Letter Sequence Acceptance Review |
---|
EPID:L-2021-LLA-0054, 3 to Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report (Approved, Closed) |
|
MONTHYEARNL-20-0173, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values2021-03-30030 March 2021 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values Project stage: Request ML21102A2222021-03-30030 March 2021 3 to Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report Project stage: Request ML21095A0872021-04-19019 April 2021 Non-Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values Project stage: Acceptance Review NL-21-0444, Supplement to License Amendment Request to Revise Technical Specification 3.3.5.2 Allowable Values2021-05-0606 May 2021 Supplement to License Amendment Request to Revise Technical Specification 3.3.5.2 Allowable Values Project stage: Supplement ML21131A2172021-05-11011 May 2021 NRR E-mail Capture - Acceptance Review - Vogtle TS 3.3.5, Loss of Power (LOP) Instrumentation, Surveillance Requirement (SR) 3.3.5.2, Allowable Values LAR (L-2021-LLA-0054) Project stage: Acceptance Review ML21314A1502021-12-0707 December 2021 Issuance of Amendment Nos. 210 and 193, Regarding Revision to Technical Specification 3.3.5, 4.16 (Kilovolt) Kv (Engineered Safety Feature) Esf Bus Loss of Power (LOP) Instrumentation (EPID L 2021-LLA-0054 Project stage: Approval 2021-04-19
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML23150A0802023-05-30030 May 2023 Acceptance Review - Vogtle Units 1 and 2 - Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML20290A2842022-08-0303 August 2022 Licensee Letter Subject: Finding That All Acceptance Criteria Are Met for Vogtle Electric Generating Plant, Unit 3 Combined License ML21095A0872021-04-19019 April 2021 Non-Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values ML20258A0272020-09-11011 September 2020 Acceptance Review - Hatch TSTF-582 LAR (EPID L-2020-LLA-0194) (e-mail) ML20258A1462020-09-0909 September 2020 E-Mail - Acceptance Review - Vogtle GSI-191 Exemption ML19319A0112019-09-11011 September 2019 Acceptance Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 19-014, Tornado Missile Protection for Main Steam Vent Stacks and Wall ML19220A9542019-08-0808 August 2019 LAR 19-013, Pressurizer Surge Line Stratification Evaluation ML19182A0142019-07-0303 July 2019 Acceptance Letter Vogtle 3 and 4 LAR 19-012 ML19142A1532019-05-21021 May 2019 Acceptance Review for TSTF-564 SLMCPR ML19135A1132019-05-15015 May 2019 Acceptance Letter for Vogtle Units 3 and 4, LAR 19-006, Crediting ADS Blowdown First Three Plant Test ML18323A1882018-11-19019 November 2018 NRC Acceptance Review for Hatch Unit 2 Relief Request HNP-ISI-RR-05-02 ML18262A2642018-09-18018 September 2018 Acceptance Review for Hatch 1 and 2 RHR Drywell Spray End State TS Change ML18205A4502018-07-24024 July 2018 NRC Acceptance Review for Hatch Request for Alternative HNP-ISI-ALT-05-04 ML18204A1482018-07-20020 July 2018 NRC Acceptance Review for Hatch LAR to Adopt 10 CFR 50.69 ML18156A4432018-06-0707 June 2018 Acceptance Letter for LAR 18-011 ESF Safeguard Actuation TS Applicability Changes ML18135A4092018-05-11011 May 2018 Acceptance for Review of Request for Alternative RR-V-12 Regarding Main Steam SRV Testing ML18102A0812018-04-11011 April 2018 Acceptance of License Amendment Request Regarding Degraded Voltage Protection ML18082B0942018-03-27027 March 2018 Acceptance Letter (LAR-17-043) Containment Pressure Analysis ML18052B0642018-02-26026 February 2018 Acceptance Letter for LAR 18-003 ML18025A7862018-01-31031 January 2018 Acceptance Letter for LAR 17-042 ML18019A3622018-01-25025 January 2018 (LAR 17-037) Acceptance Letter ML18022B1142018-01-22022 January 2018 Acceptance Letter (LAR 17-044) ML17319A8472017-11-21021 November 2017 Acceptance Review Letter, License Amendment Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML17166A4332017-06-26026 June 2017 Supplemental Information Needed for Acceptance of Systematic Risk-Informed Assessment of Debris Technical Report ML17033A0232017-02-14014 February 2017 Request for One-Time Exception to Nuclear Reactor Regulation Office Instructions LIC-109, LIC-101, and LIC-500 Acceptance Review Criteria ML16245A9142016-09-0101 September 2016 Acceptance Review - NSCW Transfer Pump Vogtle Unit 2 ML16224A1432016-08-23023 