 Issue dateTitleTopic
ML23150A08030 May 2023Acceptance Review - Vogtle Units 1 and 2 - Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023)
ML23095A29614 April 2023Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds (Vegp 3&4-Isi1- Alt-17)
ML22259A18222 September 2022Request for Proposed Inservice Testing Alternative ALT-VR-01Incorporated by reference
ML22118A07613 May 2022Cover Letter for Vogtle Electric Generating Plant, Units 3 and 4 Request for Alternative Requirements for Inservice Test Interval Code Edition (VEGP 3&4-IST-ALT-01R2)Incorporated by reference
ML22021A00124 January 2022Relief Request for Proposed Alternative Requirements for the Repair of Reactor Vessel Head Penetrations for the Fourth 10-Year Inservice Inspection Interval, VEGP-ISI-ALT-04-05, Version 1.0Non-Destructive Examination
ML21154A2123 June 2021Enclosure 1 - Vogtle Electric Generating Plant (VEGP) Unit 3 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1): Alternative Requirements for ASME Section III Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16)Non-Destructive Examination
Liquid penetrant
Through-Wall Leak
ML21154A2133 June 2021Enclosure 2 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14162(VEGP 3-ALT-16)Reverse polarity
ND-21-0392, Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16)3 June 2021Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16)Reverse polarity
ML21040A1659 February 2021(Vegp), Units 3 and 4, Revision to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2): Alternative Requirements for ASME Section XI Examination Coverage of Weldolet Branch Connection WeldsNondestructive Examination
Liquid penetrant
ML20352A15511 January 2021Proposed Relief Request for Alternative VEGP-ISI-ALT-04-04 to the Requirements of the ASME CodeHydrostatic
Incorporated by reference
ML20307A14112 November 2020Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report SubmittalIncorporated by reference
Coronavirus
COVID-19
NL-20-1262, Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion30 October 2020Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage CompletionIncorporated by reference
Coronavirus
COVID-19
ML20216A3996 August 2020Relief Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XIIncorporated by reference
ML20143A2333 June 2020Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19))Incorporated by reference
Coronavirus
ML20132A15314 May 2020ASME Code Alternative - May 14, 2020 Presubmittal Technical Exchange for Preservice Inspection (PSI) Alternative
ML20034E89411 February 2020Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1Incorporated by reference
ND-20-0083, Revision to Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01R1)6 February 2020Revision to Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01R1)Incorporated by reference
ND-19-1294, Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01)31 October 2019Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01)Incorporated by reference
ML18320A01930 November 2018Relief Request Regarding Examination Coverage for Certain ASME Code Class 2 Category Welds (VEGP-ISI-RR-05)Incorporated by reference
Liquid penetrant
ML18296A71731 October 2018Relief Request Regarding Examination Coverage for Certain Pressurizer and Steam Generator Welds (VEGP-ISI-RR-03)
ND-18-1158, Revision to Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4-PSI/ISI-ALT-10R1)30 August 2018Revision to Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4-PSI/ISI-ALT-10R1)Hydrostatic
NL-18-0428, Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-19 April 2018Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1
ML18054A0655 March 2018Cover Letter - Vogtle Electric Generating Plant - Request for Alternative (ALT-9)
ML17171A10227 June 2017Inservice Inspection Alternative Regarding Category B-N-2 and B-N-3 Welds (VEGP ISI ALT 13)Incorporated by reference
ML17061A20217 March 2017Request for Alternative RR-PR-03 Regarding Nuclear Service Cooling Water Pump Instrument Accuracy
ML17037D05017 February 2017and 2; Request to Use Asme Code Case OMN-18 as an Alternative to Inservice Testing Requirements (CAC Nos. MF8188 and MF8189)Boric Acid
Incorporated by reference
NL-17-0101, Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule26 January 2017Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations ScheduleAging Management
ML17006A10926 January 2017Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads Inflange InspectionIncorporated by reference
ML16326A0448 December 2016Alternative for Pump and Valve Inservice Testing ProgramBoric Acid
Incorporated by reference
ML16264A32114 October 2016Alternatives for Pumps and Valves Inservice Testing Program
ML14030A57020 March 2014Request for Alternatives VEGP-ISI-ALT-06Probabilistic Risk Assessment
Incorporated by reference
ML13123A1607 May 2013(VEGP) - Safety Evaluation of Relief Request VEGP-ISI-ALT-09, Version 2.0, Regarding Leakage Tests for Reactor Coolant Pressure Boundary ComponentsVT-2
ML13032A1067 February 2013Safety Evaluation of Relief Request VEGP-ISI-ALT-08, Version 1, Regarding Installation of a Mechanical Clamp on a Class 1 Valve - Fourth 10-Year IntervalVT-2
Incorporated by reference
Pressure Boundary Leakage
ML10090012911 June 2010Relief Requests VEGP-ISI-ALT-04 (Units 1 and 2) and VEGP-ISI-RR-01 (Unit 2) Inservice Inspection Alternatives for Third and Subsequent Inservice Inspection Intervals (TAC Nos. ME2226, ME2227, and ME1134)
ML10120008830 April 2010Acceptance of Vogtle Relief Request (VEGP-ISI-ALT-03) Dated April 7, 2010
NL-09-1410, VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii)9 September 2009VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii)
ML07310043515 November 2007Third 10-Year Interval, Inservice Program Relief Request RR-V-1 (Tac Nos. MD5409 and MD5410)
ML06277035929 September 2006Evaluation of Relief Request ISI-GEN-ALT-06-02Incorporated by reference
Dissimilar Metal Weld
NL-06-1713, Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays10 August 2006Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld OverlaysWeld Overlay
Hydrostatic
Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
ML05103019925 April 2005RR, ISI Program Intervals for Alternative Alignment of Iwe/Iwl Inspection Program (Tac No. MC4870, MC4871, MC4872, MC4873, MC4874, MC4875)Incorporated by reference
ML03328003721 November 2003Safety Evaluation Re. Request to Use ASME Code Case N-661Weld Overlay
ML02259045716 September 2002Code Relief, Relief Request for the Second Ten-Year Interval Inservice Testing Program