Issuance of Amendments Regarding the Adoption of TSTF-547, Revision 1, Clarification of Rod Position Requirements
ML17214A546
Person / Time
Site: Vogtle, Farley  Southern Nuclear icon.png
Issue date: 10/02/2017
From: Shawn Williams
Plant Licensing Branch II
To: Hutto J
Southern Nuclear Operating Co
Williams S, NRR/DORL/LPLII-1, 415-1009
References
CAC MF8870, CAC MF8871, CAC MF8872, CAC MF8873
Download: ML17214A546 (56)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. James J. Hutto Regulatory Affairs Director October 2, 2017 Southern Nuclear Operating Company, Inc.

P.O. Box 1295 /Bin - 038 Birmingham, AL 35201-1295

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2; VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS REGARDING THE ADOPTION OF TSTF-547, REVISION 1, "CLARIFICATION OF ROD POSITION REQUIREMENTS" (CAC NOS. MF8870, MF8871, MF8872, AND MF8873)

Dear Mr. Hutto:

The U.S. Nuclear Regulatory Commission (NRC or the Commission) has issued the enclosed Amendment No. 214 to the Joseph M. Farley Nuclear Plant (FNP), Unit 1, Renewed Facility Operating License No. NPF-2; Amendment No. 211 to FNP, Unit 2, Renewed Facility Operating License No. NPF-8; Amendment No. 193 to the Vogtle Electric Generating Plant (VEGP),

Unit 1, Renewed Facility Operating License No. NPF-68; and Amendment No. 176 to VEGP, Unit 2, Renewed Facility Operating License No. NPF-81.

The amendments are in response to your application dated November 21, 2016. The amendments revise the requirements on control and shutdown rods, and rod and bank position indication in Technical Specifications (TS) 3.1.4, "Rod Group Alignment Limits," TS 3.1.5, "Shutdown Bank Insertion Limits," TS 3.1.6, "Control Bank Insertion Limits," and TS 3.1.7, "Rod Position Indication" in accordance with NRG-approved Technical Specification Task Force Traveler (TSTF)-547, Revision 1, "Clarification of Rod Position Requirements," dated March 4, 2016 (Agencywide Documents Access and Management System Accession Package No. ML16012A126), with editorial variations from the Traveler.

A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Docket Nos.: 50-348, 50-364 50-424, 50-425

Enclosures:

1. Amendment No. 214 to NPF-2
2. Amendment No. 211 to NPF-8
3. Amendment No. 193 to NPF-68
4. Amendment No. 176 to NPF-81
5. Safety Evaluation cc w/enclosures: Distribution via Listserv Sincerely, Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SOUTHERN NUCLEAR OPERATING COMPANY ALABAMA POWER COMPANY DOCKET NO. 50-348 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 214 Renewed License No. NPF-2

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Joseph M. Farley Nuclear Plant, Unit 1 (the facility), Renewed Facility Operating License No. NPF-2, filed by Southern Nuclear Operating Company (the licensee), dated November 21, 2016, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 1 O CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-2 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 214, are hereby incorporated in the renewed license.

Southern Nuclear shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.

Attachment:

FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Changes to the Renewed Operating License and Technical Specifications Date of Issuance: October 2, 2O1 7

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SOUTHERN NUCLEAR OPERATING COMPANY ALABAMA POWER COMPANY DOCKET NO. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 211 Renewed License No. NPF-8

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Joseph M. Farley Nuclear Plant, Unit 2 (the facility), Renewed Facility Operating License No. NPF-8, filed by Southern Nuclear Operating Company (the licensee), dated November 21, 2016, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 1 O CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-8 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 211, are hereby incorporated in the renewed license.

Southern Nuclear shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.

Attachment:

FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Changes to the Renewed Operating License and Technical Specifications Date of Issuance: October 2, 201 7

ATTACHMENT TO LICENSE AMENDMENT NOS. 214 AND 211 JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 RENEWED FACILITY OPERATING LICENSE NOS. NPF-2 AND NPF-8 DOCKET NOS. 50-348 AND 50-364 Replace the following pages of the Licenses and the Appendix "A" Technical Specifications (TSs) with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Pages License License No. NPF-2, page 4 License No. NPF-8, page 3 TSs 3.1.4-1 3.1.4-2 3.1.4-3 3.1.5-1 3.1.5-2 3.1.6-1 3.1.6-2 3.1.6-3 3.1.7-1 3.1.7-2 3.1.7-3 3.1.7-4 Insert Pages License License No. NPF-2, page 4 License No. NPF-8, page 3 TSs 3.1.4-1 3.1.4-2 3.1.4-3 3.1.5-1 3.1.5-2 3.1.6-1 3.1.6-2 3.1.6-3 3.1.7-1 3.1.7-2 3.1.7-3 3.1.7-4

Farley - Unit 1 (2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 214, are hereby incorporated in the renewed license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications.

(3)

Additional Conditions The matters specified in the following conditions shall be completed to the satisfaction of the Commission within the stated time periods following the issuance of the renewed license or within the operational restrictions indicated. The removal of these conditions shall be made by an amendment to the renewed license supported by a favorable evaluation by the Commission.

a.

Southern Nuclear shall not operate the reactor in Operational Modes 1 and 2 with less than three reactor coolant pumps in operation.

b.

Deleted per Amendment 13

c.

Deleted per Amendment 2

d.

Deleted per Amendment 2

e.

Deleted per Amendment 152 Deleted per Amendment 2

f.

Deleted per Amendment 158

g.

Southern Nuclear shall maintain a secondary water chemistry monitoring program to inhibit steam generator tube degradation.

This program shall include:

1)
2)
3)
4)
5)

Identification of a sampling schedule for the critical parameters and control points for these parameters; Identification of the procedures used to quantify parameters that are critical to control points; Identification of process sampling points; A procedure for the recording and management of data; Procedures defining corrective actions for off control point chemistry conditions; and Renewed License No. NPF-2 Amendment No. 214 (2)

Alabama Power Company, pursuant to Section 103 of the Act and 1 O CFR Part 50, "Licensing of Production and Utilization Facilities," to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.

(3)

Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4)

Southern Nuclear, pursuant to the Act and 1 O CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)

Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6)

Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2775 megawatts thermal.

(2)

Technical Specifications (3)

(4)

(5)

Farley - Unit 2 The Technical Specifications contained in Appendix A, as revised through Amendment No. 211 are hereby incorporated in the renewed license.

Southern Nuclear shall operate the facility in accordance with the Technical Specifications.

Deleted per Amendment 144 Deleted per Amendment 149 Deleted per Amendment 144 Renewed License No. NPF-8 Amendment No. 211

3.1 REACTIVITY CONTROL SYSTEMS 3.1.4 Rod Group Alignment Limits Rod Group Alignment Limits 3.1.4 LCO 3.1.4 All shutdown and control rods shall be OPERABLE, with all individual indicated rod positions within 12 steps of their group step counter demand position.

APPLICABILITY:

MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more rod(s)

A.1.1 untrippable.

OR A.1.2 AND A.2 B.

One rod not within B.1.1 alignment limits.

OR B.1.2 AND Farley Units 1 and 2 Verify SOM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the limits provided in the COLR.

Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SOM to within limit.

Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Verify SOM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the limits provided in the COLR.

Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SOM to within limit.

(continued) 3.1.4-1 Amendment No. 214 (Unit 1)

Amendment No. 211 (Unit 2)

ACTIONS CONDITION B.

(continued)

B.2 AND B.3 AND B.4 AND B.5 C.

Required Action and C.1 associated Completion Time of Condition B not met.

Farley Units 1 and 2 Rod Group Alignment Limits 3.1.4 REQUIRED ACTION COMPLETION TIME Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> POWER to s 75% RTP.

Verify SDM to be within Once per the limits provided in the 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> COLR.

Perform SR 3.2.1.1, SR 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 3.2.1.2, and SR 3.2.2.1.

Re-evaluate safety 5 days analyses and confirm results remain valid for duration of operation under these conditions.

Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3.1.4-2 Amendment No. 214 (Unit 1)

Amendment No. 211 (Unit 2)

ACTIONS Rod Group Alignment Limits 3.1.4 CONDITION REQUIRED ACTION COMPLETION TIME D.

More than one rod not within alignment limit.

D.1.1 Verify SOM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the limits provided in the COLR.

D.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore required SDM to within limit.

D.2 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> SURVEILLANCE REQUIREMENTS SR 3.1.4.1 SR 3.1.4.2 SR 3.1.4.3 SURVEILLANCE


N 0 TE--------------------------------

N ot required to be performed for rods associated with inoperable rod position indicator or demand position indicator Verify position of individual rods within alignment limit.

Verify rod freedom of movement (trippability) by moving each rod not fully inserted in the core

~ 10 steps in either direction.