August 2016 Acceptance Review Regarding Reactor Vessel Threads in Flange Examination ML16204A0422016-07-26026 July 2016 Acceptance Letter, Unacceptable, with Opportunity to Supplement ML16109A2462016-05-11011 May 2016 Acceptance Review of Southern Nuclear Operating Company, Inc. License Amendment Request - Adoption of TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML15259A3292015-10-0101 October 2015 Acceptance Review ML15141A0562015-06-0404 June 2015 Acceptance Review ML15117A4762015-04-30030 April 2015 Acceptance Review Regarding License Amendment to Adopt TSTF-432-A, Rev. 1 ML15077A4092015-03-25025 March 2015 Acceptance Review License Amendment Request ML14343A7812015-01-0808 January 2015 Acceptance Review ML14288A4472014-11-0404 November 2014 Acceptance Review Regarding Proposed Inservice Inspection Alternative (FNP-ISI-ALT-17, Version 1) ML14265A2272014-10-24024 October 2014 Acceptance Review Regarding License Amendment to Revise Surveillance Requirement 3.3.2 and Technical Specification 5.6.5 ML13086A0852013-04-26026 April 2013 Acceptance Review Results Regarding Implementation of Risk-Informed Technical Specifications ML13022A1582013-01-24024 January 2013 Acceptance Review Concerning Voluntary Fire Protection Risk Initiative Request (TAC Nos. ME9741 and ME9742) (N-1-2-1893) ML12297A2632012-11-0707 November 2012 Acceptance Review ML12257A0982012-09-25025 September 2012 Acceptance Review - Unacceptable with Opportunity to Supplement (TAC ME9293 & ME9294) ML12115A0742012-04-20020 April 2012 NRR E-mail Capture - Acceptance Review for VEGP VEGP-ISI-ALT-07 ASME Code Case N-729-1, NL-12-0663 ML1200903082012-01-0404 January 2012 Email Acceptance Review for HNP-ISI-RR-12 ML12011A0682011-11-23023 November 2011 NRR E-mail Capture - Acceptance Review of Farley IST Program - Relief Request Proposed Alternative RR-P-3, Version 2 (ME7512 and ME7513) ML11102A0162011-04-12012 April 2011 E-Mail Acceptance Review for TSTF-361-A RHR Lop Testing (TAC ME5853/ME5854) ML1108800402011-03-28028 March 2011 Email Acceptance Review for License Application NL-11-0280 Steam Generator Water Level Hi-Hi Setpoint Change ML1102501572011-01-25025 January 2011 Acceptance of Farley Relief Request Dated January 5, 2011 ML1019302772010-07-19019 July 2010 Acceptance Review Regarding License Amendment Request for Technical Specification Table 3.3.1-1 ML1016504272010-06-14014 June 2010 E-mail - R. Martin to J. Stringfellow Regarding Acceptance of Application Dated May 12, 2010 ML1012000882010-04-30030 April 2010 Acceptance of Vogtle Relief Request (VEGP-ISI-ALT-03) Dated April 7, 2010 ML1007703322010-03-23023 March 2010 Results of Acceptance Review Regarding Request for Relief (TAC Nos. ME3327 and ME3328) 2023-05-30
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) ML23311A2452023-11-0707 November 2023 Pre-Submittal Meeting on November 7, 2023 - License Amendment Request to Revise the Ultimate Heat Sink Mission Time (Slides) ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request ML23240A0012023-08-30030 August 2023 Correction to Issuance of Amendment Nos. 241, 242, 243, and 244 ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) ML23093A0282023-08-0101 August 2023 Issuance of Amendments Nos. 220 and 203, Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23158A0182023-07-31031 July 2023 Issuance of Amendments Nos. 219 and 202, Regarding Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 ML23158A2082023-07-19019 July 2023 LAR-23-005 U/4 Amd 189 Timing of TS Effectiveness Prior to Initial Criticality Amendment ML23136B1542023-07-0303 July 2023 Issuance of Amendment Nos. 246 & 243, Regarding License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis ML23115A1492023-06-15015 June 2023 Issuance of Amendments No. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology ML23150A0802023-05-30030 May 2023 Acceptance Review - Vogtle Units 1 and 2 - Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23076A0502023-03-21021 March 2023 Correction of Amendment Nos. 244 and 241 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a License Controlled Document ML23054A4552023-03-16016 March 2023 Issuance of Amendment Nos. 245 and 242, Regarding LAR to Revise Technical Specification 3.4.10, Pressurizer Safety Valves, to Decrease Low Side Setpoint Tolerance LCO Value ML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML23048A0682023-03-0101 March 2023 Summary of February 13, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc. Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 ML23018A0042023-01-24024 January 2023 Correction of Amendment Nos. 319 and 264 Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF ML23013A2182023-01-13013 January 2023 Amendment No. 189 to License NPF-91 - Tech Spec Limiting Conditions for Operability Req for Auto Depressurization System Stage 4 Flow Paths Prior to Initial Criticality ML22297A1462022-12-22022 December 2022 Issuance of Amendments Nos. 319 and 264, Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITS ML22325A3472022-11-23023 November 2022 Correction of Amendment Nos. 318 and 263 Issuance of Amendment Nos. 318 and 263, Regarding LAR to Revise TSTF-227 and TSTF-297 ML22279A0122022-11-22022 November 2022 Attachment Amendment 187 U4 (LAR-22-003) ML22286A0742022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22308A0592022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22293A0302022-11-0707 November 2022 Amendments 318 & 263 Issuance, Regarding LAR to Adopt TSTF-227, Revision to EOC-RPT Pump Actions, and TSTF-297, ATWS-RPT (EPID L-2021-LLA- 0227) ML22263A2252022-11-0101 November 2022 Issuance of Amendment Nos. 243 and 240 to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure ML22192A1172022-09-0202 September 2022 Issuance of Amendments Nos. 317 & 262, Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-207-A, Completion Time for Restoration of Various Excessive Leakage Rates ML22192A1992022-08-19019 August 2022 Issuance of Amendments Nos. 316 and 261, Regarding Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22116A0842022-07-0505 July 2022 Issuance of Amendment Nos. 215 and 198, Regarding Revision to Technical Specification 3.7.2, Main Steam Isolation Valves (Msivs) ML22101A0942022-05-20020 May 2022 Issuance of Amendments Nos. 315 and 260, Regarding Request to Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML22060A1892022-03-15015 March 2022 Correction to TS Pg 3.6.6-4 During Issuance of Amendment Nos. 225 and 222 ML22032A2432022-03-0707 March 2022 Issuance of Amendment Nos. 241 and 238 to Eliminate the Encapsulation Vessels Around the First Containment Spray and Residual Heat Removal / Low Head Safety Injection Recirculation Suction Isolation Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21344A0032022-01-26026 January 2022 Issuance of Amendments Regarding Revision to Use Beacon Power Distribution Monitoring System ML22004A1322022-01-24024 January 2022 Correction of Amendment Nos. 227 and 224 Issuance of Amendments Regarding Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition (EPID L-2019-LLA-027 ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21314A1502021-12-0707 December 2021 Issuance of Amendment Nos. 210 and 193, Regarding Revision to Technical Specification 3.3.5, 4.16 (Kilovolt) Kv (Engineered Safety Feature) Esf Bus Loss of Power (LOP) Instrumentation (EPID L 2021-LLA-0054 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21264A6442021-09-24024 September 2021 Issuance of Amendment to Revise Technical Specification 3.7.2, Plant Service Water (Psw) System and Ultimate Heat Sink (UHS) (EPID L-2021-LLA-0164) (Emergency Circumstances) ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions 2024-01-30
[Table view] |
Text
April 19, 2021 Ms. Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
3535 Colonnade Parkway Birmingham, AL 35243
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 -
SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 3.3.5.2 ALLOWABLE VALUES (EPID NO. L-2021-LLA-0054)
Dear Ms. Gayheart:
By letter dated March 30, 2021 (Agencywide Documents and Access Management System Accession No. ML21089A388), Southern Nuclear Operating Company, Inc. (SNC, the licensee) submitted a license amendment request (LAR) for the Vogtle Electric Generating Plant, Units 1 and 2 (Vogtle). The proposed LAR would revise Technical Specification (TS) 3.3.5, Loss of Power (LOP) Instrumentation, Surveillance Requirement (SR) 3.3.5.2 Allowable Values. The proposed amendment would modify the allowable value (AV) for the loss of voltage (LOV) and degraded voltage (DV) relays.
