liquid penetrant |
ML20352A155 | 11 January 2021 | Proposed Relief Request for Alternative VEGP-ISI-ALT-04-04 to the Requirements of the ASME Code | Hydrostatic Incorporated by reference |
ML20307A141 | 12 November 2020 | Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal | Incorporated by reference Coronavirus COVID-19 |
NL-20-1262, Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion | 30 October 2020 | Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion | Incorporated by reference Coronavirus COVID-19 |
ML20216A399 | 6 August 2020 | Relief Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML20143A233 | 3 June 2020 | Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) | Incorporated by reference Coronavirus |
ML20132A153 | 14 May 2020 | ASME Code Alternative - May 14, 2020 Presubmittal Technical Exchange for Preservice Inspection (PSI) Alternative | |
ML20034E894 | 11 February 2020 | Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 | Incorporated by reference |
ND-20-0083, Revision to Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01R1) | 6 February 2020 | Revision to Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01R1) | Incorporated by reference |
ND-19-1294, Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01) | 31 October 2019 | Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01) | Incorporated by reference |
ML18320A019 | 30 November 2018 | Relief Request Regarding Examination Coverage for Certain ASME Code Class 2 Category Welds (VEGP-ISI-RR-05) | Incorporated by reference Liquid penetrant |
ML18296A717 | 31 October 2018 | Relief Request Regarding Examination Coverage for Certain Pressurizer and Steam Generator Welds (VEGP-ISI-RR-03) | |
ND-18-1158, Revision to Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4-PSI/ISI-ALT-10R1) | 30 August 2018 | Revision to Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4-PSI/ISI-ALT-10R1) | Hydrostatic |
NL-18-0428, Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1 | 9 April 2018 | Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1 | |
ML18054A065 | 5 March 2018 | Cover Letter - Vogtle Electric Generating Plant - Request for Alternative (ALT-9) | |
ML17171A102 | 27 June 2017 | Inservice Inspection Alternative Regarding Category B-N-2 and B-N-3 Welds (VEGP ISI ALT 13) | Incorporated by reference |
ML17061A202 | 17 March 2017 | Request for Alternative RR-PR-03 Regarding Nuclear Service Cooling Water Pump Instrument Accuracy | |
ML17037D050 | 17 February 2017 | and 2; Request to Use Asme Code Case OMN-18 as an Alternative to Inservice Testing Requirements (CAC Nos. MF8188 and MF8189) | Boric Acid Incorporated by reference |
NL-17-0101, Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule | 26 January 2017 | Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule | Aging Management |
ML17006A109 | 26 January 2017 | Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads Inflange Inspection | Incorporated by reference |
ML16326A044 | 8 December 2016 | Alternative for Pump and Valve Inservice Testing Program | Boric Acid Incorporated by reference |
ML16264A321 | 14 October 2016 | Alternatives for Pumps and Valves Inservice Testing Program | |
ML14030A570 | 20 March 2014 | Request for Alternatives VEGP-ISI-ALT-06 | Probabilistic Risk Assessment Incorporated by reference |
ML13123A160 | 7 May 2013 | (VEGP) - Safety Evaluation of Relief Request VEGP-ISI-ALT-09, Version 2.0, Regarding Leakage Tests for Reactor Coolant Pressure Boundary Components | VT-2 |
ML13032A106 | 7 February 2013 | Safety Evaluation of Relief Request VEGP-ISI-ALT-08, Version 1, Regarding Installation of a Mechanical Clamp on a Class 1 Valve - Fourth 10-Year Interval | VT-2 Incorporated by reference Pressure Boundary Leakage |
ML100900129 | 11 June 2010 | Relief Requests VEGP-ISI-ALT-04 (Units 1 and 2) and VEGP-ISI-RR-01 (Unit 2) Inservice Inspection Alternatives for Third and Subsequent Inservice Inspection Intervals (TAC Nos. ME2226, ME2227, and ME1134) | |
ML101200088 | 30 April 2010 | Acceptance of Vogtle Relief Request (VEGP-ISI-ALT-03) Dated April 7, 2010 | |
NL-09-1410, VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii) | 9 September 2009 | VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii) | |
ML073100435 | 15 November 2007 | Third 10-Year Interval, Inservice Program Relief Request RR-V-1 (Tac Nos. MD5409 and MD5410) | |
ML062770359 | 29 September 2006 | Evaluation of Relief Request ISI-GEN-ALT-06-02 | Incorporated by reference Dissimilar Metal Weld |
NL-06-1713, Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays | 10 August 2006 | Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays | Weld Overlay Hydrostatic Nondestructive Examination Liquid penetrant Dissimilar Metal Weld |
ML051030199 | 25 April 2005 | RR, ISI Program Intervals for Alternative Alignment of Iwe/Iwl Inspection Program (Tac No. MC4870, MC4871, MC4872, MC4873, MC4874, MC4875) | Incorporated by reference |
ML033280037 | 21 November 2003 | Safety Evaluation Re. Request to Use ASME Code Case N-661 | Weld Overlay |
ML022590457 | 16 September 2002 | Code Relief, Relief Request for the Second Ten-Year Interval Inservice Testing Program |