Verify rod drop time of each rod, from the fully withdrawn position, is :s;; 2.7 seconds from the beginning of decay of stationary gripper coil voltage to dashpot entry, with:

a.

Tavg ~ 541°F; and

b.

All reactor coolant pumps operating.

FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Prior to reactor criticality after each removal of the reactor head Farley Units 1 and 2 3.1.4-3 Amendment No. 214 (Unit 1)

Amendment No. 211 (Unit 2)

3.1 REACTIVITY CONTROL SYSTEMS 3.1.5 Shutdown Bank Insertion Limits Shutdown Bank Insertion Limits 3.1.5 LCO 3.1.5 Each shutdown bank shall be within insertion limits specified in the COLR.


N 0 TE-----------------------------------------------

N ot applicable to shutdown banks inserted while performing SR 3.1.4.2.

APPLICABILITY:

MODE 1, MODE 2 with any control bank not fully inserted.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One shutdown bank A.1.

Verify all control banks are within the insertion limits specified in the COLR.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inserted ::;; 16 steps beyond the insertion limits specified in the COLR.

Farley Units 1 and 2 A.2.1 Verify SOM is within the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> limits specified in the A.2.2 A.3 COLR Initiate boration to restore SOM to within limit.

Restore the shutdown banks to within the insertion limits specified in the COLR.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 24 hours 3.1.5-1 Amendment No. 214 (Unit 1)

Amendment No. 211 (Unit 2)

ACTIONS CONDITION B.

One or more shutdown banks not within limits for reasons other than Condition A.

C.

Required Action and associated Completion Time not met.

SURVEILLANCE REQUIREMENTS Shutdown Bank Insertion Limits 3.1.5 REQUIRED ACTION COMPLETION TIME B.1.1 Verify SOM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the limits provided in the COLR.

OR B.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SOM to within limit.

AND B.2 Restore shutdown 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> banks to within limits C.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify each shutdown bank is within the limits specified in the COLR.

Farley Units 1 and 2 3.1.5-2 In accordance with the Surveillance Frequency Control Program Amendment No. 214 (Unit 1)

Amendment No. 211 (Unit 2)

3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Control Bank Insertion Limits Control Bank Insertion Limits 3.1.6 LCO 3.1.6 Control banks shall be within the insertion, sequence, and overlap limits specified in the COLR.


N 0 TE-----------------------------------------------

N ot applicable to control banks inserted while performing SR 3.1.4.2.

APPLICABILITY:

MODE 1, MODE 2 with kett z 1.0.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Control bank A, B, or C A.1.1 Verify all shutdown 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inserted s; 16 steps beyond the insertion, sequence, or overlap limits specified in the COLR.

Farley Units 1 and 2 banks are within the insertion limits specified in the COLR.

A.2.1 Verify SOM is within the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> limits specified in the A.2.2 A.3 COLR.

Initiate boration to restore SOM to within limit.

Restore the control bank to within the insertion, sequence, and limits specified in the COLR.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 24 hours 3.1.6-1 Amendment No. 214 (Unit 1)

Amendment No. 211 (Unit 2)

ACTIONS CONDITION B.

Control bank insertion limits not met for reasons other than Condition A.

C.

Control bank sequence or overlap limits not met for reasons other than Condition A.

D.

Required Action and associated Completion Time not met.

Farley Units 1 and 2 Control Bank Insertion Limits 3.1.6 REQUIRED ACTION COMPLETION TIME B.1.1 OR B.1.2 AND B.2 C.1.1 OR C.1.2 AND C.2 D.1 Verify SOM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the limits provided in the COLR.

Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SOM to within limit.

Restore control bank(s) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to within limits Verify SOM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the limits provided in the COLR.

Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SOM to within limit.

Restore control bank 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> sequence and overlap to within limits.

Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3.1.6-2 Amendment No. 214 (Unit 1)

Amendment No. 211 (Unit 2)

Control Bank Insertion Limits 3.1.6 SURVEILLANCE REQUIREMENTS SR 3.1.6.1 SR 3.1.6.2 SR 3.1.6.3 SURVEILLANCE Verify estimated critical control bank position is within the limits specified in the COLR.

Verify each control bank insertion is within the limits specified in the COLR.

Verify sequence and overlap limits specified in the COLR are met for control banks not fully withdrawn from the core.

FREQUENCY Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to achieving criticality In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Farley Units 1 and 2 3.1.6-3 Amendment No. 214 (Unit 1)

Amendment No. 211 (Unit 2)

3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Rod Position Indication Rod Position Indication 3.1.7 LCO 3.1.7 The Digital Rod Position Indication (DRPI) System and the Demand Position Indication System shall be OPERABLE.

APPLICABILITY:

MODES 1 and 2.

ACTIONS


N 0 TE-----------------------------------------------------------

S e pa rate Condition entry is allowed for each inoperable DRPI and each demand position indicator.

CONDITION A.

One DRPI per group inoperable in one or more groups.

Farley Units 1 and 2 A.1 OR A.2.1 REQUIRED ACTION COMPLETION TIME Verify the position of the Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> rod with inoperable DRPI indirectly by using movable incore detectors.

Verify the position of the rod with inoperable DRPI indirectly by using movable incore detectors.

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> AND Once per 31 EFPD thereafter AND 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after discovery of each unintended rod movement (continued) 3.1.7-1 Amendment No. 214 (Unit 1)

Amendment No. 211 (Unit 2)

ACTIONS CONDITION A.

(continued)

A.2.2 OR A.3

8.

More than one DRPI 8.1 group inoperable in one or more groups.

AND 8.2 Farley Units 1 and 2 REQUIRED ACTION Restore inoperable DRPI to OPERABLE status.

Reduce THERMAL POWER to s 50% RTP Place the control rods under manual control.

Restore the inoperable DRPls to OPERBLE status such that a maximum of one DRPI per group is inoperable.

Rod Position Indication 3.1.7 COMPLETION TIME 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after each movement of rod with inoperable DRPI

> 12 steps AND Prior to THERMAL POWER exceeding 50% RTP AND 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after reaching RTP Prior to entering MODE 2 from MODE 3

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Immediately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 3.1.7-2 Amendment No. 214 (Unit 1)

Amendment No. 211 (Unit 2)

ACTIONS CONDITION C.

One or more DRPI inoperable in one or more groups and associated rod has been moved ~ 24 steps in one direction since the last determination of the rod's position.

D.

One or more demand position indicators per bank inoperable in one or more banks.

E.

Required Action and associated Completion Time not met.

Farley Units 1 and 2 Rod Position Indication 3.1.7 REQUIRED ACTION COMPLETION TIME C.1.1 AND C.1.2 OR C.2 D.1.1 AND D.1.2 OR D.2 E.1 Initiate action to verify the Immediately position of the rods with inoperable DRPls indirectly by using movable incore detectors.

Complete rod position 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> verification started in Required Action C.1.1.

Reduce THERMAL 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> POWER to s 50% RTP.

Verify by administrative Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> means all DRPls for the affected banks are OPERABLE.

Verify the most withdrawn rod and the least Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> withdrawn rod of the affected banks are s 12 steps apart.

Reduce THERMAL 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> POWER to s 50% RTP.

Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3.1.7-3 Amendment No. 214 (Unit 1)

Amendment No. 211 (Unit 2)

SURVEILLANCE REQUIREMENTS SR 3.1.7.1 SURVEILLANCE


N()TE----------------------------

Not required to be met for DRPls associated with rods that do not meet LC() 3.1.4.

Verify each DRPI agrees within 12 steps of the group demand position for the full indicated range of rod travel.

Rod Position Indication 3.1.7 FREQUENCY

()nee prior to criticality after each removal of the reactor head.

Farley Units 1 and 2 3.1.7-4 Amendment No. 214 (Unit 1)

Amendment No. 211 (Unit 2)

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SOUTHERN NUCLEAR OPERATING COMPANY, INC.

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-424 VOGTLE ELECTRIC GENERATING PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 193 Renewed License No. NPF-68

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Vogtle Electric Generating Plant, Unit 1 (the facility), Renewed Facility Operating License No. NPF-68, filed by the Southern Nuclear Operating Company, Inc. {the licensee), acting for itself; Georgia Power Company; Oglethorpe Power Corporation; Municipal Electric Authority of Georgia; and City of Dalton, Georgia (the owners), dated November 21, 2016, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 1 O CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 1 O CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-68 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 193, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.

Attachment:

FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Changes to the Renewed Operating License and Technical Specifications Date of Issuance:

October 2, 2O1 7

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SOUTHERN NUCLEAR OPERATING COMPANY, INC.

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-425 VOGTLE ELECTRIC GENERATING PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 176 Renewed License No. NPF-81

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Vogtle Electric Generating Plant, Unit 2 (the facility), Renewed Facility Operating License No. NPF-81, filed by the Southern Nuclear Operating Company, Inc. (the licensee), acting for itself; Georgia Power Company; Oglethorpe Power Corporation; Municipal Electric Authority of Georgia; and City of Dalton, Georgia (the owners), dated November 21, 2016, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 1 O CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-81 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 176, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.