Specifically, SNC proposes to change the CHANNEL CALIBRATION with setpoint Allowable Value for SR 3.3.5.2 A and B as below:
Existing AV Proposed AV SR 3.3.5.2.A (Loss of Voltage) 2912 Volts (V) 2958.2 V SR 3.3.5.2.B (Degraded Voltage) 3683 V 3729.2 V The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) or construction permit must fully describe the changes requested, and follow the form prescribed for original applications as applicable. Section 50.34 of 10 CFR addresses the content of technical
C. Gayheart information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has completed the acceptance review of the LAR in accordance with Office of Nuclear Reactor Regulation (NRR) Office Instruction LIC-109, Revision 2, Acceptance Review Procedures, dated January 16, 2017 (ADAMS Accession No. ML16144A521), and determined that additional information is needed for the NRC to begin its detailed technical review.
Specifically, the proposed LAR does not contain sufficient information for the NRC staff to verify that the proposed LOV and DV relay AVs and their associated time delays are adequate to assure that required protective actions will be initiated before the associated plant process parameter exceeds its analytical limit.
As such, the NRC staff does not have the sufficient technical information to complete its detailed review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements for the protection of public health and safety and the environment. The information needed by the NRC staff was conveyed to SNC via email dated April 8, 2021, during a call on April 19, 2021, and is being followed by this letter.
The NRC staff identified that the following information is needed, within 13 working days from the date of this letter, to begin its detailed technical review:
The as-found tolerance (AFT) and as-left tolerance (ALT) values of the nominal trip setpoint (NTS) calibrations.
The potential transformer ratio (for voltage conversion from the transformers primary winding to secondary winding).
Verification of (a) the current Analytical Limits (ALs) of the 4.16 kV Engineered Safety Features (ESF) Bus LOP Instrumentation are 2912 V (Loss of Voltage) and 3683 V (Degraded Voltage), and (b) these ALs are not changed in the calculation.
The NRC staff identified the following information as a request of additional information (RAI) which should be provided with the supplemental information requested for acceptance. If this information cannot be provided, please provide a date when it will be available:
The full model numbers and the vendor (ABB) datasheets of the affected relays, including the relays applicable pickup and dropout voltages and performance tolerances. Also, discuss whether a harmonic filter will be used, which could affect the repeatability versus temperature range uncertainty.
The full model numbers and the vendor datasheets of the voltage-to-current module and the analog-to-digital module, including the uncertainty values of these devices.
The NRC staff needs the above information to begin its detailed technical review and perform an independent verification of the allowable values for the LOV and DV relays trip setpoints.
In order to make the application complete, the NRC staff requests that SNC supplement the application to address the information requested above within working 13 days of the date of this letter.
C. Gayheart If the information responsive to the NRC staffs request is not received within 13 working days of the date of this letter, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC will cease its activities associated with the application under EPID No. L-2021-LLA-0054. If the application is subsequently accepted for review, you will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415-3100 or via email at John.Lamb@nrc.gov.
Sincerely,
/RA/
John G. Lamb, Sr. Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425 cc: Listserv
ML21095A087 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DEX/EICB/BC NRR/DEX/D NAME JLamb KGoldstein MWaters EBenner DATE 04/05/2021 04/06/2021 04/07/2021 04/07/2021 OFFICE NRR/DORL/LPL2-1/BC NRR/DORL/DD NRR/DORL/LPL2-1/PM NAME MMarkley CCarusone JLamb DATE 04/08/2021 04/12/2021 04/19/2021