Letter Sequence Acceptance Review |
---|
EPID:L-2019-LLA-0096, Issuance of Amendments and Granting of Exemptions Crediting Previously Completed First Plant and First Three Plant Tests (LAR 18-019) (Approved, Closed) |
|
|
|
---|
Category:Acceptance Review Letter
MONTHYEARML23150A0802023-05-30030 May 2023 Acceptance Review - Vogtle Units 1 and 2 - Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML20290A2842022-08-0303 August 2022 Licensee Letter Subject: Finding That All Acceptance Criteria Are Met for Vogtle Electric Generating Plant, Unit 3 Combined License ML21095A0872021-04-19019 April 2021 Non-Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values ML20258A1462020-09-0909 September 2020 E-Mail - Acceptance Review - Vogtle GSI-191 Exemption ML19319A0112019-09-11011 September 2019 Acceptance Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 19-014, Tornado Missile Protection for Main Steam Vent Stacks and Wall ML19220A9542019-08-0808 August 2019 LAR 19-013, Pressurizer Surge Line Stratification Evaluation ML19182A0142019-07-0303 July 2019 Acceptance Letter Vogtle 3 and 4 LAR 19-012 ML19135A1132019-05-15015 May 2019 Acceptance Letter for Vogtle Units 3 and 4, LAR 19-006, Crediting ADS Blowdown First Three Plant Test ML18156A4432018-06-0707 June 2018 Acceptance Letter for LAR 18-011 ESF Safeguard Actuation TS Applicability Changes ML18082B0942018-03-27027 March 2018 Acceptance Letter (LAR-17-043) Containment Pressure Analysis ML18052B0642018-02-26026 February 2018 Acceptance Letter for LAR 18-003 ML18025A7862018-01-31031 January 2018 Acceptance Letter for LAR 17-042 ML18019A3622018-01-25025 January 2018 (LAR 17-037) Acceptance Letter ML18022B1142018-01-22022 January 2018 Acceptance Letter (LAR 17-044) ML17319A8472017-11-21021 November 2017 Acceptance Review Letter, License Amendment Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML17166A4332017-06-26026 June 2017 Supplemental Information Needed for Acceptance of Systematic Risk-Informed Assessment of Debris Technical Report ML17033A0232017-02-14014 February 2017 Request for One-Time Exception to Nuclear Reactor Regulation Office Instructions LIC-109, LIC-101, and LIC-500 Acceptance Review Criteria ML16245A9142016-09-0101 September 2016 Acceptance Review - NSCW Transfer Pump Vogtle Unit 2 ML16224A1432016-08-23023 August 2016 Acceptance Review Regarding Reactor Vessel Threads in Flange Examination ML16204A0422016-07-26026 July 2016 Acceptance Letter, Unacceptable, with Opportunity to Supplement ML13086A0852013-04-26026 April 2013 Acceptance Review Results Regarding Implementation of Risk-Informed Technical Specifications ML12115A0742012-04-20020 April 2012 NRR E-mail Capture - Acceptance Review for VEGP VEGP-ISI-ALT-07 ASME Code Case N-729-1, NL-12-0663 ML11102A0162011-04-12012 April 2011 E-Mail Acceptance Review for TSTF-361-A RHR Lop Testing (TAC ME5853/ME5854) ML1108800402011-03-28028 March 2011 Email Acceptance Review for License Application NL-11-0280 Steam Generator Water Level Hi-Hi Setpoint Change ML1019302772010-07-19019 July 2010 Acceptance Review Regarding License Amendment Request for Technical Specification Table 3.3.1-1 ML1012000882010-04-30030 April 2010 Acceptance of Vogtle Relief Request (VEGP-ISI-ALT-03) Dated April 7, 2010 2023-05-30
[Table view] Category:Letter
MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) ML24120A2832024-04-30030 April 2024 Project Manager Reassignment 2024-09-09
[Table view] |
Text
May 15, 2019 Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.
3535 Colonnade Parkway BIN B237 Birmingham, AL 35243
SUBJECT:
ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REQUEST FOR LICENSE AMENDMENT FOR CREDITING PREVIOUSLY COMPLETED ADS BLOWDOWN FIRST THREE PLANT TESTS FOR THE VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4 (LAR-19-006)(EPID NO. L-2019-LLA-0096)
Dear Mr. Whitley:
By letter dated April 26, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19119A249), Southern Nuclear Operating Company (SNC) submitted a request for a license amendment to Combined License (COL) Numbers NPF-91 and NPF-92, for the Vogtle Electric Generating Plant Units 3 and 4, respectively. The requested amendment proposes changes to the COL Conditions and Updated Final Safety Analysis Report (UFSAR) in the form of departures from the incorporated plant-specific Design Control Document Tier 2* and Tier 2 information related to the design-specific pre-operational Automatic Depressurization System (ADS) Blowdown Test, listed in COL Condition 2.D.(2)(a)2 and described in UFSAR Subsections 14.2.5 and 14.2.9.1.3 as a first three plant only test. Specifically, the proposed change would revise the COL, License Condition 2.D.(2)(a)2, by removing the requirement to perform the ADS Blowdown first three plant test during preoperational testing.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the staff to complete its detailed technical reviews. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of the 10 CFR, an amendment to the license must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 52.79 of the 10 CFR addresses content of technical information required.
This section stipulates that the submittal addresses the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment, in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staffs ability to complete the detailed technical review are identified despite completion of an adequate
B. Whitley acceptance review. You will be advised of any further information needed to support the staffs detailed technical review by separate correspondence.
SNC has requested staff approval of this license amendment request by October 30, 2019. As we discussed the NRC staff intends to complete this action by October 30, 2019, unless we agree to a different date at a later time due to circumstances beyond our control. The staff estimates that it may take 360 hours15 days <br />2.143 weeks <br />0.493 months <br /> to complete this licensing action.
If you have any questions, please contact me at (301) 415-3025 or Chandu.Patel@nrc.gov.
Sincerely,
/RA/
Chandu Patel, Senior Project Manager Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Docket No(s): 52-025 52-026