Attachment:

FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Changes to the Renewed Operating License and Technical Specifications Date of Issuance: October 2, 2O1 7

ATTACHMENT TO LICENSE AMENDMENT NOS. 193 AND 176 VOGTLE ELECTRIC GENERATING PLANT, UNITS 1AND2 RENEWED FACILITY OPERATING LICENSE NOS. NPF-68 AND NPF-81 DOCKET NOS. 50-424 AND 50-425 Replace the following pages of the Licenses and the Appendix A Technical Specifications (TSs) with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Pages License License No. NPF-68, page 4 License No. NPF-81, page 3 TSs 3.1.4-2 3.1.4-3 3.1.5-1 3.1.5-2 3.1.6-1 3.1.6-2 3.1.6-3 3.1.7-1 3.1.7-2 3.1.7-3 Insert Pages License License No. NPF-68, page 4 License No. NPF-81, page 3 TSs 3.1.4-2 3.1.4-3 3.1.5-1 3.1.5-2 3.1.6-1 3.1.6-2 3.1.6-3 3.1.7-1 3.1.7-2 3.1.7-3 3.1.7-4 (1)

Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 3625.6 megawatts thermal (100 percent power) in accordance with the conditions specified herein.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 193, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

Southern Nuclear Operating Company shall be capable of establishing containment hydrogen monitoring within 90 minutes of initiating safety injection following a loss of coolant accident.

(4)

(5)

(6)

(7)

(8)

(9)

(10)

Deleted Deleted Deleted Deleted Deleted Deleted Mitigation Strategy: License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a)

Fire fighting response strategy with the following elements:

1.

Pre-defined coordinated fire response strategy and guidance

2.

Assessment of mutual aid fire fighting assets

3.

Designated staging areas for equipment and materials

4.

Command and control

5.

Training and response personnel (b)

Operations to mitigate fuel damage considering the following:

1.

Protection and use of personnel assets

2.

Communications

3.

Minimizing fire spread

4.

Procedures for Implementing integrated fire response strategy

5.

Identification of readily-available pre-staged equipment

6.

Training on integrated fire response strategy Renewed Operating License NPF-68 Amendment No. 193 (2)

Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia, pursuant to the Act and 1 O CFR Part 50, to possess but not operate the facility at the designated location in Burke County, Georgia, in accordance with the procedures and limitations set forth in this license; (3)

Southern Nuclear, pursuant to the Act and 1 O CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4)

Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)

Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6)

Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as my be produced by the operation of the facility authorized herein.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter 1 and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below.

(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 3625.6 megawatts thermal (100 percent power) in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 176 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

The Surveillance requirements (SRs) contained in the Appendix A Technical Specifications and listed below are not required to be performed immediately upon implementation of Amendment No. 74. The SRs listed below shall be Renewed Operating License NPF-81 Amendment No. 176

ACTIONS CONDITION B.

(continued)

B.1.2 AND B.2 AND B.3 AND B.4 AND B.5 Vogtle Units 1 and 2 REQUIRED ACTION Rod Group Alignment Limits 3.1.4 COMPLETION TIME Initiate boration to restore 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SDM to within limit.

Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> POWER to:::: 75% RTP.

Verify SDM is 2 the limit Once per specified in the COLR.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Perform SR 3.2.1.1, SR 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 3.2.1.2, and SR 3.2.2.1.

Reevaluate safety 5 days analyses and confirm results remain valid for duration of operation under these conditions.

(continued) 3.1.4-2 Amendment No. 193 (Unit 1)

Amendment No. 176 (Unit 2)

Rod Group Alignment Limits 3.1.4 ACTIONS (continued)

CONDITION REQUIRED ACTION C.

Required Action and C.1 Be in MODE 3 associated Completion Time of Condition B not met.

D.

More than one rod not D.1.1 Verify SOM is 2 the limit within alignment limit.

specified in the COLR.

OR D.1.2 Initiate boration to restore required SOM to within limit.

AND D.2 Be in MODE 3.

SURVEILLANCE REQUIREMENTS SR 3.1.4.1 SURVEILLANCE


N 0 TE------------------------------

N ot required to be performed for rods associated with inoperable rod position indicator or demand position indicator.

Verify position of individual rods within alignment limit.

COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 1 hour 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 6 hours FREQUENCY In accordance with the Surveillance Frequency Control Program (continued)

Vogtle Units 1 and 2 3.1.4-3 Amendment No. 193 (Unit 1)

Amendment No. 176 (Unit 2)

3.1 REACTIVITY CONTROL SYSTEMS 3.1.5 Shutdown Bank Insertion Limits Shutdown Bank Insertion Limits 3.1.5 LCO 3.1.5 Each shutdown bank shall be within insertion limits specified in the COLR.


N 0 TE-----------------------------------------------

N ot applicable to shutdown banks inserted while performing SR 3.1.4.2.

APPLICABILITY:

MODES 1 and 2 ACTIONS CONDITION A.

One shutdown bank inserted s 16 steps beyond the insertion limits specified in the COLR.

Vogtle Units 1 and 2 A.1 AND A.2.1 REQUIRED ACTION Verify all control banks are within the insertion limits specified in the COLR.

Verify SOM is within the limits specified in the COLR.

COMPLETION TIME 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1 hour A.2.2 Initiate boration to restore 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SOM to within limit.

AND A.3 Restore the shutdown banks to within the insertion limits specified in the COLR.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (continued) 3.1.5-1 Amendment No. 193 (Unit 1)

Amendment No. 176 (Unit 2)

ACTIONS (continued)

CONDITION B.

One or more shutdown B.1.1 banks not within limits for reasons other than Condition A.

Shutdown Bank Insertion Limits 3.1.5 REQUIRED ACTION COMPLETION TIME Verify SOM is ~ the limit 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> specified in the COLR.

OR B.1.2 Initiate boration to restore 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SOM to within limit.

AND B.2 Restore shutdown banks to within limits.

C.

Required Action and C.1 Be in MODE 3.

associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SR 3.1.5.1 SURVEILLANCE Verify each shutdown bank is within the insertion limits specified in the COLR.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 6 hours FREQUENCY In accordance with the Surveillance Frequency Control Program Vogtle Units 1 and 2 3.1.5-2 Amendment No. 193 (Unit 1)

Amendment No. 176 (Unit 2)

3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Control Bank Insertion Limits Control Bank Insertion Limits 3.1.6 LCO 3.1.6 Control banks shall be within the insertion, sequence, and overlap limits specified in the COLR.


N 0 TE--------------------------------------------

N ot applicable to control banks inserted while performing SR 3.1.4.2.

APPLICABILITY:

MODE 1, MODE 2 with kett;::: 1.0.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Control bank A, B, or C A.1.1 inserted s 16 steps beyond the insertion, sequence, or overlap limits specified in the COLR.

AND A.2.1 OR A.2.2 AND A.3 Vogtle Units 1 and 2 Verify all shutdown 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> banks are within the insertion limits specified in the COLR.

Verify SDM is within the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> limits specified in the COLR.

Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

Restore the control bank 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to within the insertion, sequence, and limits specified in the COLR.

(continued) 3.1.6-1 Amendment No. 193 (Unit 1)

Amendment No. 176 (Unit 2)

ACTIONS (continued)

CONDITION B.

Control bank insertion limits not met for reasons other than Condition A.

C.

Control bank sequence or overlap limits not met for reasons other than Condition A.

D.

Required Action and associated Completion Time not met.

Vogtle Units 1 and 2 Control Bank Insertion Limits 3.1.6 REQUIRED ACTION COMPLETION TIME B.1.1 OR B.1.2 AND B.2 C.1.1 OR C.1.2 AND C.2 D.1 Verify SDM is 2 the limit 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> specified in the COLR.

Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

Restore control bank(s) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to within limits.

Verify SDM is 2 the limit 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> specified in the COLR.

Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

Restore control bank 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> sequence and overlap to within limits.

Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3.1.6-2 Amendment No. 193 (Unit 1)

Amendment No. 176 (Unit 2)

Control Bank Insertion Limits 3.1.6 SURVEILLANCE REQUIREMENTS SR 3.1.6.1 SR 3.1.6.2 SR 3.1.6.3 SURVEILLANCE Verify estimated critical control bank position is within the limits specified in the COLR.

Verify each control bank insertion is within the limits specified in the COLR.

Verify sequence and overlap limits specified in the COLR are met for control banks not fully withdrawn from the core.

