MONTHYEARND-23-0490, ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786)2023-07-0808 July 2023
[Table view]ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786) ML19312A0542019-11-19019 November 2019 Figure 3.4.16-1 - Reactor Coolant Dose Equivalent I-131 Reactor Coolant Specific Activity Limit Versus Percent of Rated Thermal Power with the Reactor Coolant Specific Activity NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 9 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 9 of 11, Redacted NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 1 of 112016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 1 of 11 NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 2 of 112016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 2 of 11 NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 3 of 112016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 3 of 11 NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 6 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 6 of 11, Redacted NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 7 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 7 of 11, Redacted NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 8 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 8 of 11, Redacted ML17032A1552016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 9 of 11, Redacted NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 10 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 10 of 11, Redacted NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 11 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 11 of 11, Redacted NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 4 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 4 of 11, Redacted ML17032A1562016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 10 of 11, Redacted ML16330A4862016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 3 of 11 ML16330A4852016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 2 of 11 NL-16-2280, Updated Final Safety Analysis Report, Reference Drawings, Part 5 of 11, Redacted2016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 5 of 11, Redacted ML17032A1492016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 8 of 11, Redacted ML17032A1602016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 4 of 11, Redacted ML17032A1462016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 7 of 11, Redacted ML16330A4842016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 1 of 11 ML17032A1572016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 11 of 11, Redacted ML17032A1442016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 6 of 11, Redacted NL-12-0872, Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.7.9 Ultimate Heat Sink (UHS)2012-04-30030 April 2012 Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.7.9 Ultimate Heat Sink (UHS) NL-12-0371, Provision of Engineering Drawings Is Support of Technical Specification Revision Request for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System2012-02-23023 February 2012 Provision of Engineering Drawings Is Support of Technical Specification Revision Request for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System ML1020302752010-07-13013 July 2010 Photograph - Vogtle Sample Results and Diagram ML0733006532007-11-12012 November 2007 Plant Vogtle Landfill #2: Design and Operational Plan ML0732405702007-11-0505 November 2007 Drawing H-993-3, Plant Vogtle New Unit Early Permit Study Savannah River Hydrographic Study - Proposed Discharge Burke County, Georgia. NL-07-0803, Pressurizer Nozzle Full Structural Weld Overlay Nondestructive Examination Results Spring 2007 Outage (2R12)2007-04-13013 April 2007 Pressurizer Nozzle Full Structural Weld Overlay Nondestructive Examination Results Spring 2007 Outage (2R12) ML0732405712006-08-31031 August 2006 Drawing Vogtle, Units 1 and 2, Figure 5.2-4 River Cross Sections at Existing Discharge Location. ML0733006542001-10-19019 October 2001 Plant Vogtle Landfill #3: Design and Operational Plan ML0732405661999-04-0505 April 1999 Map, Traffic Count Map, City of Augusta, Richmond County Georgia. ML0717100871974-03-0404 March 1974 Georgia Power Company Submits Herewith Amendment No. 3 to the Environmental Report for the Alvin W. Vogtle Nuclaer Plant Units 1, 2, 3, 4 2023-07-08 Category:License-Operating (New/Renewal/Amendments) DKT 50 MONTHYEARML24016A1132024-01-30030 January 2024
[Table view]Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23311A2452023-11-0707 November 2023 Pre-Submittal Meeting on November 7, 2023 - License Amendment Request to Revise the Ultimate Heat Sink Mission Time (Slides) ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request ML23093A0282023-08-0101 August 2023 Issuance of Amendments Nos. 220 and 203, Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23158A0182023-07-31031 July 2023 Issuance of Amendments Nos. 219 and 202, Regarding Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 ML23158A2082023-07-19019 July 2023 LAR-23-005 U/4 Amd 189 Timing of TS Effectiveness Prior to Initial Criticality Amendment ML23115A1492023-06-15015 June 2023 Issuance of Amendments No. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology ML23150A0802023-05-30030 May 2023 Acceptance Review - Vogtle Units 1 and 2 - Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23048A0682023-03-0101 March 2023 Summary of February 13, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc. Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML23013A2182023-01-13013 January 2023 Amendment No. 189 to License NPF-91 - Tech Spec Limiting Conditions for Operability Req for Auto Depressurization System Stage 4 Flow Paths Prior to Initial Criticality ML22279A0122022-11-22022 November 2022 Attachment Amendment 187 U4 (LAR-22-003) ML22116A0842022-07-0505 July 2022 Issuance of Amendment Nos. 215 and 198, Regarding Revision to Technical Specification 3.7.2, Main Steam Isolation Valves (Msivs) ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21344A0032022-01-26026 January 2022 Issuance of Amendments Regarding Revision to Use Beacon Power Distribution Monitoring System ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21314A1502021-12-0707 December 2021 Issuance of Amendment Nos. 210 and 193, Regarding Revision to Technical Specification 3.3.5, 4.16 (Kilovolt) Kv (Engineered Safety Feature) Esf Bus Loss of Power (LOP) Instrumentation (EPID L 2021-LLA-0054 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21225A5532021-08-31031 August 2021 August 13,2021, Public Meeting Summary with Southern Nuclear Operating Regarding Proposed LAR to Revise Technical Specifications Related to Reactor Trip System & Engineered Safety Feature Actuation System Instrumentation for Vogtle 1&2 (L-2 ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21068A0822021-07-30030 July 2021 Issuance of Amendment Nos. 206 and 189, Regarding a License Amendment Request for a Risk-Informed Resolution to GSI-191 NL-21-0379, Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions2021-04-27027 April 2021 Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21095A0872021-04-19019 April 2021 Non-Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values ML19346E4632020-01-30030 January 2020 Issuance of Amendments Nos. 202 and 185 Regarding End State Revision from Hot Shutdown to Cold Shutdown for Several Technical Specifications ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19312A0542019-11-19019 November 2019 Figure 3.4.16-1 - Reactor Coolant Dose Equivalent I-131 Reactor Coolant Specific Activity Limit Versus Percent of Rated Thermal Power with the Reactor Coolant Specific Activity ML19046A0882019-06-24024 June 2019 Issuance of Amendments Request for TS Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidated Line Item ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML18304A3942019-01-11011 January 2019 Issuance of Amendment Nos. 198 and 181, Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML18263A0392018-10-29029 October 2018 Issuance of Amendments to Extend the Containment Type a Leak Rate Test Frequency to 15 Years and Type C Leak Rate Test Frequency to 75 Months (CAC Nos. MG0240 and MG0241; EPID L-2017-LLA-0295) ML18180A0622018-08-10010 August 2018 Issuance of Amendment Nos. 196 and 179 Regarding Application of the Seismic Probabilistic Risk Assessment Into the Previously Approved 10 CFR.50.69. Categorization Process ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18123A5142018-05-31031 May 2018 Amendment 124 - Vogtle Electric Generating Plant Unit 3 COLR and Consistency Changes (LAR-18-006) ML18123A5152018-05-31031 May 2018 Amendment 123 - Vogtle Electric Generating Plant Unit 4 COLR and Consistency Changes (LAR-18-006) ML18075A1022018-03-29029 March 2018 Amendment - Vogtle Electric Generating Plant Unit 4 LAR 17-027 ML18075A1002018-03-29029 March 2018 Amendment - Vogtle Electric Generating Plant Unit 3 LAR 17-027 ML18012A0682018-02-0707 February 2018 Issuance of Amendments Regarding Changes to Surveillance Requirement 3.3.1.3 (CAC Nos. MF9745 and MF9746; EPID L-2017-LLA-0231) ML17214A5462017-10-0202 October 2017 Issuance of Amendments Regarding the Adoption of TSTF-547, Revision 1, Clarification of Rod Position Requirements ML17213A1332017-09-19019 September 2017 Issuance of Amendments Regarding Changes to Technical Specification 3.7.9 to Support Nuclear Service Cooling Water Transfer Pump Repairs ML17198B6332017-09-0505 September 2017 Issuance of Amendments Regarding Technical Specification Requirements for Unavailable Barriers (TSTF-427) ML17186A2762017-08-31031 August 2017 Issuance of Amendments Regarding the Control Room Ventilation System Surveillance Requirements TSTF-522, Rev. 0 ML15127A6692017-08-0808 August 2017 Issuance of Amendment Nos. 188 and 171, Implementation of NEI 06-09, Risk Informed Technical Specifications Initiative 4B, Risk Managed Technical Specification Guidelines ML17152A2182017-06-30030 June 2017 Southern Nuclear Fleet - Issuance of Amendments Regarding the Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (CAC Nos. MF8176 - MF8181) 2024-01-30 |
Text
RCS Specific Activity 3.4.16 FIGURE 3.4.16-1 REACTOR COOLANT DOSE EQUIVALENT I-131 REACTOR COOLANT SPECIFIC ACTIVITY LIMIT VERSUS PERCENT OF RATED THERMAL POWER WITH THE REACTOR COOLANT SPECIFIC ACTIVITY >1 µCi/gram DOSE EQUIVALENT I-131 Vogtle Units 1 and 2 3.4.16-4 Amendment No. 96 (Unit 1)
Amendment No. 74 (Unit 2)