FREQUENCY Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to achieving criticality In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Vogtle Units 1 and 2 3.1.6-3 Amendment No. 193 (Unit 1)

Amendment No. 176 (Unit 2)

3.1 REACTIVITY CONTROL SYSTEMS 3.1. 7 Rod Position Indication Rod Position Indication 3.1.7 LCO 3.1. 7 The Digital Rod Position Indication (DRPI) System and the Demand Position Indication System shall be OPERABLE.

APPLICABILITY:

MODES 1 and 2.

ACTIONS


NOTE-----------------------------------------------------------

Separate Condition entry is allowed for each inoperable DRPI and each inoperable demand position indicator.

CONDITION A.

One DRPI per group inoperable in one or more groups.

Vogtle Units 1 and 2 A.1 A.2.1 REQUIRED ACTION COMPLETION TIME Verify the position of the Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> rod with inoperable DRPI indirectly by using movable incore detectors.

Verify the position of the rod with inoperable DRPI indirectly by using movable incore detectors.

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> AND Once per 31 EFPD thereafter AND 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after discovery of each unintended rod movement (continued) 3.1.7-1 Amendment No. 193 (Unit 1)

Amendment No. 176 (Unit 2)

ACTIONS CONDITION A.

(continued)

A.2.2 OR A.3 B.

More than one DRPI per B.1 group inoperable in one or more groups.

AND B.2 Vogtle Units 1 and 2 REQUIRED ACTION Restore inoperable DRPI to OPERABLE status.

Reduce THERMAL POWER to ::;; 50% RTP.

Place the control rods under manual control.

Restore inoperable DRPls to OPERABLE status such that a maximum of one DRPI per group is inoperable.

Rod Position Indication 3.1.7 COMPLETION TIME 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after each movement of rod with inoperable DRPI

> 12 steps AND Prior to THERMAL POWER exceeding 50% RTP AND 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after reaching RTP Prior to entering MODE 2 from MODE 3

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Immediately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (continued) 3.1.7-2 Amendment No. 193 (Unit 1)

Amendment No. 176 (Unit 2)

ACTIONS (continued)

CONDITION C.

One or more DRPI inoperable in one or more groups and associated rod has been moved ;:: 24 steps in one direction since the last determination of the rod's position.

D.

One or more demand position indicators per bank inoperable in one or more banks.

E.

Required Action and associated Completion Time not met.

Vogtle Units 1 and 2 Rod Position Indication 3.1.7 REQUIRED ACTION COMPLETION TIME C.1 OR C.2 D.1.1 AND D.1.2 OR D.2 E.1 Verify the position of the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> rods with inoperable DRPls by using movable incore detectors.

Reduce THERMAL 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> POWER to::; 50% RTP.

Verify by administrative Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> means all DRPls for the affected banks are OPERABLE.

Verify the most withdrawn rod and the least Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> withdrawn rod of the affected banks are

12 steps apart.

Reduce THERMAL 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> POWER to::; 50% RTP.

Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3.1.7-3 Amendment No. 193 (Unit 1)

Amendment No. 176 (Unit 2)

SURVEILLANCE REQUIREMENTS SR 3.1.7.1 SURVEILLANCE


N 0 TE------------------------------

N ot required to be met for DRPls associated with rods that do not meet LCO 3.1.4.

Verify each DRPI agrees within 12 steps of the group demand position for the full indicated range of rod travel.

Rod Position Indication 3.1.7 FREQUENCY In accordance with the Surveillance Frequency Control Program Vogtle Units 1 and 2 3.1.7-4 Amendment No. 193 (Unit 1)

Amendment No. 176 (Unit 2)

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO TRAVELER TSTF-547, REVISION 1. "CLARIFICATION OF ROD POSITON REQUIREMENTS" FOR JOSEPH M. FARLEY NUCLEAR PLANT. UNITS 1 AND 2 AMENDMENT NO. 214 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-2 AMENDMENT NO. 211 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-8 AND VOGTLE ELECTRIC GENERATING PLANT. UNITS 1AND2 AMENDMENT NO. 193 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-68 AMENDMENT NO. 176 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-81 SOUTHERN NUCLEAR OPERATING COMPANY, INC.

DOCKET NOS. 50-348. 50-364, 50-424. AND 50-425

1.0 INTRODUCTION

By application dated November 21, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16326A256), Southern Nuclear Operating Company (SNC, the licensee) requested changes to the technical specifications (TSs) in the Renewed Facility Operating Licenses for the Joseph M. Farley Nuclear Plant (FNP), Units 1 and 2, and Vogtle Electric Generating Plant (VEGP), Units 1 and 2.

The changes revise the Technical Specifications (TS) to provide time to correct rod movement failures that do not affect operability, and provide an alternative to frequent verification of rod position using the movable incore detectors. The changes align requirements of TS 3.1.4, "Rod Group Alignment Limits," and TS 3.1. 7, "Rod Position Indication," eliminate an unnecessary Required Action (RA) from TS 3.1.7, and make some editorial improvements to TSs 3.1.4, 3.1.5, "Shutdown Bank Insertion Limits," 3.1.6, "Control Bank Insertion Limits," and 3.1.7. The changes are in accordance with Nuclear Regulatory Commission (NRC) approved Technical Specification Task Force Traveler (TSTF)-547, Revision 1, "Clarification of Rod Position Requirements" dated March 4, 2016 (ADAMS Accession Package No. ML16012A126). Variations are editorial in nature and discussed in this safety evaluation (SE).

2.0 REGULATORY EVALUATION

2.1 Description of Rod Cluster Control Assemblies The rod cluster control assemblies (RCCA), or rods, are moved by their control rod drive mechanisms (CROM). Each CROM moves its RCCA one step (approximately 5/8 inch) at a time, but at varying rates (steps per minute) depending on the signal output from the Rod Control System. The RCCAs are divided among control banks and shutdown banks. Each bank may be further subdivided into two groups to provide for precise reactivity control. A group consists of two or more RCCAs that are electrically paralleled to step simultaneously. If a bank of RCCAs consists of two groups, the groups are moved in a staggered fashion, but always within one step of each other. All units have four control banks and at least two shutdown banks.

The shutdown banks are maintained either in the fully inserted or fully withdrawn position. The control banks are moved in an overlap pattern, using the following withdrawal sequence: when control bank A reaches a predetermined height in the core, control bank B begins to move out with control bank A. Control bank A stops at the position of maximum withdrawal, and control bank B continues to move out. When control bank B reaches a predetermined height, control bank C begins to move out with control bank B. This sequence continues until control banks A, B, and C are at the fully withdrawn position, and control bank D is approximately halfway withdrawn. The insertion sequence is the opposite of the withdrawal sequence. The control rods are arranged in a radially symmetric pattern, so that control bank motion does not introduce radial asymmetries in the core power distributions.

The control banks are used for precise reactivity control of the reactor. The positions of the control banks are normally automatically controlled by the Rod Control System, but they can also be manually controlled. They are capable of adding negative reactivity very quickly (compared to berating). The control banks must be maintained above designed insertion limits and are typically near the fully withdrawn position during normal full power operations.

The axial position of shutdown rods and control rods is indicated by two separate and independent systems, which are the Bank Demand Position Indication System (commonly called group step counters) and the Rod Position Indication (RPI) System. The Bank Demand Position Indication System counts the pulses from the rod control system that moves the rods. There is one step counter for each group of rods. Individual rods in a group all receive the same signal to move and should, therefore, all be at the same position indicated by the group step counter for that group.

The Bank Demand Position Indication System is considered relatively precise(+/- 1 step or

+/- 5/8 inch). If a rod does not move one step for each demand pulse, the step counter will still count the pulse but incorrectly reflect the position of the rod. However, the RPI System provides a more accurate indication of actual rod position, but at a lower precision than the step counters.

This system is based on inductive analog signals from a series of coils spaced along a hollow tube.

To increase the reliability of the system, the inductive coils are connected alternately to data system A or B. Thus, if one data system fails, the RPI will indicate rod position with half accuracy.

The RPI System is capable of monitoring rod position within at least +/- 12 steps with either full accuracy or half accuracy. Depending on the plant design, the RPI system may be analog or digital. The digital system is called the Digital Rod Position Indication (DRPI) system. Both Farley and Vogtle have a DRPI system.

The shutdown margin (SOM) is defined in NUREG-1431 as the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming:

a.

All RCCAs are fully inserted except for the single RCCA of highest reactivity worth, which is assumed to be fully withdrawn. However, with all RCCAs verified fully inserted by two independent means, it is not necessary to account for a stuck RCCA in the SOM calculation. With any RCCA not capable of being fully inserted, the reactivity worth of the RCCA must be accounted for in the determination of SOM, and

b.

In Power Operation and Startup, the fuel and moderator temperatures are changed to the nominal zero power design level.

The Core Operating Limits Report (COLR) is defined in NUREG-1431 as the unit specific document that provides cycle specific parameter limits for the current reload cycle. These cycle specific parameter limits must be determined for each reload cycle in accordance with TS 5.6.5.

Plant operation within these limits is addressed in individual TS.

2.2 Description of Changes This SE addresses changes to the TS governing rod group alignment limits (TS 3.1.4), shutdown bank insertion limits (TS 3.1.5), control bank insertion limits (TS 3.1.6), and rod position indication instrumentation (TS 3.1. 7). The specific changes are described in the following subsections. The discussion is applicable to both Farley and Vogtle, unless otherwise stated in the discussion.

2.2.1 Provide Time to Correct Rod Movement Failures that Do Not Affect Operability The FNP limiting condition for operation (LCO) 3.1.5 requires that "Each shutdown bank shall be within insertion limits specified in the COLR." Current Condition A for "One or more shutdown banks not within the limits," requires:

A.1.1 Verify SOM to be within the limits provided in the COLR within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

OR A.1.2 Initiate boration to restore SOM to within limit within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

AND A.2 Restore shutdown banks to within limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

The VEGP LCO 3.1.5 requires that "Each shutdown bank shall be within insertion limits specified in the COLR." Current Condition A for "One or more shutdown banks not within the limits,"

requires:

A.1.1 Verify SOM is ;;::: the limit specified in the COLR within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

OR A.1.2 Initiate boration to restore SOM to within limit within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

AND A.2 Restore shutdown banks to within limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

The FNP LCO 3.1.6 requires that each "Control banks shall be within insertion, sequence and overlap limits specified in the COLA." Current Condition A for "Control bank insertion limits not met" requires:

A.1.1 Verify SOM to be within the limits provided in the COLR within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

OR A.1.2 Initiate boration to restore SOM to within limit within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

AND A.2 Restore control bank(s) to within limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

The VEGP LCO 3.1.6 requires that "Control banks shall be within the insertion, sequence and overlap limits specified in the COLA." Current Condition A for "Control bank insertion limits not met," requires:

A.1.1 Verify SOM is ~the limit specified in the COLR within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

OR A.1.2 Initiate boration to restore SOM to within limit within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

AND A.2 Restore control bank(s) to within limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

The proposed change would add a new Condition A to LCO 3.1.5 that would require, with "One shutdown bank inserted :5 16 steps beyond the insertion limits specified in the COLA,"

A.1 Verify all control banks are within the insertion limits specified in the COLR within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

AND A.2.1 Verify SOM is within the limits specified in the COLR within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

OR A.2.2. Initiate boration to restore SOM to within limit within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

AND A.3 Restore the shutdown banks to within the insertion limits specified in the COLR within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The existing Condition A would be renumbered as Condition B and would be modified to apply for "One or more shutdown banks not within limits for reasons other than Condition A." The existing RAs A.1.1, A.1.2, and A.2 would be renumbered B.1.1, B.1.2, and B.2. The existing Condition B and RA B.1 would be renumbered Condition C and RA C.1.

The proposed change would add a new Condition A to LCO 3.1.6 that would require, if "Control bank A, B, or C is inserted ~ 16 steps beyond the insertion, sequence, or overlap limits specified in the COLR,"

A.1 Verify all shutdown banks are within the insertion limits specified in the COLR within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

AND A.2.1 Verify SOM is within the limits specified in the COLR within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

OR A.2.2.

AND A.3 Initiate boration to restore SOM to within the limit within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Restore the control bank to within the insertion, sequence, and limits specified in the COLR within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The existing Condition A would be renumbered as Condition B and would be modified to apply for "Control bank insertion limits not met for reasons other than Condition A." The existing RAs A.1.1, A.1.2, and A.2 would be renumbered B.1.1, B.1.2, and B.2.

The existing Condition B would be modified to apply when control bank sequence or overlap limits are not met for reasons other than Condition A. Existing Condition Band RAs B.1.1, B.1.2, and B.2 would be renumbered as Condition C and RAs C.1.1, C.1.2, and C.2. Existing Condition C and RA C.1 would be renumbered as Condition D and RA D.1.

The shutdown banks must be within their insertion limits any time the reactor is critical or approaching criticality. This ensures that a sufficient amount of negative reactivity is available to shut down the reactor and maintain the required SOM following a reactor trip.

The limits on control banks sequence, overlap, and physical insertion, as defined in the COLR, must be maintained because they serve the function of preserving power distribution, ensuring that the SDM is maintained, ensuring that ejected rod worth is maintained, and ensuring adequate negative reactivity insertion is available on trip.

2.2.2 Provide an Alternative to Frequent Verification of Rod Position Using the Movable lncore Detectors LCO 3.1.7, "Rod Position Indication," requires that the DRPI and the Demand Positon Indication System shall be OPERABLE in Modes 1 and 2. Condition A applies for "One DRPI per group inoperable for one or more groups" of rods. The associated RAs are:

A.1 Verify the position of the rods with inoperable DRPls (FNP only) or position indicators (VEGP only} indirectly by using the movable incore detectors once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

OR A.2 Reduce THERMAL POWER to~ 50 percent RTP [rated thermal power]

within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

The proposed change would add two new RAs (RA A.2.1 and RA A.2.2) to Condition A as alternatives to the once-per-8-hour indirect determination of rod position. The revised RAs would be:

A.1 Verify the position of the rods with inoperable DRPI indirectly by using the moveable incore detectors once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

OR A.2.1 Verify the position of rod with inoperable DRPI indirectly by using moveable incore detectors within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, AND once per 31 EFPD [days of full power operation] thereafter, AND within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after discovery of each unintended rod movement, AND within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after each movement of rods with inoperable DRPI > 12 steps, AND prior to THERMAL POWER exceeding 50 percent RTP (rated thermal power), AND within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after reaching RTP.

AND A.2.2 Restore inoperable DRPI to OPERABLE status prior to entering MODE 2

[Startup] from MODE 3 [Hot Standby].

OR A.3 Reduce THERMAL POWER to ::;; 50 percent RTP within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

LCO 3.1.4 requires that "All shutdown and control rods shall be OPERABLE, with all individual indicated rod positions within 12 steps of their group step counter demand position." The 12-step agreement limit between the Bank Demand Position Indication System and the DRPI System indicates that the Bank Demand Position Indication System is adequately calibrated, and can be used for indication of the measurement of control rod bank position. When one DRPI channel per group fails, the position of the rod may still be determined indirectly by use of the movable incore detectors.

Current Surveillance Requirement (SR) 3.1.4.1 requires "Verify individual rods positions within alignment limit" in accordance with the Surveillance Frequency Control Program. This SR is proposed to be modified by the following Note "Not required to be performed for rods associated with inoperable rod position indicator or demand position indicator" meaning that the SR is not applicable for rods with an inoperable DRPI.

Verification that individual rod positions are within alignment limits at the Frequency specified in the Surveillance Frequency Control Program provides a history that allows the operator to detect a rod that is beginning to deviate from its expected position. The specified Frequency takes into account other rod position information that is continuously available to the operator in the control room, so that during actual rod motion, deviations can immediately be detected.

2.2.3 Allow Time for Thermal Equilibrium of Analog RPI This section of TSTF-547 and corresponding section of the model SE is not applicable to plants with DRPI systems. Both FNP and VEGP have DRPI systems. This does not impact the evaluation of the other TS changes described in this SE.

2.2.4 Clarify SRs in TS 3.1.4 and TS 3.1.7 LCO 3.1.4 specifies that all shutdown and control rods shall be operable and individual indicated rod positions shall be within 12 steps of their group step counter demand position.

SR 3.1.4.1 requires verifying the position of individual rods are within the alignment limits with a frequency in accordance with the Surveillance Frequency Control Program. The proposed change is the addition of a Note to SR 3.1.4.1 stating that the SR is not required to be performed for rods associated with an inoperable rod position indicator or demand position indicator. This Note is being added because SR 3.1.4.1 cannot be performed for rods with an inoperable rod position indicator or demand position indicator.

SR 3.1.7.1 requires verification that each DRPI agrees within the required steps of the group demand position for the [full indicated range] of rod travel. The proposed change is the addition of a Note to SR 3.1.7.1 stating that the SR would not be required to be met for rods known not to meet LCO 3.1.4.

2.2.5 Eliminate an Unnecessary RA from TS 3.1.7 LCO 3.1.7, "Rod Position Indication," requires that the DRPI and the Demand Positon Indication System be operable during Mode 2, Startup, and Mode 1, Power Operation. Condition Bis applicable when more than one DRPI per group is inoperable. Existing RA B.2 states, "Monitor and Record Reactor Coolant System Tavg."

RA B.2 is proposed to be deleted.

The existing RA B.3 is also being deleted as described below in Section 2.2.6, Item 5. Existing RA B.4 is being renumbered as B.2.

2.2.6 Other Proposed Changes The proposed changes described in this section are editorial and do not change the technical content.

1. LCO 3.1.4, Condition B, is revised to eliminate RA B.1 (FNP only) and to combine RAs B.2.4 and B.2.5. Condition B applies when one rod is not within the alignment limits and RA B.1 requires restoring the rod to within limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. An alternative set of RAs is provided in the RA section, and will continue to be required when Condition B is applicable. RA B.1 is an Action that requires restoration of equipment such that the Condition does not apply. Restoring equipment to operable status is understood to be an option. Therefore, stating this as an RA is not necessary.

Combining RAs B.2.4 and B.2.5 is editorial and has no technical implications.

2. LCO 3.1.5 and LCO 3.1.6 contain a note modifying their Applicability that states "This LCO is not applicable while performing SR 3.1.4.2." The proposed change moves the LCO 3.1.5 and LCO 3.1.6 Applicability Notes to LCO Notes and revises the Notes to state, "Not applicable to shutdown banks inserted while performing SR 3.1.4.2" for LCO 3.1.5 and "Not applicable to control banks inserted while performing SR 3.1.4.2" for LCO 3.1.6. This change clarifies the note and does not alter its meaning.
3. TS 3.1. 7 is revised to consistently use the defined abbreviation "DRPI." This affects the Actions Note, RA A.1 (Vogtle only), and RA B.2.
4. TS 3.1.7, Condition A, is revised from 'for one or more groups" to the more standard terminology "in one or more groups, and TS 3.1.7, Condition Bis revised to include the phrase "in one or more groups" to be more consistent with the wording of Condition A.
5. TS 3.1. 7, RA B.3 is redundant to RA A.1. RA B.3 is proposed to be deleted. Condition A applies when one DRPI per group is inoperable and Condition B applies when more than one DRPI per group is inoperable. Each entry into Condition B also requires entry into Condition A.

Restating the RA is not necessary.

6. TS 3.1.7, Condition C is revised to contain similar terminology to Conditions A and B. The existing Condition C states, "One or more rods with inoperable DRPls have been moved in excess of 24 steps (FNP only) or<:: 24 steps (VEGP only) in one direction since the last determination of the rod's position." Conditions A and Bare worded such that the condition describing the inoperable equipment (e.g., "One DRPI per group inoperable... ") is listed first.

The proposed change rewords Condition C to state, "One or more DRPI inoperable in one or more groups and associated rod has moved <:: 24 steps in one direction since the last determination of the rod's position."

7. LCO 3.1.7, Condition Dis revised from "One demand position indicator per bank inoperable for one or more banks" to "One or more demand position indicators per bank inoperable in one or more banks." The proposed change makes the terminology consistent with the Note modifying the RAs.

The current TS 3.1.7 is modified by a Note which states, "Separate Condition entry is allowed for each inoperable rod position indicator and each demand position indicator." The Bases for the Note states that the Note is acceptable because the RAs for each condition provide appropriate compensatory actions for each inoperable indicator.

There is one demand position indicator per group of rods. For banks with two groups of rods, there are two demand indicators per bank. The separate condition entry Note modifying the TS 3.1.7 Actions states that separate condition entry is allowed for inoperable demand position indicators which means that the Condition D is applicable to more than one inoperable demand position indicator per bank. The proposed change makes the existing Condition D terminology consistent with the Note.

2.2.7 Variations from TSTF-547 The licensee identified several variations from the TS changes contained in TSTF-547:

1. TSTF-547 deletes former TS 3.1.4 Required Action (RA) B.1 "Restore rod to within alignment limits." Stating this RA is not necessary since restoring equipment to operable status is understood to always be an option. VEGP does not have a corresponding TS 3.1.4 RA B.1, so these changes are not applicable to VEGP.
2. TSTF-547 makes the following editorial change to TS 3.1.7 RA A.1 (with underline added for effect):

Verify the position of the rod§ with inoperable DRPI position indicators indirectly by using movable incore detectors.

FNP's corresponding RA was consistent with NUREG-1431 Rev. 4, except that it already replaced "position indicators" with "DRPls". To be consistent with making "rods" singular ("rod"), "DRPls" is being changed to "DRPI".

3. TSTF-547 contains the following oversight in new RA A.2.1 to TS 3.1.7 (with underline added for effect):

Verify the position of the rod§. with inoperable DRPI indirectly by using movable incore detectors.

To be consistent with the changes made to RA A.1, "rod" (singular) should have been used instead of "rods" (plural). The VEGP and FNP markups correct this oversight by using "rod" (singular) for this RA.

4. The current VEGP TS 3.1.7 Condition B states "More than one DRPI group inoperable." This should have stated "More than one DRPI per group inoperable." This was an obvious oversight from when VEGP adopted TSTF-234, which was approved by the NRC June 9, 2016. The marked-up pages from VEGP's July 18, 2014 application to adopt TSTF-234 (ML14203A124) correctly stated "per group", consistent with TSTF-234. To clarify the intent of the TSTF-547 modifications to Condition 8, this oversight is being corrected.
5. RA C.1 from the TSTF-547 markup for TS 3.1.7 (with insert shown underline) states "Verify the position of the rods with inoperable DRPls position indicators indirectly by using movable incore detectors." with a Completion Time (CT) of

[4] hours. FNP's corresponding RA is split into two RAs. FNP's RA C.1.1 states to "Initiate action to verify the position of the rods with inoperable DRPI indirectly by using movable incore detectors." with a CT of "Immediately", and RA C.1.2 states to "Complete rod position verification started in Required Action C.1.1."

with a CT of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. While FNP has the additional requirement to begin this step "Immediately", the net RA is the same between the TSTF-547 markups and FNP.

2.3 Regulatory Review The categories of items required to be in the TSs are provided in Title 1 O of the Code of Federal Regulations (10 CFR) Section 50.36(c). As required by 10 CFR 50.36(c)(2)(i), the TSs will include LCOs, which are the lowest functional capability or performance levels of equipment required for safe operation of the facility. Per 10 CFR 50.36(c)(2)(i), when an LCO of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the TSs until the condition can be met. The regulation at 10 CFR 50.36(c)(3) requires TSs to include items in the category of SRs, which are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCOs will be met. Also, 10 CFR 50.36(a)(1) states that a summary statement of the bases or reasons for such specifications, other than those covering administrative controls, shall also be included in the application, but shall not become part of the TSs.

The U.S. Nuclear Regulatory Commission (NRC) staff's guidance for review of TSs is in Chapter 16, Technical Specifications, of NUREG-0800, Revision 3, Standard Review Plan (March 2010) (ADAMS Accession No. ML100351425). As described therein, as part of the regulatory standardization effort, the NRC staff has prepared Standard Technical Specifications (STSs) for each of the light-water reactor nuclear designs. NUREG-1431 contains the STS for Westinghouse-designed plants.

3.0 TECHNICAL EVALUATION

During the review of STS Change Traveler TSTF-547, the NRC staff reviewed the proposed changes to NUREG-1431 and the technical justification for the changes provided in Traveler TSTF-547. The NRC staff reviewed the technical justification for the proposed changes to ensure the reasoning was logical, complete and clearly written as described in Chapter 16 of NUREG-0800. The NRC staff reviewed the proposed changes for continued compliance with the requirements of 1 O CFR 50.36 and for consistency with conventional terminology and with the format and usage rules embodied in the STS. The NRC staff considered whether there should be any limitations or conditions placed on adoption of the Traveler by future applicants.

3.1 Provide Time to Correct Rod Movement Failures that Do Not Affect Operability Review The proposed new Condition A of TSs 3.1.5 and 3.1.6 for shutdown and control bank insertion limits would allow 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to restore a single bank to be within its insertion limit when inserted below the insertion limit. With one shutdown or control bank inserted a maximum of 16 steps below the rod insertion limit, the RAs associated with new Condition A also require verification that all other control (LCO 3.1.5, Condition A) and shutdown banks (LCO 3.1.6, Condition A) are within the insertion limits; and verification that the reactor can be shutdown using control rods or boration.

The CT for these RAs is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

The new conditions define limits of both duration and insertion if a bank is immovable due to failures external to the CROM. A maximum of one control or shutdown bank may be inserted beyond the limits for a maximum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> provided all other banks are within the insertion limits and that the reactor could be shut down using control rods or boration. The new Condition A imposes a limit on the insertion of 16 steps less than the insertion limit. The value of 16 steps corresponds to the minimum number of steps that the rods must be moved to ensure correct performance of SR 3.1.4.2.

The NRC staff reviewed the justification for the proposed addition of Condition A to TS 3.1.5 and TS 3.1.6 provided in the Technical Evaluation Section of Traveler TSTF-547, to ensure the reasoning is logical, complete and clearly written. The justification in Traveler TSTF-547 states:

1. All control and shutdown rod assemblies are required to be Operable. If a rod is untrippable (i.e., inoperable), then a plant shutdown is required in accordance with LCO 3.1.4, Condition A.
2. Only one control bank and shutdown bank may be inserted beyond insertion limits by no more than 16 steps. If one or more control banks or shutdown banks exceed the insertion limit, a brief time period is permitted to correct the condition and then a plant shutdown is required.
3. If one rod is not within the alignment limits, adequate SOM is verified and a power reduction is required by LCO 3.1.4, Condition B. If more than one rod is not within the alignment limit as defined in LCO 3.1.4, adequate SOM is verified and a plant shutdown is required.

The insertion limits are established to ensure a sufficient amount of negative reactivity can be rapidly inserted to shutdown the reactor. The NRG staff finds that allowing continued full-power operations for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with a rod movement failure is acceptable for the following reasons:

1. the Shutdown Margin continues to be met;
2. all control and shutdown rods are trippable - i.e., capable of being rapidly inserted into the core;
3. only one bank may exceed insertion limits by no more than a specified number of steps;
4. all immovable rod assemblies are aligned; and
5. the rods must be restored to within the insertion limits within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The change to TS 3.1.5 and TS 3.1.6 to provide time to correct rod movement failures that do not affect operability will allow sufficient time for diagnosis and repairs while maintaining the safety function of the control rods since the affected rods are still trippable. The thermal margins may be affected by power distribution changes due to control rod bank insertion, both during the insertion and during the resulting local xenon transient. However, insertions at or near the typical value of 16 steps from fully withdrawn, as provided in the proposed changes to TSs 3.1.5 and 3.1.6, would result in a very small negative reactivity impact at the top of active fuel. The resulting effect on the axial power distribution is not expected to be significant. In addition, alignment of all rods with the rod bank position (as per LCO 3.1.4) must be maintained and it will be verified that the reactor can still be shutdown. Therefore, the NRC staff has determined that the proposed 24-hour CT for Condition A in LCO 3.1.5 and 3.1.6 specifying shutdown bank and control bank insertion limits is acceptable.

The NRC staff concludes that TS 3.1.5 and TS 3.1.6, as modified by the addition of Condition A, continue to specify the minimum performance level of equipment needed for safe operation of the facility as a LCO; and continue to specify the appropriate remedial measures if the LCO is not met.

SRs are not being changed by the addition of Condition A. The NRC staff finds that the requirements of 10 CFR 50.36(c)(2) continue to be met because the minimum performance level of equipment needed for safe operation of the facility is contained in the LCO and the appropriate remedial measures are specified if the LCO is not met.

3.2 Provide an Alternative to Frequent Verification of Rod Position Using the Movable lncore Detectors Review LCO 3.1.7 requires that the DRPI and the Demand Position Indication System be Operable during Power Operation and Startup. When one or more DRPI are inoperable, current TS 3.1.7 requires verification of rod position once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> using the movable incore detector system or a reduction in thermal power to less than or equal to 50 percent rated thermal power (ATP) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The proposed change provides an alternative set of RAs.

New RA A.2.1 requires use of the movable detector system to monitor the position of the rod within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of the inoperability of DRPI, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after discovery of each unintended rod movement, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after each greater than 12 step movement of a rod with inoperable DRPI, prior to exceeding 50 percent ATP, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after reaching ATP, and once per 31 effective full power days (EFPD) thereafter. New RA A.2.2 would require the inoperable DRPI to be restored to Operable status prior to entering Startup from Hot Standby.

The implementation of new RAs A.2.1 and A.2.2 would allow use of an alternative monitoring scheme until the next shutdown, after which the DRPI must be restored to an Operable status.

The NRG staff finds that the new RAs A.2.1 and A.2.2 and CTs are more appropriate because they require verification of rod position following circumstances in which rod motion could occur. This is more appropriate than current TS 3.1.7 RA A.1, which requires verification of rod position using the movable incore detection system once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, regardless of whether the rods have moved or not. Additionally, the new RAs A.2.1 and A.2.2 contain a requirement to restore the DRPI to operable status prior to restart.

If the rod position indication is failed for an individual rod, its position is determined indirectly by use of the movable incore detectors. The NRG staff has determined that this change, which verifies rod position using the movable incore detectors based on the occurrence of events requiring rod motion, rather than determining position on a specified frequency, is acceptable because events requiring rod motion of the shutdown banks and control banks A, B, and C are relatively infrequent during steady state operation. Events involving significant movement of rods in control bank D are also relatively infrequent. The indirect determination of rod position is required after significant changes in power level or following substantial rod motion.

The addition of the Note to SR 3.1.4.1 stating that the SR is not required to be performed for rods associated with an inoperable DRPI or demand position indicator is appropriate because the RAs of TS 3.1.7 for an inoperable DRPI provide the appropriate actions for indirectly determining the position of the affected rods.

The NRG staff concludes that the addition of an alternative monitoring scheme to indirectly determine the position of rods associated with an inoperable DRPI is acceptable. TS 3.1.7, as modified, continues to specify the minimum performance level of equipment needed for safe operation of the facility as an LCO and continues to specify the appropriate remedial measures if the LCO is not met. The revised SR 3.1.4.1, which has been clarified to specify when it is required to be performed, continues to be an appropriate test to ensure that the necessary quality of systems is maintained. The NRG staff finds that the requirements of 1 O CFR 50.36{c)(2) continue to be met because the minimum performance level of equipment needed for safe operation of the facility is contained in the LCO and the appropriate remedial measures are specified if the LCO is not met. The NRG staff finds that the requirements of 1 O CFR 50.36(c)(3) continue to be met because the revised SR provides the appropriate testing to ensure the necessary quality of components is maintained and that the LCO will be met.

3.3 Clarify SRs in TS 3.1.4 and TS 3.1.7 Review 3.3.1 Clarification of SR 3.1.4.1 LCO 3.1.4 requires that all shutdown and control rods shall be operable and individual indicated rod positions shall be within 12 steps of their group step counter demand position. SR 3.1.4.1 requires verification of the individual rod positions within the alignment limit periodically:

SR 3.1.4.1 cannot be performed for rods with an inoperable bank demand position indicator.

Failure to meet an SR is considered a failure to meet an LCO requirement. Therefore, if SR 3.1.4.1 cannot be performed, entry into LCO 3.1.4 Condition D is required. LCO 3.1.4 Condition D applies when more than one rod is not within the alignment limit. The RA associated with Condition D requires, in part, that the reactor be in Mode 3 (Hot Standby) within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

LCO 3.1.7 requires the DRPI and bank demand position indication to be operable. LCO 3.1.7 Condition D applies if one demand position indicator per bank is inoperable for one or more banks.

The Condition D RAs require verification that all DRPls for the affected banks are operable and require verification that the most withdrawn rod and least withdrawn rod of the affected banks are less than or equal to 12 steps apart once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Alternatively, thermal power must be reduced to less than or equal to 50 percent RTP.

A Note is being added to SR 3.1.4.1 stating that this SR is not required to be performed for rods associated with an inoperable demand position indicator or ORPI. The alignment limit is based on the demand position indicator. If the bank demand position indicator is inoperable, the SR cannot be performed.

Following modification of SR 3.1.4.1, Condition O of LCO 3.1. 7 would be the applicable Condition to be entered in the event of inoperable demand position indicators. The RAs associated with Condition 0 of LCO 3.1.7 provide the appropriate actions in this situation by requiring that the ORPls are operable and that the individual rods in the bank are not misaligned by more than 12 steps.

3.3.2 Clarification of SR 3.1.7.1 LCO 3.1.4 requires that all shutdown and control rods shall be operable and individual indicated rod positions shall be within 12 steps of their group step counter demand position.

LCO 3.1.7 requires the ORPI and bank demand position indication to be operable.

SR 3.1.7.1 requires verification that each ORPI agree within 12 steps of the group demand position for the [full indicated range] of rod travel. This SR is performed once prior to criticality after each removal of the reactor head. Failure to meet an SR is considered a failure to meet the LCO per SR 3.0.1. The requirements of SRs must be satisfied in between performances of the surveillance test itself. If a control or shutdown rod is not within 12 steps of its bank demand position indication, then the requirements of both LCO 3.1.4 and LCO 3.1. 7 are not met.

A Note is being added to SR 3.1.7.1 stating that this SR is not required to be performed for rods that are known not to meet LCO 3.1.4. If a rod is known not to be within 12 steps of the group demand position, LCO 3.1.4 provides the appropriate RAs. With one rod not within the alignment limit, LCO 3.1.4 Condition B requires verification of shutdown margin or boration until SOM is met; a reduction in RTP, periodic re-verification of shutdown margin, verification that heat flux and nuclear enthalpy rise hot channel factors are within limits, and safety analyses must be re-evaluated to confirm results remain valid for duration of operation under these conditions. If more than one rod is not within the alignment limit, the SOM must be determined by verifying that the shutdown margin is within limits or by initiating boration to restore required SOM and plant shutdown is required.

3.3.3 Evaluation of SR 3.1.4.1 and SR 3.1.7.1 Changes The NRC staff reviewed the technical justification for the proposed changes provided in the Traveler TSTF-547 for logical reasoning, completeness and clarity. The purpose of the changes is to prescribe the appropriate Actions to be followed when equipment is inoperable.

TS 3.1.4 provides limits on rod alignment to ensure acceptable power peaking factors and local linear heat rates and an acceptable shutdown margin, all of which are initial conditions in the applicable safety analyses. It is appropriate to consolidate requirements associated with rod misalignments in this TS. TS 3.1.7 provides requirements for instrumentation to monitor rod position. The instrumentation is used to verify that the rod alignment limits in TS 3.1.4 are satisfied. Similarly, it is appropriate to consolidate requirements associated with instrumentation operability in this TS.

The NRG staff concludes that the clarifications to SRs 3.1.4.1 and 3.1.7.1 to specify configurations in which performance of the SRs is not required are appropriate. The TSs, as modified, continue to specify the minimum performance level of equipment needed for safe operation of the facility as an LCO, and continue to specify the appropriate remedial measures if the LCO is not met. The revised SRs 3.1.4.1 and 3.1. 7.1 continue to be appropriate, because they ensure the necessary quality of systems is maintained. The NRG staff finds that the requirements of 10 CFR 50.36(c)(2) and 10 CFR 50.36(c)(3) continue to be met.

3.4 Eliminate an Unnecessary RA from LCO 3.1.7 Review The NRG staff reviewed the justification for deletion of LCO 3.1.7, RA B.2 that monitors and records reactor coolant average temperature (Tav9). RA B.2 is one of the RAs associated with LCO 3.17 Condition B. Condition B applies when more than one DRPI per group is inoperable in one or more groups. RA B.1 requires that the control rods be placed in manual control immediately and existing RA B.4 (renumbered as B.2) requires restoring the inoperable position indicators to operable status such that a maximum of one DRPI per group is inoperable within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The NRG staff has determined that RA B.2 provides no safety benefit for identifying trends in reactor coolant T avg. This RA was intended to help assure that significant changes in power distribution and shutdown margin are avoided. During normal steady state power operation, there is very little rod motion. LCO 3.1.7 RA B.1 and RA B.4 (renumbered as RA B.2) continue to apply when more than one DRPI per group is inoperable. LCO 3.1.4 and LCO 3.1.7 provide the appropriate requirements for monitoring rod position and alignment and provide the appropriate actions, if a rod is misaligned. This provides the necessary verification that SOM is maintained.

The nuclear instrumentation monitors neutron flux in the core providing indication of changes in power distribution. Therefore, the NRG staff concludes that RA B.2 of LCO 3.1.7 is unnecessary and can be deleted.

The NRG staff concludes that the proposed changes to LCO 3.1.7 are acceptable because the LCO continues to specify the minimum performance level of equipment needed for safe operation of the facility. As described in the preceding paragraph the appropriate remedial measures are prescribed when the LCO is not met. SRs are not being changed by the deletion of RA B.2. The NRG staff finds that the requirements of 1 O CFR 50.36(c)(2} continue to be met.

3.5 Other Proposed Changes The NRG staff found that the following changes are editorial in nature and do not change the TS requirements, and are therefore acceptable.

1. LCO 3.1.4, Condition B, is revised to eliminate RA B.1 (FNP only) and to combine RAs B.2.4 and B.2.5. Condition B applies when one rod is not within the alignment limits and RA B.1 requires restoring the rod to within limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. An alternative set of RAs is provided in the RA section, and will continue to be required when Condition B is applicable.

RA B.1 is an Action that requires restoration of equipment such that the Condition does not apply. Restoring equipment to operable status is understood to be an option. Therefore, stating this as an RA is not necessary.

The current VEGP LCO 3.1.4 Condition B does not contain a requirement to restore the rod to within the limits within one hour, so this portion of the editorial changes is not applicable to VEGP.

2. LCO 3.1.5 and LCO 3.1.6 contain a note modifying their Applicability that states "This LCO is not applicable while performing SR 3.1.4.2." The proposed change moves the LCO 3.1.5 and LCO 3.1.6 Applicability Notes to LCO Notes and revises the Notes to state, "Not applicable to shutdown banks inserted while performing SR 3.1.4.2" for LCO 3.1.5 and "Not applicable to control banks inserted while performing SR 3.1.4.2" for LCO 3.1.6. This change clarifies the note and does not alter its meaning.
3. TS 3.1.7 is revised to consistently use the defined abbreviation "DRPI." This affects the Actions Note, RA A.1 (Vogtle only}, and RA B.2.
4. TS 3.1.7, Condition A, is revised from for one or more groups" to the more standard terminology "in one or more groups," and TS 3.1.7, Condition Bis revised to include the phrase "in one or more groups" to be more consistent with the wording of Condition A.
5. TS 3.1.7, RA B.3 is redundant to RA A.1. RA B.3 is proposed to be deleted. Condition A applies when one DRPI per group is inoperable and Condition B applies when more than one DRPI per group is inoperable. Each entry into Condition B also requires entry into Condition A. Restating the RA is not necessary.
6. TS 3.1.7, Condition C, is revised to contain similar terminology to Conditions A and B. The existing Condition C states, "One or more rods with inoperable position indicators have been moved> 24 steps in one direction since the last determination of the rod's position."

Conditions A and B are worded such that the condition describing the inoperable equipment (e.g., "One DRPI per group inoperable... ") is listed first. The proposed change rewords Condition C to state, "One or more DRPI inoperable in one or more groups and associated rods have been moved >24 steps in one direction since the last position determination."

7. LCO 3.1.7, Condition D, is revised from "One demand position indicator per bank inoperable for one or more banks" to "One or more demand position indicators per bank inoperable in one or more banks." The proposed change makes the terminology consistent with the Note modifying the RAs.

The current TS 3.1.7 is modified by a Note which states, "Separate Condition entry is allowed for each inoperable rod position indicator and each demand position indicator."

The Bases for the Note states that the Note is acceptable because the RAs for each condition provide appropriate compensatory actions for each inoperable indicator.

There is one demand position indicator per group of rods, two demand indicators per bank in those banks with two groups. The separate condition entry Note modifying the TS 3.1. 7 Actions states that separate condition entry is allowed for inoperable demand position indicators which means that Condition D is applicable to more than one inoperable demand position indicator per bank. The proposed change makes the existing Condition D terminology consistent with the Note.

The regulation at 1 O CFR 50.36(a)(1) states, in part: "A summary statement of the bases or reasons for such specifications... shalt also be included in the application, but shall not become part of the technical specifications." Accordingly, along with the proposed TS changes, SNC also submitted TS Bases changes that corresponded to the proposed STS changes for information only.

3.6 Variations from TSTF-547 The staff reviewed the variations from the TSTF proposed by the licensee. The staff determined that the variations are editorial in nature and do not impact the applicability or the conclusions presented in the SE of TSTF-547. The changes are therefore acceptable.

3.7 Summary of NRC Staff Conclusions The regulations at 10 CFR 50.36 require that TSs will include items in specified categories, including LCOs and SRs. The proposed changes to FNP and VEGP modify the LCOs, Conditions, RAs, CTs, and SRs applicable to control rod and shutdown rod insertion and alignment limits and the instrumentation to monitor rod position and alignment. The FNP and VEGP TSs continue to specify the LCOs and specify the remedial measures to be taken if one of these requirements is not satisfied. The FNP and VEGP TSs continue to specify the appropriate SRs for tests and inspections to ensure the necessary quality of affected structures, systems and components is maintained. The NRC staff finds that the proposed FNP and VEGP LCOs, and SRs meet the requirements of 10 CFR 50.36(c)(2) and 50.36(c)(3), respectively.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the State of Alabama official and the State of Georgia official were notified of the proposed issuance of the amendments on September 8, 2017.

The NRC staff confirmed that neither State official had comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendments change a requirement with respect to the installation or use of facility components located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding on January 31, 2017 (82 FR 8872). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: M. Chernoff, NRR/DSS Date of issuance: October 2, 2017

ML17214A546

  • via memo OFFICE NRR/DORL/LPL2-1 /PM NRR/DORL/LPL2-1 /LA NRR/DSS/STSB/BC*

NRR/DSS/SRXB/BC NAME SWilliams KGoldstein JWhitman EOesterle DATE 9/6/2017 8/25/2017 8/16/2017 9/7/2017 OFFICE OGC-NLO NRR/DORL/LPL2-1/BC NRR/DORL/LPL2-1 /PM NAME BHarris MMarkley SWilliams DATE 9/14/2017 9/28/2017 10/2/2017